Standard Operating Procedure for Use of Cooling Towers and Condensers in Recovery Process in API Manufacturing

Department API Manufacturing
SOP No. SOP/API/060/2025
Supersedes SOP/API/060/2022
Page No. Page 1 of 10
Issue Date 13/04/2025
Effective Date 15/04/2025
Review Date 13/04/2026

1. Purpose

To establish a controlled and standardized procedure for operating cooling towers and condensers used in solvent recovery during API manufacturing, ensuring safe, efficient, and GMP-compliant condensation of solvent vapors.

2. Scope

This SOP applies to all cooling tower and condenser operations supporting solvent recovery systems within the API manufacturing unit, including distillation columns, vacuum condensers, and storage chillers.

3. Responsibilities

4. Accountability

The Engineering Head is accountable for the reliable performance of cooling and condensation systems. The Production Head is accountable for ensuring the systems are used as per validated recovery protocols.

5. Procedure

5.1 System Preparation

  1. Ensure cooling water is available in the recirculation tank and level is within limits.
  2. Check fan motor, pump, pipelines, and temperature gauges for proper condition.
  3. Clean condenser tubes if fouling is detected as per maintenance SOP.
  4. Ensure proper flow rate and temperature settings are available in the SCADA system or manual logbook.

5.2 Starting the Cooling System

  1. Start the circulation pump of the cooling tower.
  2. Start the condenser unit along with the distillation setup.
  3. Set target cooling water inlet and outlet temperatures (e.g., 28°C in, 35°C out).
  4. Record initial conditions in the “Cooling System Operation Log” (Annexure-1).

5.3 Monitoring During Operation

  1. Check and record:
    • Water flow rate (LPM)
    • Inlet and outlet temperatures
    • Pressure drop across condenser
  2. Ensure condenser remains free from scaling and vapor bypass.
  3. In case of temperature rise above set point:
    • Inspect fan, pump, and water tank levels
    • Check for vapor leaks or fouling

5.4 Stopping the System

  1. After recovery, stop condenser and allow system to cool.
  2. Stop the cooling tower pump and fan.
  3. Clean the condenser and log activity in the “Equipment Cleaning Record”.

5.5 Preventive Maintenance

  1. Engineering team to perform:
    • Descaling of condenser tubes every 3 months
    • Lubrication of fan motor bearings monthly
    • Cooling water quality checks monthly (Annexure-2)

6. Abbreviations

7. Documents

  1. Cooling System Operation Log (Annexure-1)
  2. Cooling Water Quality Report (Annexure-2)

8. References

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Cooling System Operation Log

Date Batch No. Inlet Temp (°C) Outlet Temp (°C) Flow Rate (LPM) Operator
13/04/2025 REC-20250413 28 34 180

Annexure-2: Cooling Water Quality Report

Date pH Hardness (ppm) Conductivity (µS/cm) Chlorides (ppm) Remarks
10/04/2025 7.2 120 140 15 Acceptable

Revision History:

Revision Date Revision No. Details Reason Approved By
01/01/2022 1.0 Initial SOP Release GMP Implementation QA Head
13/04/2025 2.0 Updated with Flow Monitoring and Cleaning Details Audit Suggestion QA Head
Exit mobile version