Aerosol Waste Disposal – SOP Guide for Pharma https://www.pharmasop.in The Ultimate Resource for Pharmaceutical SOPs and Best Practices Sat, 07 Jun 2025 15:23:00 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.1 Aerosol: SOP for Validating HVAC Systems in Aerosol Manufacturing Areas – V 2.0 https://www.pharmasop.in/aerosol-sop-for-validating-hvac-systems-in-aerosol-manufacturing-areas-v-2-0/ Sat, 07 Jun 2025 15:23:00 +0000 https://www.pharmasop.in/?p=8812 Read More “Aerosol: SOP for Validating HVAC Systems in Aerosol Manufacturing Areas – V 2.0” »

]]>
Aerosol: SOP for Validating HVAC Systems in Aerosol Manufacturing Areas – V 2.0

SOP for Validating HVAC Systems in Aerosol Manufacturing Areas

Department Aerosol
SOP No. SOP/Aerosol/142/2025
Supersedes SOP/Aerosol/142/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to provide guidelines for validating Heating, Ventilation, and Air Conditioning (HVAC) systems used in aerosol manufacturing areas. HVAC systems are critical for maintaining environmental conditions within acceptable limits for the production of aerosol products, particularly to control temperature, humidity, and air quality. This SOP ensures that HVAC systems are validated to meet operational requirements and regulatory standards, guaranteeing a controlled environment conducive to the production of quality products.

2. Scope

This SOP applies to the HVAC systems installed in all aerosol manufacturing areas, including production floors, storage rooms, and packaging areas. It covers the validation process, including performance testing, operational qualification, and acceptance criteria to ensure that the HVAC system functions properly and meets the necessary environmental control specifications.

3. Responsibilities

  • Engineering Team: Responsible for overseeing the HVAC system installation, maintenance, and qualification. They ensure that the system is fully operational and that the qualification process is conducted accurately.
  • Maintenance Team: Responsible for maintaining the HVAC system and performing any necessary repairs or adjustments during the qualification process.
  • Quality Assurance (QA) Team: Responsible for reviewing and approving the HVAC system validation documentation, ensuring compliance with GMP and regulatory standards.
  • Production Team: Responsible for reporting any issues related to HVAC performance and assisting with validation activities when necessary.

4. Accountability

The Manufacturing Manager is accountable for ensuring that the HVAC system is validated according to this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

5. Procedure

5.1. Preparing for HVAC System Validation

  1. Ensure that the HVAC system is installed and fully operational in the aerosol manufacturing area. Verify that all components, such as air filters, humidifiers, heaters, and ventilation fans, are working as expected.
  2. Review the HVAC system’s design specifications and operational parameters, including temperature, humidity, airflow rates, filtration efficiency, and pressure differentials between controlled and non-controlled areas.
  3. Verify that the HVAC system has been maintained according to the manufacturer’s recommendations and internal maintenance schedules. Document any recent repairs, adjustments, or upgrades performed on the system.
  4. Establish the validation team, which should include representatives from Engineering, QA, and Production teams. Ensure that all personnel involved are trained in HVAC validation processes and standards.

5.2. Conducting HVAC System Validation

  1. The HVAC system validation process should include the following tests:
    • Temperature Control Test: Verify that the HVAC system maintains the required temperature range (e.g., 20°C to 25°C) throughout the manufacturing area. Test temperature at multiple locations within the area to ensure uniformity.
    • Humidity Control Test: Verify that the system maintains the required humidity levels (e.g., 40% to 60%) and that there are no fluctuations that could impact the quality of the aerosol products. Use calibrated hygrometers to measure humidity at various points.
    • Airflow Test: Measure the airflow rate through the HVAC system, ensuring it meets the specified design parameters. This includes verifying that the air changes per hour (ACH) are adequate to ensure proper ventilation and that air distribution is uniform across the room.
    • Filtration Efficiency Test: Verify that the HVAC system’s air filters effectively remove particulates, microorganisms, and other contaminants from the air. Use particle counters or microbial samplers to assess filter efficiency.
    • Pressure Differential Test: Check the pressure differentials between the controlled environment and adjacent areas to ensure that airflow is in the correct direction (e.g., from clean areas to less clean areas). This prevents the contamination of controlled environments.
  2. During testing, ensure that the HVAC system is running under normal operating conditions and that all measurements are taken at the specified times and locations.
  3. Record all test results, including the measured values, test conditions, and any deviations observed. Document the results in the HVAC System Validation Report (Annexure-1).

5.3. Documenting the Validation Results

  1. Document the following information in the HVAC System Validation Report (Annexure-1):
    • HVAC system ID, model number, serial number, and installation location
    • The test methods and equipment used for validation
    • The results of each test performed, including temperature, humidity, airflow rate, filtration efficiency, and pressure differential
    • The name and signature of the personnel performing the validation tests
    • Approval signatures from the QA team
  2. Ensure that the validation report is signed by the responsible personnel and reviewed by the QA team for accuracy and completeness.

5.4. Reviewing and Approving the Validation Report

  1. The QA team should review the HVAC System Validation Report to ensure that the system meets all operational and cleanliness requirements, and that the system functions as expected under normal operating conditions.
  2. If any deviations are identified during the validation process, they should be documented in the Deviation Log (Annexure-2), and corrective actions should be implemented as necessary.
  3. The QA team should approve the report once all validation activities are complete and any deviations have been addressed.

5.5. Finalizing the Validation Process

  1. Once the HVAC system is validated, it is considered qualified and ready for use in the aerosol manufacturing process. The system can be used without restrictions for production activities.
  2. All documentation, including the HVAC System Validation Report, Deviation Log, and any corrective actions, should be archived for future audits and inspections.
  3. Periodic revalidation of the HVAC system should be scheduled as needed to ensure continued compliance with regulatory requirements and system performance standards.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • OQ: Operational Qualification
  • PQ: Performance Qualification
  • IQ: Installation Qualification

7. Documents

  1. HVAC System Validation Report (Annexure-1)
  2. Deviation Log (Annexure-2)
  3. Corrective Action Log (Annexure-3)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • ISO 14644 – Cleanrooms and associated controlled environments

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: HVAC System Validation Report

System ID Model Number Serial Number Test Date Test Type Result
HVAC-001 Model X SN123456 06/02/2025 Temperature Test Pass
HVAC-001 Model X SN123456 06/02/2025 Humidity Test Pass

Annexure-2: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Airflow rate below specification Adjusted airflow controls Rajesh Patel Completed

Annexure-3: Corrective Action Log

Action ID Action Description Responsible Person Completion Date
CA-12345 Replaced air filters Rajesh Patel 06/02/2025

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated validation procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
]]>
Aerosol: SOP for Qualification of Compressed Air Systems for Aerosols – V 2.0 https://www.pharmasop.in/aerosol-sop-for-qualification-of-compressed-air-systems-for-aerosols-v-2-0/ Fri, 06 Jun 2025 18:33:00 +0000 https://www.pharmasop.in/?p=8811 Read More “Aerosol: SOP for Qualification of Compressed Air Systems for Aerosols – V 2.0” »

]]>
Aerosol: SOP for Qualification of Compressed Air Systems for Aerosols – V 2.0

SOP for Qualification of Compressed Air Systems for Aerosols

Department Aerosol
SOP No. SOP/Aerosol/141/2025
Supersedes SOP/Aerosol/141/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to establish the requirements and procedures for qualifying the compressed air systems used in aerosol manufacturing. Compressed air systems play a critical role in aerosol production, especially in equipment operations such as filling machines, actuators, and cleaning processes. This SOP ensures that the compressed air system is validated to meet quality and regulatory requirements, providing contamination-free, reliable, and consistent performance.

2. Scope

This SOP applies to the qualification of all compressed air systems used in aerosol manufacturing facilities, including air compressors, air filtration units, regulators, and associated distribution systems. The qualification process verifies that the system delivers compressed air within the required parameters and meets operational, cleanliness, and safety standards. It applies to new installations, modifications, and requalification after maintenance or repairs.

3. Responsibilities

  • Engineering Team: Responsible for overseeing the qualification of the compressed air system, ensuring that all tests are performed and that the system meets specified standards for performance and safety.
  • Maintenance Team: Responsible for ensuring that the compressed air system is well-maintained and that any repairs or modifications are documented and evaluated for impact on system qualification.
  • Production Team: Responsible for reporting any operational issues related to the compressed air system and ensuring that the system functions properly during production.
  • Quality Assurance (QA) Team: Responsible for reviewing and approving the compressed air system qualification report to ensure that it complies with GMP and regulatory requirements.

4. Accountability

The Manufacturing Manager is accountable for ensuring that the compressed air system is qualified and maintained according to this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

5. Procedure

5.1. Preparing for Compressed Air System Qualification

  1. Ensure that the compressed air system is fully installed, operational, and ready for qualification testing. This includes the compressor, air filters, regulators, piping, and any other components involved in the compressed air supply.
  2. Verify that all components of the system have been installed according to the manufacturer’s specifications, and that the system is free from any leaks or damage.
  3. Review the equipment’s technical specifications to understand the required performance parameters, including air flow rate, pressure, temperature, and cleanliness standards.
  4. Ensure that the compressed air system is equipped with appropriate filtration to remove particulates, oils, and other contaminants from the air supply, in line with industry standards.
  5. Establish the qualification team, including representatives from Engineering, Production, and QA teams. Ensure that personnel are trained in the qualification process and familiar with the equipment and specifications.

5.2. Performing the Compressed Air System Qualification

  1. The qualification process should include the following tests to ensure that the compressed air system meets the required standards:
    • Airflow and Pressure Test: Verify that the air supply meets the required airflow rate and pressure. This should be done under both normal and peak production conditions. Measure the pressure at key points throughout the system and ensure that it is within the acceptable range.
    • Purity and Cleanliness Test: Verify that the compressed air is free from contaminants, including particulates, oils, and moisture. Use appropriate air quality testing methods such as particle counters and moisture detectors to assess air purity. Compare results to regulatory standards for clean air in manufacturing environments (e.g., ISO 8573 standards).
    • Leak Test: Perform a leak test on the compressed air system to ensure that there are no air leaks in the system, which could affect performance or result in contamination. Use ultrasonic leak detection equipment or other methods to identify and correct any leaks.
    • Temperature Test: Verify that the temperature of the compressed air is within the specified range, typically between 15°C and 25°C. Excessive temperatures can affect the quality of the product and the operation of equipment.
    • Backup System Test: Verify that the backup air supply system, if applicable, functions as intended during system downtime or in case of failure of the primary air compressor.
  2. Record all test results, including measured values, test conditions, and any deviations from the specified parameters. Document the results in the Compressed Air System Qualification Report (Annexure-1).

5.3. Documenting the Qualification Results

  1. Document the following information in the Compressed Air System Qualification Report (Annexure-1):
    • System ID, compressor model, and serial number
    • Test methods and acceptance criteria used during qualification
    • The results of each test performed, including any deviations or non-conformities
    • Corrective actions taken to address any deviations or issues observed during the qualification process
    • The name and signature of the personnel performing the qualification tests
    • Approval signatures from the QA team
  2. Ensure that the qualification report is signed by the responsible personnel and reviewed by the QA team for completeness and accuracy.

5.4. Reviewing and Approving the Qualification Report

  1. The QA team should review the Compressed Air System Qualification Report to ensure that the system meets all operational and cleanliness requirements and that the system functions as expected under normal and peak conditions.
  2. If any deviations are identified during the qualification process, they should be documented in the Deviation Log (Annexure-2), and corrective actions should be taken.
  3. The QA team should approve the report once all qualification activities are complete and any deviations have been addressed.

5.5. Finalizing the Qualification Process

  1. Once the system has been successfully qualified, it is considered ready for use in the aerosol manufacturing process. The system can now be used for production without restriction.
  2. All documentation, including the Compressed Air System Qualification Report, Deviation Log, and any corrective actions, should be archived for future audits and inspections.
  3. Periodic requalification of the compressed air system should be scheduled as needed to ensure continued compliance with regulatory requirements and system performance standards.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • OQ: Operational Qualification
  • PQ: Performance Qualification
  • IQ: Installation Qualification

7. Documents

  1. Compressed Air System Qualification Report (Annexure-1)
  2. Deviation Log (Annexure-2)
  3. Corrective Action Log (Annexure-3)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • ISO 8573 – Compressed Air Quality Standards

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Compressed Air System Qualification Report

System ID Compressor Model Serial Number Test Date Test Type Result
CA-001 Model X SN123456 06/02/2025 Airflow and Pressure Test Pass
CA-001 Model X SN123456 06/02/2025 Purity Test Pass

Annexure-2: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Pressure drop in system Replaced pressure regulator Rajesh Patel Completed

Annexure-3: Corrective Action Log

Action ID Action Description Responsible Person Completion Date
CA-12345 Replaced air filter Rajesh Patel 06/02/2025

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated qualification testing procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
]]>
Aerosol: SOP for Change Control in Equipment Validation – V 2.0 https://www.pharmasop.in/aerosol-sop-for-change-control-in-equipment-validation-v-2-0/ Thu, 05 Jun 2025 21:43:00 +0000 https://www.pharmasop.in/?p=8810 Read More “Aerosol: SOP for Change Control in Equipment Validation – V 2.0” »

]]>
Aerosol: SOP for Change Control in Equipment Validation – V 2.0

SOP for Change Control in Equipment Validation

Department Aerosol
SOP No. SOP/Aerosol/140/2025
Supersedes SOP/Aerosol/140/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to provide guidelines for managing changes to equipment during the validation process in aerosol manufacturing. The SOP ensures that any changes made to the equipment, its components, or its operation are evaluated and documented, with appropriate testing and revalidation conducted to verify that the equipment continues to meet the required specifications and perform as intended.

2. Scope

This SOP applies to all aerosol manufacturing equipment undergoing validation, including equipment used in the filling, crimping, mixing, and packaging stages. It covers the change control process during the equipment validation lifecycle, including the evaluation, documentation, approval, and testing of changes that may affect equipment performance, compliance, or quality.

3. Responsibilities

  • Engineering Team: Responsible for identifying, assessing, and implementing changes to equipment. The team ensures that any changes made are properly documented, and that validation is performed if required.
  • Maintenance Team: Responsible for identifying any maintenance needs or changes required for the equipment and communicating those needs to the Engineering team for evaluation.
  • Production Team: Responsible for identifying and reporting any operational issues that may require changes to the equipment or process, and ensuring that the equipment operates according to specifications after changes are made.
  • Quality Assurance (QA) Team: Responsible for reviewing and approving all changes and ensuring that the equipment revalidation process is followed to maintain compliance with GMP standards and regulatory requirements.
  • Change Control Board (CCB): Responsible for evaluating and approving changes that affect equipment performance, ensuring that the changes do not compromise product quality or compliance.

4. Accountability

The Manufacturing Manager is accountable for ensuring that any changes to equipment during validation are managed according to this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

5. Procedure

5.1. Identifying Changes

  1. Any changes to equipment, its components, or its operation should be identified by the Engineering, Maintenance, or Production teams. These changes may include, but are not limited to:
    • Modification or replacement of equipment parts
    • Changes in machine settings or operating parameters
    • Installation of new software or control systems
    • Upgrades to equipment to meet regulatory requirements or improve performance
  2. All changes should be documented in the Change Control Log (Annexure-1) and submitted for evaluation.

5.2. Evaluating Changes

  1. Upon identification of a change, the Change Control Board (CCB) should be convened to evaluate the impact of the change on equipment performance and product quality. The CCB will consider the following:
    • Whether the change will affect equipment performance, operational parameters, or quality control
    • Whether the change impacts previously conducted validation activities (e.g., Installation Qualification (IQ), Operational Qualification (OQ), Performance Qualification (PQ))
    • Whether revalidation or additional testing is required
    • The regulatory and compliance implications of the change
  2. Document the evaluation results, including the reason for the change and any required actions (e.g., revalidation, retesting, adjustments).

5.3. Implementing Changes

  1. Once a change is approved by the CCB, the necessary modifications should be made to the equipment or process as per the approved change plan.
  2. The Engineering and Maintenance teams are responsible for implementing the changes according to the approved specifications. During implementation, all activities should be documented to ensure traceability and accountability.
  3. If revalidation or additional testing is required, it should be planned and executed as outlined in the original validation protocol or any updated testing protocols.

5.4. Documenting the Change Control Process

  1. All changes must be documented in the Change Control Log (Annexure-1) and should include the following details:
    • Change ID
    • Description of the change
    • Reason for the change
    • Impact on equipment performance, compliance, or product quality
    • Testing or validation required post-change
    • Implementation details
    • Approvals from the Change Control Board and other relevant stakeholders
  2. Ensure that the documentation is clear, complete, and accessible for future reference or audits.

5.5. Revalidating the Equipment After Changes

  1. If the change affects the equipment’s performance, compliance, or product quality, revalidation will be required. This may include:
    • Reinstalling equipment and performing Installation Qualification (IQ)
    • Conducting Operational Qualification (OQ) to ensure the equipment operates as expected
    • Completing Performance Qualification (PQ) to verify the equipment produces the desired product quality
  2. Ensure that all validation tests are documented in the Equipment Revalidation Report (Annexure-2), and any deviations or corrective actions are recorded in the Deviation Log (Annexure-3).
  3. The QA team should review and approve the revalidation results, ensuring that all tests are successful and the equipment is compliant with regulatory requirements.

5.6. Closing the Change Control Process

  1. Once all changes have been implemented and any required revalidation is complete, the Change Control process can be closed.
  2. The Change Control Log should be updated to reflect that the change has been completed and all necessary testing, documentation, and approvals are in place.
  3. Ensure that the final documentation is archived for future audits and inspections.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • OQ: Operational Qualification
  • PQ: Performance Qualification
  • IQ: Installation Qualification

7. Documents

  1. Change Control Log (Annexure-1)
  2. Equipment Revalidation Report (Annexure-2)
  3. Deviation Log (Annexure-3)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • International Council for Harmonisation (ICH) Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Change Control Log

Change ID Change Description Reason for Change Impact Approval Status Implementation Date
CC-001 Installed new sensor in filling machine Improved measurement accuracy No impact on performance Approved 06/02/2025

Annexure-2: Equipment Revalidation Report

Equipment ID Model Number Serial Number Test Date Test Type Result
FILL-001 Model A SN123456 06/02/2025 Revalidation Test Pass

Annexure-3: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Sensor malfunctioned Replaced sensor Rajesh Patel Completed

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated change control procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
]]>
Aerosol: SOP for Revalidating Equipment After Maintenance – V 2.0 https://www.pharmasop.in/aerosol-sop-for-revalidating-equipment-after-maintenance-v-2-0/ Thu, 05 Jun 2025 00:53:00 +0000 https://www.pharmasop.in/?p=8809 Read More “Aerosol: SOP for Revalidating Equipment After Maintenance – V 2.0” »

]]>
Aerosol: SOP for Revalidating Equipment After Maintenance – V 2.0

SOP for Revalidating Equipment After Maintenance

Department Aerosol
SOP No. SOP/Aerosol/139/2025
Supersedes SOP/Aerosol/139/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to outline the process for revalidating aerosol manufacturing equipment after maintenance activities. Revalidation ensures that the equipment continues to perform within specified parameters and meets quality standards after any maintenance, repair, or modification. This SOP ensures that equipment remains compliant with Good Manufacturing Practices (GMP) and regulatory requirements post-maintenance.

2. Scope

This SOP applies to all aerosol manufacturing equipment that undergoes maintenance, including filling machines, crimping machines, mixing tanks, and other related equipment. It covers the revalidation process following maintenance activities, such as routine servicing, repairs, calibration, or modifications that may impact the equipment’s performance.

3. Responsibilities

  • Engineering Team: Responsible for conducting revalidation tests after maintenance, ensuring that all equipment parameters are restored to their intended specifications.
  • Maintenance Team: Responsible for performing the maintenance activities on equipment and ensuring that it is ready for revalidation once maintenance is complete.
  • Production Team: Responsible for assisting with the revalidation process, ensuring that equipment is operating correctly during production, and reporting any deviations.
  • Quality Assurance (QA) Team: Responsible for reviewing and approving the revalidation process and ensuring that all test results, deviations, and corrective actions are documented and compliant with regulatory requirements.

4. Accountability

The Manufacturing Manager is accountable for ensuring that revalidation of equipment after maintenance is performed in compliance with this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

5. Procedure

5.1. Preparing for Revalidation

  1. Ensure that the equipment has undergone the necessary maintenance or repair work and is restored to full functionality. This may include cleaning, calibration, component replacement, or adjustments to machine settings.
  2. Review the maintenance records to ensure that the equipment was serviced according to the manufacturer’s instructions or internal SOPs.
  3. Confirm that all necessary tools and resources for revalidation (e.g., calibration equipment, testing instruments, test materials) are available and ready for use.
  4. Verify that any new components, parts, or software installed during maintenance have been properly tested for compatibility and compliance with operational standards.
  5. Establish the revalidation team, which should include members from the Engineering, Production, and QA teams. Ensure that the personnel involved are trained on revalidation procedures and equipment specifications.

5.2. Conducting the Revalidation

  1. Revalidation testing should be conducted in the same manner as the initial qualification or after significant modifications. The following tests should be performed:
    • Functional Test: Verify that the equipment operates according to the specifications defined during the initial qualification process. This includes checking for any changes in machine speed, pressure, temperature, or other critical parameters.
    • Performance Test: Perform the same tests used during the original Operational Qualification (OQ) and Performance Qualification (PQ) to verify that the equipment produces consistent and reliable results. For example, check filling accuracy, crimping consistency, or mixing efficiency, as applicable.
    • Calibration Test: If any components were calibrated or adjusted during maintenance, ensure that the calibration is verified against a known standard. For example, calibrate temperature sensors, pressure gauges, or other measurement instruments used by the equipment.
    • Safety Test: Verify that all safety features are working correctly, such as emergency stops, alarms, or protective shields, and that they have not been impacted by the maintenance activities.
    • System Integration Test: If the equipment is connected to a larger system (e.g., automated control systems, data collection systems), verify that the integration is functioning as expected, with no data discrepancies or communication failures.
  2. During testing, record all test results, including the test conditions, measurements, and any deviations observed. Document the results in the Equipment Revalidation Report (Annexure-1).

5.3. Documenting the Revalidation Results

  1. Document the following information in the Equipment Revalidation Report (Annexure-1):
    • Equipment ID, model number, serial number, and location
    • Details of the maintenance activities performed on the equipment
    • Test methods and acceptance criteria used during revalidation
    • The results of each test performed, including any deviations or non-conformities
    • Corrective actions taken if any deviations are observed during the revalidation process
    • The name and signature of the personnel who performed the revalidation tests
    • The approval signatures from the QA team
  2. Ensure that the revalidation report is signed by the responsible personnel and reviewed by the QA team for accuracy and completeness.

5.4. Reviewing and Approving the Revalidation Report

  1. The QA team should review the Equipment Revalidation Report to ensure that the equipment meets the required specifications after maintenance and that all tests were conducted in compliance with the validation protocol.
  2. If any deviations are identified during revalidation, they should be documented in the Deviation Log (Annexure-2). Corrective actions should be implemented, and the tests should be repeated to verify the effectiveness of the corrective actions.
  3. The QA team should approve the report once all revalidation activities are complete and any deviations have been addressed.

5.5. Finalizing the Revalidation Process

  1. Once the equipment has been successfully revalidated, it is considered ready for use in regular production. The equipment can be returned to service.
  2. All documentation, including the Equipment Revalidation Report, Deviation Log, and any corrective actions, should be archived for future audits and inspections.
  3. Periodic revalidation should be scheduled, as needed, to ensure that the equipment continues to perform within the required specifications after any future maintenance or repairs.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • OQ: Operational Qualification
  • PQ: Performance Qualification
  • IQ: Installation Qualification

7. Documents

  1. Equipment Revalidation Report (Annexure-1)
  2. Deviation Log (Annexure-2)
  3. Corrective Action Log (Annexure-3)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • International Council for Harmonisation (ICH) Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Equipment Revalidation Report

Equipment ID Model Number Serial Number Test Date Test Type Result
FILL-001 Model A SN123456 06/02/2025 Revalidation Test Pass
FILL-001 Model A SN123456 06/02/2025 Performance Test Pass

Annexure-2: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Temperature deviation during testing Recalibrated temperature control system Rajesh Patel Completed

Annexure-3: Corrective Action Log

Action ID Action Description Responsible Person Completion Date
CA-12345 Recalibrated temperature control Rajesh Patel 06/02/2025

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated revalidation procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
]]>
Aerosol: SOP for Documenting Equipment Qualification Reports – V 2.0 https://www.pharmasop.in/aerosol-sop-for-documenting-equipment-qualification-reports-v-2-0/ Wed, 04 Jun 2025 04:03:00 +0000 https://www.pharmasop.in/?p=8808 Read More “Aerosol: SOP for Documenting Equipment Qualification Reports – V 2.0” »

]]>
Aerosol: SOP for Documenting Equipment Qualification Reports – V 2.0

SOP for Documenting Equipment Qualification Reports

Department Aerosol
SOP No. SOP/Aerosol/138/2025
Supersedes SOP/Aerosol/138/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to establish guidelines for documenting equipment qualification reports for aerosol manufacturing equipment. Documenting equipment qualification ensures that all aspects of the qualification process are captured and maintained in a manner that is compliant with GMP standards and regulatory requirements. This SOP will help ensure that equipment qualification results are properly documented, reviewed, and approved.

2. Scope

This SOP applies to the documentation of equipment qualification reports for all aerosol manufacturing equipment, including filling machines, crimping machines, mixing tanks, and other equipment used in production. The procedure covers the steps to document the qualification process, including recording test results, deviations, corrective actions, and approvals for both installation, operational, and performance qualification stages.

3. Responsibilities

  • Engineering Team: Responsible for conducting the qualification tests on the equipment and ensuring that all data is accurately recorded in the qualification reports.
  • Production Team: Responsible for assisting in equipment qualification by providing operational details and ensuring that equipment is tested according to established procedures.
  • Quality Assurance (QA) Team: Responsible for reviewing and approving the equipment qualification reports to ensure that they are compliant with GMP standards and regulatory requirements.
  • Maintenance Team: Responsible for maintaining equipment in optimal working condition and ensuring that any corrective actions arising from equipment qualification are addressed.

4. Accountability

The Manufacturing Manager is accountable for ensuring that equipment qualification reports are prepared and documented as per this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

5. Procedure

5.1. Preparing the Equipment Qualification Report

  1. Before beginning the qualification process, ensure that the equipment is installed and operational as per the Installation Qualification (IQ) standards.
  2. For each qualification phase (IQ, OQ, PQ), ensure that all test procedures are documented, including test methods, acceptance criteria, equipment details, test conditions, and any deviations observed during testing.
  3. Include the following sections in the qualification report:
    • Introduction: Brief overview of the equipment being qualified, including its model, serial number, and intended use in aerosol manufacturing.
    • Test Objectives: The specific goals of the qualification process (e.g., verifying equipment performance, ensuring compliance with specifications, confirming proper installation and operation).
    • Test Methodology: A detailed description of the test methods, procedures, and instruments used during the qualification process, including any calibration or validation protocols followed.
    • Acceptance Criteria: The criteria that must be met for the equipment to be considered qualified (e.g., performance tolerance, speed, accuracy).
    • Results: Document the results of each test performed, including numerical values, pass/fail status, and any relevant observations.
    • Deviation Log: If any deviations from the expected results or protocols occur, document them here. Include the corrective actions taken to address the deviations and the outcomes of those actions.
    • Conclusion: Summary of the qualification results, including whether the equipment meets the specified criteria and is ready for use in production.
    • Approval Section: Signature of the personnel performing the qualification and those reviewing and approving the qualification results.
  4. Ensure that all data recorded in the qualification report is accurate and complete.

5.2. Documenting Deviations

  1. If any deviations occur during the qualification process, they must be documented in the Deviation Log (Annexure-1). The log should include the following:
    • Deviation ID
    • Deviation description
    • Cause of the deviation
    • Corrective action taken
    • Verification of the corrective action
    • Status of the deviation (e.g., resolved, pending)
  2. Ensure that all deviations are addressed and that corrective actions are verified and documented in the qualification report.

5.3. Reviewing and Approving the Equipment Qualification Report

  1. The QA team should review the Equipment Qualification Report to ensure that it meets all applicable standards and that all test results, deviations, and corrective actions are appropriately documented.
  2. Ensure that all sections of the report are filled out, and the information is clear and concise. The report should be easy to interpret for future audits or reviews.
  3. The QA team should approve the report once all tests have been performed, any deviations have been addressed, and the equipment is confirmed to meet the acceptance criteria.

5.4. Archiving the Equipment Qualification Report

  1. Once the Equipment Qualification Report is approved, ensure that it is stored in a secure, controlled location with access limited to authorized personnel.
  2. All documentation related to the qualification process, including the test results, deviation logs, and corrective actions, should be archived for future reference and audits.
  3. Maintain records in accordance with GMP and regulatory requirements for a defined retention period, ensuring that they are available for review by regulatory bodies when necessary.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • IQ: Installation Qualification
  • OQ: Operational Qualification
  • PQ: Performance Qualification

7. Documents

  1. Equipment Qualification Report (Annexure-1)
  2. Deviation Log (Annexure-2)
  3. Corrective Action Log (Annexure-3)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • International Council for Harmonisation (ICH) Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Equipment Qualification Report

Equipment ID Model Number Serial Number Test Date Test Type Result
FILL-001 Model A SN123456 06/02/2025 IQ Test Pass
FILL-001 Model A SN123456 06/02/2025 OQ Test Pass

Annexure-2: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Calibration deviation Recalibrated equipment Rajesh Patel Completed

Annexure-3: Corrective Action Log

Action ID Action Description Responsible Person Completion Date
CA-12345 Recalibrated equipment Rajesh Patel 06/02/2025

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated documentation and corrective action procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
]]>
Aerosol: SOP for Validating Mixing Tanks Used in Formulation – V 2.0 https://www.pharmasop.in/aerosol-sop-for-validating-mixing-tanks-used-in-formulation-v-2-0/ Tue, 03 Jun 2025 07:13:00 +0000 https://www.pharmasop.in/?p=8807 Read More “Aerosol: SOP for Validating Mixing Tanks Used in Formulation – V 2.0” »

]]>
Aerosol: SOP for Validating Mixing Tanks Used in Formulation – V 2.0

SOP for Validating Mixing Tanks Used in Formulation

Department Aerosol
SOP No. SOP/Aerosol/137/2025
Supersedes SOP/Aerosol/137/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to outline the procedure for validating mixing tanks used in the formulation of aerosol products. This SOP ensures that mixing tanks meet the required specifications and perform effectively to maintain the consistency and quality of the formulation. Validation of mixing tanks is essential to ensure that the proper mixing conditions, including time, speed, temperature, and homogeneity, are achieved and consistently maintained during production.

2. Scope

This SOP applies to all mixing tanks used in aerosol manufacturing, including those used for blending raw materials, propellants, and active ingredients. It covers the validation process to verify that the mixing tanks function as expected, ensuring that all specified parameters are met and that the mixing process does not affect the quality of the final product.

3. Responsibilities

  • Engineering Team: Responsible for overseeing the validation process for mixing tanks and ensuring that all tests are performed according to the defined procedures and specifications.
  • Production Team: Responsible for assisting with the validation process by performing the necessary tests and documenting the mixing process during production runs.
  • Quality Assurance (QA) Team: Responsible for reviewing, approving, and ensuring that the validation protocol complies with GMP standards and regulatory requirements.
  • Maintenance Team: Responsible for ensuring the proper maintenance and calibration of the mixing tanks, and addressing any issues that arise during the validation process.

4. Accountability

The Manufacturing Manager is accountable for ensuring that the mixing tank validation process is carried out according to this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

5. Procedure

5.1. Preparing for Mixing Tank Validation

  1. Ensure that the mixing tank is clean and free from any contaminants before starting the validation process.
  2. Verify that all necessary equipment for validation, including calibration tools, test products, and monitoring instruments (e.g., thermometers, flow meters), are available and functional.
  3. Review the manufacturer’s specifications and technical manuals for the mixing tank to understand the operating parameters that must be validated (e.g., mixing speed, temperature control, pressure limits).
  4. Establish the validation team, which should include members from the Engineering, Production, and QA teams.
  5. Ensure that the mixing tank is installed properly and is free of any mechanical defects that could affect its performance during validation.

5.2. Conducting the Mixing Tank Validation

  1. Perform the following tests as part of the mixing tank validation process:
    • Mixing Speed Test: Verify that the tank’s mixing speed is adjustable and functions within the specified range. Test the speed using a calibrated tachometer or other suitable measurement devices.
    • Mixing Time Test: Verify that the specified mixing time is sufficient for achieving a homogenous mixture. Use sample collection at different time intervals during the mixing process to check for uniformity in the product.
    • Temperature Control Test: Verify that the mixing tank can maintain the required temperature throughout the mixing process. Use calibrated thermometers to check the temperature at multiple points within the tank during mixing.
    • Homogeneity Test: Verify that the formulation is homogeneous by taking samples from different locations in the tank and testing for consistency. The samples should be analyzed for uniformity of active ingredient concentration, viscosity, and other critical parameters.
    • Pressure Test: Verify that the tank can maintain pressure if the process requires it (e.g., in the case of pressurized mixing). Perform leak tests to confirm that the tank does not lose pressure during the mixing process.
  2. During testing, record all test results, including the test conditions, measured values, and any deviations observed. Document the results in the Mixing Tank Validation Report (Annexure-1).

5.3. Documenting the Validation Results

  1. Document the following information in the Mixing Tank Validation Report (Annexure-1):
    • Mixing tank ID, model number, serial number, and location
    • The test parameters and conditions, including mixing speed, time, temperature, and pressure
    • The results of each validation test, including any deviations or non-conformities
    • The corrective actions taken to address any issues encountered during testing
    • The name and signature of the personnel performing the tests
    • The approval signatures from the QA team
  2. Ensure that the validation report is signed by the responsible personnel and reviewed by the QA team for accuracy and completeness.

5.4. Reviewing and Approving the Validation Report

  1. The QA team should review the Mixing Tank Validation Report to ensure that all tests were conducted according to the protocol and that the tank meets the required specifications for performance.
  2. If any deviations are observed during the validation process, they should be documented in the Deviation Log (Annexure-2). Corrective actions should be implemented, and the tests should be repeated to verify the effectiveness of the corrective actions.
  3. The QA team should approve the report once all validation activities are complete and any deviations have been addressed.

5.5. Finalizing the Validation Process

  1. Once the mixing tank is validated, it is considered qualified and can be used for regular production activities.
  2. All documentation, including the Mixing Tank Validation Report, Deviation Log, and any corrective actions, should be archived for future audits and inspections.
  3. Periodic revalidation and calibration activities should be scheduled as per the manufacturer’s recommendations and regulatory requirements.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • OQ: Operational Qualification
  • PQ: Performance Qualification
  • IQ: Installation Qualification

7. Documents

  1. Mixing Tank Validation Report (Annexure-1)
  2. Deviation Log (Annexure-2)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • International Council for Harmonisation (ICH) Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Mixing Tank Validation Report

Equipment ID Model Number Serial Number Test Date Test Type Result
MIX-001 Model A SN123456 06/02/2025 Mixing Speed Test Pass
MIX-001 Model A SN123456 06/02/2025 Homogeneity Test Pass

Annexure-2: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Temperature deviation during mixing Recalibrated temperature control system Rajesh Patel Completed

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated validation testing procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
]]>
Aerosol: SOP for Validating Temperature Sensors in Aerosol Manufacturing – V 2.0 https://www.pharmasop.in/aerosol-sop-for-validating-temperature-sensors-in-aerosol-manufacturing-v-2-0/ Mon, 02 Jun 2025 10:23:00 +0000 https://www.pharmasop.in/?p=8806 Read More “Aerosol: SOP for Validating Temperature Sensors in Aerosol Manufacturing – V 2.0” »

]]>
Aerosol: SOP for Validating Temperature Sensors in Aerosol Manufacturing – V 2.0

SOP for Validating Temperature Sensors in Aerosol Manufacturing

Department Aerosol
SOP No. SOP/Aerosol/136/2025
Supersedes SOP/Aerosol/136/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to provide guidelines for the validation of temperature sensors used in aerosol manufacturing. Temperature sensors are critical for monitoring and controlling temperatures during the production process, including the filling, mixing, and curing stages. This SOP ensures that temperature sensors are accurate, reliable, and calibrated according to defined standards, ensuring that product quality and safety are maintained.

2. Scope

This SOP applies to the validation of all temperature sensors used in aerosol manufacturing processes, including those used in mixers, filling machines, storage tanks, and any other temperature-sensitive equipment. The validation process includes the calibration of the temperature sensors, verification of their accuracy, and the documentation of the results.

3. Responsibilities

  • Engineering Team: Responsible for overseeing the validation process for temperature sensors, ensuring that the sensors are calibrated and functioning properly according to the defined standards.
  • Production Team: Responsible for ensuring the proper operation of the temperature sensors during the manufacturing process and reporting any discrepancies or malfunctions.
  • Quality Assurance (QA) Team: Responsible for reviewing and approving the temperature sensor validation documentation, ensuring that the validation meets regulatory standards and GMP requirements.
  • Maintenance Team: Responsible for maintaining the temperature sensors and performing corrective actions if any issues are detected during the validation process.

4. Accountability

The Manufacturing Manager is accountable for ensuring that the temperature sensor validation process is conducted and documented in compliance with this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

5. Procedure

5.1. Preparing for Temperature Sensor Validation

  1. Before starting the validation process, ensure that all temperature sensors are installed correctly and in their designated locations. Verify that the sensors are properly connected to the measurement system and that the system is operational.
  2. Ensure that all necessary calibration equipment is available, including calibration thermometers, standard reference materials, and temperature-controlled baths or ovens.
  3. Verify that the temperature sensors are clean and free from any contaminants or damage before conducting the validation.
  4. Review the manufacturer’s specifications for the temperature sensors to understand the required calibration methods, acceptable tolerance limits, and the performance characteristics of the sensors.
  5. Establish the validation team, which should include representatives from the Engineering, Production, and QA teams.

5.2. Conducting the Temperature Sensor Validation

  1. Perform the following tests as part of the temperature sensor validation process:
    • Calibration Test: Use a calibrated reference thermometer or temperature calibration device to measure the temperature at several points across the sensor’s operational range. The temperature sensor readings should be compared to the reference thermometer readings to verify accuracy.
    • Accuracy Test: Test the temperature sensor by measuring known temperature standards (e.g., ice water at 0°C and boiling water at 100°C) to ensure that the sensor provides accurate readings under controlled conditions.
    • Repeatability Test: Repeat the calibration test multiple times to ensure that the sensor consistently provides the same readings under the same conditions.
    • Linear Range Test: Verify that the temperature sensor provides consistent and linear readings across its specified temperature range. Use known temperature standards to confirm the sensor’s linearity.
    • Environmental Testing: Verify that the temperature sensor operates correctly under the environmental conditions in which it will be used (e.g., ambient temperature, humidity). Ensure that the sensor’s performance is not affected by factors outside the specified operating range.
  2. Record all test results, including the test conditions, measured values, and any deviations observed. Document the calibration, accuracy, and repeatability results in the Temperature Sensor Validation Report (Annexure-1).

5.3. Documenting the Validation Results

  1. Document the following information in the Temperature Sensor Validation Report (Annexure-1):
    • Details of the temperature sensor, including the model, serial number, and installation location
    • The reference calibration standards used for testing
    • The results of each validation test (e.g., calibration, accuracy, repeatability, linear range)
    • The name and signature of the personnel who performed the validation tests
    • The date and time of testing
  2. Ensure that the validation report is signed and approved by the responsible personnel (e.g., Engineering, Production, and QA teams).

5.4. Reviewing and Approving the Validation Report

  1. The QA team should review the Temperature Sensor Validation Report to ensure that all tests have been conducted according to the protocol and that the sensor meets the required accuracy and performance specifications.
  2. If any deviations are observed during the validation process, they should be documented in the Deviation Log (Annexure-2), and corrective actions should be taken.
  3. The QA team should approve the report once all validation activities are complete and any deviations have been addressed.

5.5. Finalizing the Validation Process

  1. Once the temperature sensor is validated, it is considered ready for use in the aerosol manufacturing process. The validated sensor can be used for ongoing temperature monitoring and control during production.
  2. All documentation, including the Temperature Sensor Validation Report, Deviation Log, and any corrective actions, should be archived for future audits and inspections.
  3. Periodic revalidation and calibration activities should be scheduled as per the manufacturer’s recommendations and regulatory requirements.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • OQ: Operational Qualification
  • PQ: Performance Qualification
  • IQ: Installation Qualification

7. Documents

  1. Temperature Sensor Validation Report (Annexure-1)
  2. Deviation Log (Annexure-2)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • International Council for Harmonisation (ICH) Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Temperature Sensor Validation Report

Sensor ID Model Number Serial Number Test Date Test Type Result
TS-001 Model X SN123456 06/02/2025 Calibration Test Pass
TS-001 Model X SN123456 06/02/2025 Accuracy Test Pass

Annexure-2: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Temperature sensor inaccurate Recalibrated sensor Rajesh Patel Completed

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated temperature validation procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
]]>
Aerosol: SOP for Preparing Equipment Validation Protocols – V 2.0 https://www.pharmasop.in/aerosol-sop-for-preparing-equipment-validation-protocols-v-2-0/ Sun, 01 Jun 2025 13:33:00 +0000 https://www.pharmasop.in/?p=8805 Read More “Aerosol: SOP for Preparing Equipment Validation Protocols – V 2.0” »

]]>
Aerosol: SOP for Preparing Equipment Validation Protocols – V 2.0

SOP for Preparing Equipment Validation Protocols

Department Aerosol
SOP No. SOP/Aerosol/135/2025
Supersedes SOP/Aerosol/135/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to provide detailed guidelines for preparing equipment validation protocols for aerosol manufacturing equipment. Equipment validation protocols are essential to verify that the equipment functions as intended and meets the required performance specifications. This SOP ensures that the protocols are created following industry standards, ensuring equipment reliability, quality, and compliance with regulatory requirements.

2. Scope

This SOP applies to the preparation of equipment validation protocols for all aerosol manufacturing equipment, including filling machines, crimping machines, mixers, and other related equipment used in production. It covers the general process for preparing the validation protocol, including outlining the objectives, scope, test methods, acceptance criteria, and personnel responsibilities.

3. Responsibilities

  • Engineering Team: Responsible for preparing the equipment validation protocol, ensuring that it includes the correct testing parameters and aligns with equipment specifications.
  • Production Team: Responsible for providing input on the practical aspects of equipment operation and assisting with testing during the validation process.
  • Quality Assurance (QA) Team: Responsible for reviewing, approving, and ensuring that the equipment validation protocol complies with GMP standards and regulatory requirements.
  • Validation Team: Responsible for executing the validation protocol and documenting the results during the equipment validation process.

4. Accountability

The Manufacturing Manager is accountable for ensuring that equipment validation protocols are prepared and executed as part of the equipment qualification process. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

5. Procedure

5.1. Preparing the Equipment Validation Protocol

  1. The equipment validation protocol should be prepared for each piece of equipment used in aerosol manufacturing. The protocol should be developed before the equipment is installed or used for production purposes.
  2. The validation protocol should include the following sections:
    • Objective: The objective of the validation process, specifying what the validation aims to achieve (e.g., confirming equipment functionality, verifying performance criteria).
    • Scope: A description of the equipment to be validated, including its model, serial number, location, and any relevant operational parameters.
    • Acceptance Criteria: The criteria that must be met for the equipment to be considered validated. These should be based on manufacturer specifications and regulatory requirements, such as filling accuracy, cycle time, crimping consistency, etc.
    • Test Methods: The test methods that will be used to verify the equipment’s performance. These may include functional tests, performance tests, and safety checks.
    • Responsibilities: The roles and responsibilities of the personnel involved in the validation process, including those responsible for performing the tests, reviewing the results, and approving the protocol.
    • Documentation: The documentation requirements for the validation process, including forms, test logs, and any required reports (e.g., Validation Report, Deviation Log).
    • Schedule: The timeline for completing the validation process, including testing and approval stages.
  3. The protocol should be tailored to the specific equipment and its intended use in aerosol manufacturing, ensuring that all relevant performance aspects are covered.
  4. Ensure that the validation protocol is comprehensive, clear, and free from ambiguities, outlining all necessary steps for successful validation.

5.2. Reviewing the Validation Protocol

  1. Once the equipment validation protocol is prepared, it should be reviewed by the Engineering, Production, and QA teams to ensure that it is comprehensive, accurate, and compliant with regulatory standards.
  2. The protocol should be checked to ensure that the following points are addressed:
    • All necessary performance parameters and test conditions are specified.
    • The acceptance criteria are achievable and aligned with equipment specifications.
    • The roles and responsibilities of personnel involved in validation are clearly defined.
  3. Any discrepancies or missing information should be addressed before the protocol is approved for execution.
  4. Once the review is complete, the protocol should be approved by the QA team, and the final version should be signed and dated by the responsible personnel.

5.3. Approving the Validation Protocol

  1. After review and revisions, the finalized validation protocol should be approved by the QA team. The approval process ensures that the protocol meets GMP and regulatory requirements and that the tests will be effective in verifying the equipment’s performance.
  2. The approved protocol should be stored in a secure location, easily accessible for reference during the validation process and audits.

5.4. Implementing the Validation Protocol

  1. Once the protocol is approved, the validation process can begin. The validation team should follow the protocol exactly as outlined, performing all necessary tests and documenting the results.
  2. Ensure that all deviations from the protocol are documented in the Deviation Log (Annexure-1), and corrective actions are taken as necessary.
  3. After completion of the validation tests, the results should be compiled into a Validation Report (Annexure-2), and any corrective actions taken should be documented and reviewed by the QA team.

5.5. Finalizing and Storing the Validation Protocol

  1. Once the validation process is complete and the equipment has been approved for use, the validation protocol and all associated documentation (e.g., test results, deviation logs) should be archived for future reference and audits.
  2. All documentation should be maintained in a secure location with controlled access to ensure compliance with GMP guidelines and regulatory requirements.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • OQ: Operational Qualification
  • PQ: Performance Qualification

7. Documents

  1. Equipment Validation Protocol (Annexure-1)
  2. Validation Report (Annexure-2)
  3. Deviation Log (Annexure-3)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • International Council for Harmonisation (ICH) Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Equipment Validation Protocol

Protocol ID Equipment ID Test Parameters Acceptance Criteria Test Date Results
EVP-001 FILL-001 Filling Accuracy, Cycle Time, Pressure ±0.5% for filling accuracy 06/02/2025 Pass

Annexure-2: Validation Report

Test Type Test Results Deviations Corrective Action
Filling Accuracy ±0.2% deviation No deviation None

Annexure-3: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Filling accuracy out of tolerance Recalibrated the machine Rajesh Patel Completed

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated protocol preparation procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
]]>
Aerosol: SOP for Validating Weighing Balances in Aerosol Manufacturing – V 2.0 https://www.pharmasop.in/aerosol-sop-for-validating-weighing-balances-in-aerosol-manufacturing-v-2-0/ Sat, 31 May 2025 16:43:00 +0000 https://www.pharmasop.in/?p=8804 Read More “Aerosol: SOP for Validating Weighing Balances in Aerosol Manufacturing – V 2.0” »

]]>
Aerosol: SOP for Validating Weighing Balances in Aerosol Manufacturing – V 2.0

SOP for Validating Weighing Balances in Aerosol Manufacturing

Department Aerosol
SOP No. SOP/Aerosol/134/2025
Supersedes SOP/Aerosol/134/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to establish guidelines for the validation of weighing balances used in aerosol manufacturing. The SOP ensures that the weighing balances used for measuring raw materials, formulations, and other ingredients meet the required accuracy, reliability, and performance standards. Validation is crucial for ensuring that the weighing equipment performs consistently and accurately throughout the manufacturing process.

2. Scope

This SOP applies to all weighing balances used in aerosol manufacturing operations. It covers the procedures for validating the performance and accuracy of these balances, including calibration, testing, and documentation of results. The validation process should be performed whenever a new balance is installed, following significant maintenance or calibration, or as part of routine quality control checks.

3. Responsibilities

  • Engineering Team: Responsible for overseeing the calibration and validation process for weighing balances, ensuring that they meet the required specifications.
  • Production Team: Responsible for assisting with the validation process by using the weighing balances according to standard operating procedures and documenting any necessary details during routine usage.
  • Quality Assurance (QA) Team: Responsible for reviewing and approving the validation documentation and ensuring that the process complies with Good Manufacturing Practices (GMP) and regulatory standards.
  • Maintenance Team: Responsible for maintaining the weighing balances and performing corrective actions if any issues are detected during the validation process.

4. Accountability

The Manufacturing Manager is accountable for ensuring that all weighing balances are validated before use and periodically throughout their operational life. The QA Manager is responsible for overseeing the compliance of this SOP and ensuring that validation results are properly documented and reviewed.

5. Procedure

5.1. Preparing for Weighing Balance Validation

  1. Ensure that the weighing balance is clean and in proper working condition before starting the validation process.
  2. Verify that all necessary materials and tools are available for validation, including calibrated test weights, documentation forms, and validation protocol.
  3. Check the manufacturer’s manual for specific requirements related to the installation, calibration, and validation procedures for the balance.
  4. Confirm that the weighing balance is installed on a stable surface and that it is leveled properly.
  5. Ensure that the balance is connected to the necessary utilities (e.g., power supply, network) and that it is operational.

5.2. Validating the Weighing Balance

  1. Follow the specific calibration procedure as outlined in the balance’s user manual or the standard operating procedure for calibration. Ensure that the calibration is performed at multiple points across the specified range of the balance.
  2. Perform the following tests as part of the validation process:
    • Zero Balance Test: Verify that the balance reads zero when no weight is placed on it.
    • Repeatability Test: Weigh a standard test weight multiple times (at least 10) to ensure that the balance provides consistent readings. The deviation between measurements should be within the allowable limits specified in the balance’s technical specifications.
    • Linearity Test: Weigh a series of standard test weights across the full range of the balance to check that the readings are consistent and linear. Any deviations should be noted and corrected.
    • Accuracy Test: Use known test weights to confirm that the balance provides accurate readings. Compare the balance’s readings with the known weight values. The deviation should be within the acceptable tolerance limits specified by the manufacturer.
    • Environmental Testing: Verify that the balance operates correctly under the environmental conditions in which it will be used (e.g., temperature, humidity). Ensure that the balance is not affected by environmental factors outside the specified operating range.
  3. Record all test results, including the values measured during each test and any deviations observed. Document the actions taken to resolve any issues, including recalibration or maintenance performed.

5.3. Documenting the Validation Results

  1. Document the results of the weighing balance validation in the Validation Report (Annexure-1). The report should include:
    • Equipment ID, model, serial number, and location of the balance
    • Details of the calibration and testing performed (e.g., zero test, repeatability, accuracy, linearity, environmental testing)
    • The results of each test, including any deviations or non-conformities
    • The corrective actions taken if any issues were observed during validation
    • The name and signature of the personnel who performed the validation and reviewed the results
  2. Ensure that the validation report is signed and approved by the Engineering team, Production team, and QA team.

5.4. Reviewing and Approving the Validation Report

  1. The QA team should review the Validation Report to ensure that all tests have been conducted according to the established protocol and that the weighing balance meets the required accuracy and performance specifications.
  2. If any deviations are observed during validation, they should be documented in the Deviation Log (Annexure-2). Corrective actions should be implemented, and the validation process should be repeated if necessary.
  3. The QA team should approve the report once all validation activities are complete, and any corrective actions have been implemented.

5.5. Finalizing the Validation Process

  1. Once the validation is approved, the weighing balance is considered validated and can be used for regular production operations.
  2. All documentation, including the Validation Report and any supporting documents (e.g., deviation reports, corrective actions), should be archived and easily accessible for future audits or reviews.
  3. Schedule periodic revalidation and calibration activities as per the manufacturer’s recommendations and regulatory requirements.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • IQ: Installation Qualification
  • OQ: Operational Qualification
  • PQ: Performance Qualification

7. Documents

  1. Weighing Balance Validation Report (Annexure-1)
  2. Deviation Log (Annexure-2)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • International Council for Harmonisation (ICH) Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Weighing Balance Validation Report

Equipment ID Model Number Serial Number Test Date Test Type Result
WB-001 Model X SN123456 06/02/2025 Zero Test Pass
WB-001 Model X SN123456 06/02/2025 Repeatability Test Pass

Annexure-2: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Repeatability test failed Recalibrated balance Rajesh Patel Completed

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated validation testing procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
]]>
Aerosol: SOP for Performance Qualification (PQ) of Aerosol Crimping Machines – V 2.0 https://www.pharmasop.in/aerosol-sop-for-performance-qualification-pq-of-aerosol-crimping-machines-v-2-0/ Fri, 30 May 2025 19:53:00 +0000 https://www.pharmasop.in/?p=8803 Read More “Aerosol: SOP for Performance Qualification (PQ) of Aerosol Crimping Machines – V 2.0” »

]]>
Aerosol: SOP for Performance Qualification (PQ) of Aerosol Crimping Machines – V 2.0

SOP for Performance Qualification (PQ) of Aerosol Crimping Machines

Department Aerosol
SOP No. SOP/Aerosol/133/2025
Supersedes SOP/Aerosol/133/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to outline the process for performing Performance Qualification (PQ) of aerosol crimping machines. PQ verifies that the crimping machine consistently performs its intended function under normal operating conditions and meets all performance specifications. The goal is to ensure that the machine is capable of reliably and efficiently producing aerosol products that meet quality standards.

2. Scope

This SOP applies to the Performance Qualification of all aerosol crimping machines used in the manufacturing process. The PQ process covers the verification of machine performance, including crimping consistency, sealing quality, and operational reliability over extended production runs.

3. Responsibilities

  • Engineering Team: Responsible for overseeing the Performance Qualification process, performing required tests, and ensuring machine performance meets the specifications.
  • Production Team: Responsible for assisting with the setup and operation of the crimping machine during the PQ process and documenting the performance results.
  • Quality Assurance (QA) Team: Responsible for reviewing the PQ documentation, approving the PQ report, and ensuring that the machine is qualified for use in production.
  • Maintenance Team: Responsible for ensuring that the crimping machine is in optimal condition prior to performing the PQ and addressing any maintenance issues that arise during the process.

4. Accountability

The Manufacturing Manager is accountable for ensuring that the Performance Qualification of the aerosol crimping machines is carried out in compliance with this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

5. Procedure

5.1. Preparing for Performance Qualification

  1. Before starting the PQ process, ensure that the aerosol crimping machine has successfully passed the Installation Qualification (IQ) and Operational Qualification (OQ) stages.
  2. Ensure that all necessary equipment and materials are available, including aerosol cans, valves, propellants, and sealing materials.
  3. Verify that the crimping machine is clean, calibrated, and in good working condition before conducting the PQ process.
  4. Ensure that the performance specifications for the crimping machine, as outlined by the manufacturer and internal quality standards, are available for reference during the PQ process.
  5. Establish the PQ team, which should include representatives from Engineering, Production, and QA teams.

5.2. Conducting the Performance Qualification

  1. Perform the following tests as part of the PQ process:
    • Crimping Consistency: Verify that the crimping machine produces consistent and reliable crimp seals across multiple batches. The test should involve crimping a set number of cans (at least 20) and measuring the consistency of the seal strength and appearance.
    • Sealing Quality: Test the quality of the crimp seal by performing a leak test, ensuring that the crimp is intact and airtight. This test should be performed on several cans, using appropriate methods such as submersion in water or pressure decay tests.
    • Cycle Time: Measure the time required for the crimping machine to complete one cycle, including the time taken to position the aerosol cans, apply the crimp, and remove the finished cans. The cycle time should be within the specified limits for production speed.
    • Machine Performance Under Normal Operating Conditions: Run the crimping machine under normal production conditions for a set period (e.g., 4 hours) to assess the machine’s ability to perform without issues or failures. Monitor for any mechanical failures, downtime, or irregularities in performance.
  2. During testing, ensure that all relevant machine settings (e.g., pressure, speed, temperature) are within the specified operating range and meet the manufacturer’s recommendations.
  3. Record all test results, including the number of successful crimping cycles, any deviations or failures, and the corrective actions taken. Document the performance data in the Performance Qualification Report (Annexure-1).

5.3. Documenting the Performance Qualification

  1. Document the following information in the Performance Qualification Report (Annexure-1):
    • Details of the crimping machine, including the equipment ID, model, serial number, and location
    • The performance specifications for the crimping machine, as well as the operational parameters tested (e.g., crimping consistency, sealing quality, cycle time)
    • The results of each test, including the number of successful tests, any deviations or failures, and the corrective actions taken
    • Signatures of the personnel performing the tests, along with the date and time of testing
  2. The Performance Qualification Report should be signed by the responsible team members and reviewed by the QA team.

5.4. Reviewing and Approving the Performance Qualification

  1. The QA team should review the Performance Qualification Report to ensure that the crimping machine meets the required performance specifications and is capable of reliably producing quality aerosol products.
  2. If any deviations are observed during the PQ process, they should be documented in the Deviation Log (Annexure-2). Corrective actions should be taken, and the tests should be repeated to verify the effectiveness of the corrective actions.
  3. The QA team should approve the report once all tests are complete and any deviations have been addressed.

5.5. Finalizing the PQ Process

  1. Once the Performance Qualification is completed and approved, the crimping machine can be used for regular production.
  2. All documentation, including the Performance Qualification Report and any supporting documents (e.g., deviation reports, corrective actions), should be archived and accessible for future audits and reviews.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • PQ: Performance Qualification

7. Documents

  1. Performance Qualification Report (Annexure-1)
  2. Deviation Log (Annexure-2)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • International Council for Harmonisation (ICH) Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Performance Qualification Report

Equipment ID Model Number Serial Number Test Date Test Type Result
CRIMP-001 Model X SN123456 06/02/2025 Crimping Consistency Pass
CRIMP-001 Model X SN123456 06/02/2025 Sealing Quality Pass

Annexure-2: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Crimping accuracy out of tolerance Adjusted crimp pressure Rajesh Patel Completed

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated performance testing procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
]]>