SOP Guide for Pharma

Tablets: SOP for Storage and Handling of Rejected Materials – V 2.0

Tablets: SOP for Storage and Handling of Rejected Materials – V 2.0

Standard Operating Procedure for Storage and Handling of Rejected Materials

Department Tablet
SOP No. SOP/TAB/219/2025
Supersedes SOP/TAB/219/2022
Page No. Page 1 of 5
Issue Date 01/03/2026
Effective Date 06/03/2026
Review Date 01/03/2027

1. Purpose

This SOP defines the procedures for the proper storage and handling of rejected materials during tablet manufacturing. Its goal is to ensure rejected materials are clearly segregated, handled safely, and disposed of according to regulatory requirements to maintain product quality and safety.

2. Scope

This SOP applies to all rejected materials in tablet manufacturing, including raw materials, intermediates, and finished products that do not meet specifications or quality standards.

3. Responsibilities

4. Accountability

The QA Manager is accountable for ensuring that all rejected materials are handled, stored, and disposed of properly according to this SOP. The Production, QC, and Warehouse teams are responsible for following this procedure in their respective areas.

5. Procedure

5.1 Identification of Rejected Materials

  1. Identify rejected materials through inspection, testing, or by feedback from the manufacturing process (e.g., failed dissolution, incorrect labeling, damaged packaging).
  2. Upon identification, immediately label the rejected materials as “Rejected” to avoid confusion with conforming products.
  3. Document the batch number, product name, type of rejection, and any relevant details (e.g., reason for rejection) in the Non-Conformance Report (Annexure-1).

5.2 Segregation of Rejected Materials

  1. Segregate rejected materials from conforming products immediately to prevent any accidental mix-up.
  2. Store rejected materials in a designated quarantine area that is clearly marked as “Rejected Materials.”
  3. Ensure that the storage area is secure, with restricted access to authorized personnel only.

5.3 Handling and Transport of Rejected Materials

  1. Handle rejected materials with care to prevent contamination or damage. Use appropriate protective equipment (e.g., gloves, masks, etc.) as necessary.
  2. If rejected materials need to be transported for further testing, reprocessing, or disposal, ensure they are securely sealed and properly labeled during transit.
  3. Ensure that rejected materials are handled in a manner that complies with safety and environmental standards.

5.4 Disposal of Rejected Materials

  1. If rejected materials cannot be reprocessed, reworked, or reused, dispose of them following company’s waste disposal procedures (Annexure-2).
  2. Ensure that rejected materials are disposed of in an environmentally responsible manner and in accordance with applicable laws and regulations.
  3. Document all disposal activities, including the quantity, batch numbers, and disposal method used (Annexure-3).

5.5 Record Keeping and Documentation

  1. Maintain detailed records of all rejected materials, including the reason for rejection, the actions taken, and the final disposition (Annexure-4).
  2. Store all rejection and disposal documentation for a minimum of 5 years, or as required by applicable regulations, in a secure location.

5.6 Review and Analysis

  1. Review records of rejected materials periodically to identify any trends or recurring issues that may indicate a need for corrective or preventive actions.
  2. Analyze the root causes of frequent rejections and implement corrective actions as necessary (Annexure-5).

6. Abbreviations

7. Documents

  1. Non-Conformance Report (Annexure-1)
  2. Rejected Materials Disposal Record (Annexure-2)
  3. Rejected Materials Documentation (Annexure-3)
  4. Rejection and Handling Records (Annexure-4)
  5. Root Cause Analysis for Rejected Materials (Annexure-5)

8. References

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Non-Conformance Report

Non-Conformance ID Description Batch Number Action Taken
NC001 Tablet weight out of specification Batch123 Rework and retest

Annexure-2: Rejected Materials Disposal Record

Batch Number Reason for Rejection Disposal Method Disposal Date
Batch123 Out-of-specification weight Incineration 06/03/2026

Annexure-3: Rejected Materials Documentation

Material Batch Number Reason for Rejection Action Taken
Tablet ABC Batch123 Out-of-specification dissolution rate Material segregated and sent for disposal

Annexure-4: Rejection and Handling Records

Batch Number Rejection Date Handled By Final Disposition
Batch123 05/03/2026 John Doe Disposed of

Annexure-5: Root Cause Analysis for Rejected Materials

Issue Root Cause Corrective Action
Tablet weight out of specification Incorrect calibration of tablet press Recalibrate tablet press and perform regular checks

Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By
01/01/2024 1.0 Initial SOP creation New procedure QA Head
01/02/2025 2.0 Updated handling and disposal procedures Annual review QA Head
Exit mobile version