Standard Operating Procedure for QA Involvement in Tablet Packaging Line Validation

Department Tablet
SOP No. SOP/TAB/225/2025
Supersedes SOP/TAB/225/2022
Page No. Page 1 of 5
Issue Date 01/03/2026
Effective Date 06/03/2026
Review Date 01/03/2027

1. Purpose

The purpose of this SOP is to outline the steps for ensuring Quality Assurance (QA) involvement in the validation of tablet packaging lines. This SOP ensures that the packaging lines are validated to meet the required standards for product integrity, regulatory compliance, and operational efficiency.

2. Scope

This SOP applies to the validation of all tablet packaging lines, including equipment used for blister packing, strip packing, cartoning, and labeling. It covers the entire validation process, from initial setup to final approval.

3. Responsibilities

4. Accountability

The QA Manager is accountable for ensuring that all QA-related aspects of packaging line validation are followed. The Production and Engineering teams are responsible for executing the validation steps and providing documentation of results.

5. Procedure

5.1 Pre-Validation Preparation

  1. Review the packaging line layout, including all relevant equipment (e.g., blister machines, cartoners, labeling machines) and packaging materials (Annexure-1).
  2. Ensure that all necessary equipment and systems are in place and calibrated according to manufacturer specifications.
  3. Ensure that standard operating procedures (SOPs) for each piece of equipment are available and up-to-date (Annexure-2).
  4. Ensure that the validation team is trained and all required documentation is ready for review (Annexure-3).

5.2 Packaging Line Setup and Installation

  1. Verify that the packaging line setup follows the manufacturer’s installation guidelines and meets all specifications (Annexure-4).
  2. Check all utilities (electricity, compressed air, etc.) to ensure proper functioning and safety of the equipment.
  3. Verify that the line layout is appropriate for efficient production flow and that equipment is accessible for routine maintenance (Annexure-5).
  4. Ensure that all line-specific documentation (e.g., installation records, calibration certificates) is completed (Annexure-6).

5.3 Operational Qualification (OQ)

  1. Verify that the packaging line operates as per the defined parameters, including speed, throughput, labeling accuracy, and sealing integrity (Annexure-7).
  2. Test all packaging line functions to ensure they meet predefined operational limits (e.g., weight variation, blister integrity, print accuracy) (Annexure-8).
  3. Document all test results, deviations, and corrective actions taken (Annexure-9).

5.4 Performance Qualification (PQ)

  1. Verify the consistency of packaging performance under typical operating conditions over an extended run (e.g., 3-5 consecutive batches) (Annexure-10).
  2. Monitor key performance indicators, such as batch-to-batch consistency, packaging material waste, and downtime (Annexure-11).
  3. Ensure that the packaging line can consistently produce products that meet the required quality standards (e.g., packaging appearance, correct labeling, and integrity of seals) (Annexure-12).

5.5 Documentation and Record Keeping

  1. Ensure that all packaging line qualification records, including IQ, OQ, and PQ documents, are complete, signed, and filed (Annexure-13).
  2. Ensure that all deviations are documented with corrective actions taken and that these records are maintained according to GMP requirements (Annexure-14).
  3. Store all documentation for a minimum of 5 years or as required by applicable regulations.

5.6 Approval and Final Review

  1. Once all validation steps are complete, the QA Manager shall review the qualification documentation for completeness and compliance (Annexure-15).
  2. Upon approval, the final report shall be signed off by the QA Manager and the Production Manager (Annexure-16).
  3. Any outstanding issues or deviations must be resolved before the final approval can be granted.

5.7 Requalification and Ongoing Monitoring

  1. Requalification of the packaging line must be performed after any major modifications or upgrades to the equipment or processes (Annexure-17).
  2. Monitor packaging line performance regularly to ensure continued compliance with specifications and quality standards (Annexure-18).
  3. Document any requalification activities, adjustments, or improvements made during routine operations (Annexure-19).

6. Abbreviations

7. Documents

  1. Packaging Line Qualification Report (Annexure-1)
  2. Equipment SOPs (Annexure-2)
  3. Qualification Documentation Checklist (Annexure-3)
  4. Installation Qualification Checklist (Annexure-4)
  5. Operational Qualification Test Plan (Annexure-5)
  6. Operational Qualification Results (Annexure-6)
  7. Performance Qualification Plan (Annexure-7)
  8. Performance Qualification Results (Annexure-8)
  9. Documentation of Deviations (Annexure-9)
  10. Performance Monitoring Log (Annexure-10)
  11. Requalification Documentation Log (Annexure-11)
  12. Packaging Line Requalification Results (Annexure-12)
  13. Final Qualification Approval Log (Annexure-13)

8. References

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Packaging Line Qualification Report

Equipment Model Serial Number Manufacturer Qualification Date
Blister Packaging Machine Model X 12345 XYZ Pharma 01/03/2026

Annexure-2: Equipment SOPs

Equipment SOP Number Version Reviewed By Review Date
Blister Machine SOP/TAB/101 2.0 John Smith 01/03/2026

Annexure-3: Qualification Documentation Checklist

Document Type Complete Remarks
Qualification Report Yes Complete and reviewed

Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By
01/01/2024 1.0 Initial SOP creation New process QA Head
01/02/2025 2.0 Added requalification and ongoing monitoring procedures Process improvement QA Head
Exit mobile version