Standard Operating Procedure for Investigating Tablet Coating Defects
Department | Tablet |
---|---|
SOP No. | SOP/TAB/211/2025 |
Supersedes | SOP/TAB/211/2022 |
Page No. | Page 1 of 6 |
Issue Date | 01/03/2026 |
Effective Date | 06/03/2026 |
Review Date | 01/03/2027 |
1. Purpose
This SOP defines the process for investigating coating defects in tablet production. The objective is to identify the root cause of coating defects, ensure the corrective actions are implemented, and maintain tablet quality in compliance with GMP standards.
2. Scope
This SOP applies to the investigation of all coating defects observed during the tablet coating process, including defects such as uneven coating, chipping, cracking, or other visible defects in the finished product.
3. Responsibilities
- Quality Assurance (QA) Manager: Responsible for overseeing the investigation of coating defects and ensuring that corrective actions are implemented in compliance with regulatory standards.
- Production Team: Responsible for notifying QA of any coating defects, participating in the investigation, and implementing corrective measures as required.
- Coating Team: Responsible for identifying potential causes of defects during the coating process and assisting in the investigation.
- Regulatory Affairs Team: Ensures that the investigation process meets FDA and GMP compliance standards.
4. Accountability
The QA Manager is accountable for the investigation of coating defects and ensuring that corrective actions are taken. The Production and Coating Teams are responsible for identifying issues and supporting the investigation process.
5. Procedure
5.1 Identification of Coating Defects
- Inspect the coated tablets visually for defects such as uneven coating, discoloration, chips, cracks, or poor adhesion.
- Document the type and frequency of defects and identify the batch numbers and production dates associated with the defects (Annexure-1).
- Notify the QA team immediately upon identifying any coating defects.
5.2 Investigation of Defects
- The QA team will initiate an investigation into the identified coating defects.
- Examine the coating process for possible causes of defects, including:
- Improper coating equipment settings (e.g., spray rate, air flow, pan speed).
- Incorrect coating material formulation (e.g., incorrect binder or solvent concentration).
- Environmental conditions (e.g., humidity, temperature) during coating.
- Possible contamination of raw materials used in the coating process.
- Review the process parameters during the coating run, including equipment calibration, operator logs, and environmental conditions (Annexure-2).
5.3 Root Cause Analysis
- Once the potential causes are identified, perform a root cause analysis to determine the exact cause of the defects (Annexure-3).
- Involve the Coating Team, Production Team, and Quality Control to help identify any procedural, equipment, or material-related causes.
- If necessary, use tools such as fishbone diagrams or failure mode analysis to guide the investigation.
5.4 Corrective Actions
- Once the root cause has been identified, implement corrective actions to address the issue and prevent recurrence.
- Corrective actions may include:
- Adjusting equipment settings.
- Modifying coating formulations.
- Improving environmental control during the coating process.
- Re-training operators on proper coating procedures.
- Ensure that all corrective actions are documented and signed off by the QA Manager (Annexure-4).
5.5 Re-Testing and Validation
- After corrective actions have been implemented, perform re-testing of the coating process using new batches to ensure that the defects have been resolved.
- Validate the new coating process to ensure it meets product specifications (Annexure-5).
- Document the results of the re-testing and validation, ensuring that all findings are recorded and signed off by the QA team.
5.6 Documentation and Record Keeping
- Maintain detailed records of the defect investigation, including all steps taken, findings, corrective actions, and validation results (Annexure-6).
- Store all records securely for future reference and regulatory inspection purposes.
6. Abbreviations
- SOP: Standard Operating Procedure
- QA: Quality Assurance
- QC: Quality Control
- GMP: Good Manufacturing Practice
7. Documents
- Coating Defect Log (Annexure-1)
- Coating Process Parameters Review (Annexure-2)
- Root Cause Analysis Report (Annexure-3)
- Corrective Action Plan (Annexure-4)
- Coating Process Validation Report (Annexure-5)
- Coating Defect Investigation Report (Annexure-6)
8. References
- 21 CFR Part 211 – Current Good Manufacturing Practice for Finished Pharmaceuticals (US FDA)
- USP <1161> – Tablet Coating
- ISO 9001 – Quality Management Systems
9. SOP Version
Version: 2.0
10. Approval Section
Prepared By | Checked By | Approved By | |
---|---|---|---|
Signature | |||
Date | |||
Name | |||
Designation | |||
Department |
11. Annexures
Annexure-1: Coating Defect Log
Batch Number | Defect Type | Frequency | Reported By |
---|---|---|---|
Batch-12345 | Uneven Coating | 5 units | John Doe |
Annexure-2: Coating Process Parameters Review
Parameter | Value | Acceptable Range | Action Taken |
---|---|---|---|
Spray Rate | 100 mL/min | 80-120 mL/min | Adjusted to 110 mL/min |
Annexure-3: Root Cause Analysis Report
Root Cause | Impact | Corrective Action |
---|---|---|
Incorrect Spray Nozzle Setting | Uneven coating on tablets | Adjusted nozzle settings to optimal range |
Annexure-4: Corrective Action Plan
Action ID | Action Description | Responsible Person | Completion Date |
---|---|---|---|
CAP-001 | Recalibrate spray nozzle | John Doe | 05/03/2026 |
Annexure-5: Coating Process Validation Report
Batch Number | Validation Status | Test Results |
---|---|---|
Batch-12345 | Passed | Coating uniformity within specifications |
Annexure-6: Coating Defect Investigation Report
Defect Type | Investigation Outcome | Corrective Actions |
---|---|---|
Chipping | Incorrect tablet compression force | Adjusted compression settings |
Revision History:
Revision Date | Revision No. | Revision Details | Reason for Revision | Approved By |
---|---|---|---|---|
01/01/2024 | 1.0 | Initial Version | New SOP Creation | QA Head |
01/02/2025 | 2.0 | Updated investigation process | Clarified actions for coating defects | QA Head |