Skip to content
  • Clinical Studies
  • Pharma GMP
  • Pharma Tips
  • Stability Studies
  • Pharma Books
  • Schedule M

SOP Guide for Pharma

The Ultimate Resource for Pharmaceutical SOPs and Best Practices

  • Home
  • Job Safety Analysis (JSA)
    • Oral Dosage Forms (Tablets & Capsules)
    • Oral Liquid Dosage Forms (Syrups, Elixirs, Suspensions, Emulsions)
    • Powder and Granule Dosage Forms
    • Topical Dosage Forms (Creams, Ointments, Gels, Lotions, Pastes)
    • Transdermal Dosage Forms (Patches)
  • Standard Test Procedures (STP)
  • SOP – Blog Post
  • Toggle search form

Tablets: SOP for Compression Tooling Inspection and Cleaning – V 2.0

Posted on By

Tablets: SOP for Compression Tooling Inspection and Cleaning – V 2.0

Standard Operating Procedure for Compression Tooling Inspection and Cleaning

Department Tablet
SOP No. SOP/TAB/027/2025
Supersedes SOP/TAB/027/2022
Page No. Page 1 of 7
Issue Date 23/06/2025
Effective Date 28/06/2025
Review Date 23/06/2026

1. Purpose

This SOP outlines the procedure for the inspection and cleaning of compression tooling used in tablet manufacturing. Ensuring the proper condition of tooling is crucial to maintain tablet quality, prevent defects, and avoid cross-contamination.

2. Scope

This SOP applies to all compression tooling (dies, punches, etc.) used in the tablet compression process. It covers both routine inspection and cleaning procedures, including when the tooling needs to be inspected and cleaned after each batch or at specific intervals.

3. Responsibilities

  • Manufacturing Personnel: Responsible for inspecting the tooling before and after each use, performing routine maintenance, and ensuring the cleanliness of the tooling.
  • Quality Control (QC): Ensures that the inspected tooling meets the required standards and verifies that all cleaning and maintenance activities have been performed according to SOPs.
  • Quality Assurance (QA): Reviews and approves the inspection and cleaning records to ensure compliance with this SOP and regulatory requirements.

4. Accountability

The Production Manager is accountable for ensuring that all

compression tooling is properly inspected and cleaned as per this SOP. The QA Manager is responsible for reviewing the documentation and ensuring compliance with regulatory standards.

5. Procedure

5.1 Pre-Inspection and Pre-Cleaning Preparation

  1. Ensure that the compression machine is powered off and the tooling is removed safely according to the machine’s shut-down procedures.
  2. Wear appropriate personal protective equipment (PPE) such as gloves and safety glasses before handling the tooling.
  3. Ensure that the inspection and cleaning areas are clean and well-organized, with all necessary tools and cleaning agents readily available.
  4. Check the batch records for any tooling-related issues reported during the previous batch to address any specific concerns during the inspection.
See also  Tablets: SOP for Material Reconciliation During Tablet Manufacturing - V 2.0

5.2 Compression Tooling Inspection

  1. Inspect each die and punch for any visible signs of wear, damage, or contamination.
  2. Check for any chips, cracks, or dullness on the surface of the tooling, which could affect tablet formation.
  3. Ensure that the tooling is free from any product residues or contamination from previous batches. Inspect the tooling for any powder buildup or oils.
  4. Verify that the tooling is properly aligned and that all components fit securely without any looseness or misalignment.
  5. If any defects or damage are found, remove the tooling from service and report the issue to the Maintenance Supervisor for repairs or replacement.

5.3 Compression Tooling Cleaning

  1. Remove any loose product residues from the tooling using an appropriate brush or air gun. Ensure that no debris is left on the surfaces.
  2. Clean the tooling using an approved cleaning solution or solvent that is compatible with the material of the tooling. Ensure the cleaning agent effectively removes product residues and prevents corrosion.
  3. For stubborn residues, use a soft abrasive pad or cloth to gently scrub the surface of the tooling without causing damage.
  4. Rinse the tooling thoroughly to remove any cleaning solution or solvent. Ensure that no residue from the cleaning agent remains on the tooling surface.
  5. Dry the tooling completely using a clean, lint-free cloth or allow it to air dry in a clean environment.
  6. After cleaning, inspect the tooling again to ensure that all residues have been removed and that no damage has occurred during cleaning.
See also  Tablets: SOP for Storage of Intermediate Products in Tablet Manufacturing - V 2.0

5.4 Lubrication and Reassembly

  1. If necessary, apply a thin layer of approved lubricant to the tooling to prevent sticking and reduce wear during the next compression cycle. Ensure that only a small amount of lubricant is used to avoid contamination of the tablet product.
  2. Reassemble the cleaned and lubricated tooling, ensuring that all components are securely fitted and properly aligned according to the manufacturer’s specifications.
  3. Ensure that all tools used in the cleaning and lubrication process are also cleaned and stored properly after use to prevent contamination.

5.5 Post-Cleaning Inspection

  1. Conduct a final inspection of the cleaned and reassembled tooling to verify that it is free from defects, contamination, and residues.
  2. Ensure that the tooling is properly labeled with a “cleaned and ready for use” tag to indicate it is ready for the next production run.
  3. Document all inspection and cleaning activities, including any defects or corrective actions taken, in the batch record (Annexure-1).

5.6 Documentation and Record-Keeping

  1. Ensure that all inspection and cleaning activities are properly documented in the tooling inspection log (Annexure-2), including the date of inspection, findings, and any corrective actions taken.
  2. Ensure that the batch record includes all relevant tooling inspection and cleaning information, as well as any deviations or issues encountered.
  3. Review and approve the completed records to ensure compliance with this SOP and regulatory standards.
  4. Store the inspection and cleaning records for future reference and regulatory compliance audits.

5.7 Equipment Shutdown and Maintenance

  1. After completing the inspection and cleaning process, shut down the equipment according to the SOP for machine shutdown.
  2. Perform routine maintenance checks on the compression machine and tooling storage areas to ensure that they are properly maintained and free of contamination.
  3. Document any maintenance performed on the equipment and tooling in the maintenance log (Annexure-3).
See also  Tablets: SOP for UV-Vis Spectroscopy for Dissolution Analysis - V 2.0

6. Abbreviations

  • SOP: Standard Operating Procedure
  • GMP: Good Manufacturing Practice
  • QC: Quality Control
  • QA: Quality Assurance
  • API: Active Pharmaceutical Ingredient

7. Documents

  1. Batch Record (Annexure-1)
  2. Tooling Inspection Log (Annexure-2)
  3. Equipment Maintenance Log (Annexure-3)

8. References

  • 21 CFR Part 211 – Current Good Manufacturing Practice for Finished Pharmaceuticals (US FDA)
  • EU GMP Guidelines Part I – Basic Requirements for Medicinal Products
  • ICH Q7 – Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Batch Record

Batch Number Tablet Type Tooling Condition Cleaning Date Remarks
Batch 001 Tablet A Good 01/06/2025 Inspection and cleaning completed
Batch 002 Tablet B Minor Wear 02/06/2025 Replaced damaged punch

Annexure-2: Tooling Inspection Log

Inspection Date Tooling Type Condition Corrective Action Taken Remarks
01/06/2025 Die Good None Ready for use
02/06/2025 Punch Minor Wear Replaced Replaced punch before use

Annexure-3: Equipment Maintenance Log

Maintenance Date Equipment Maintenance Type Performed By Remarks
01/06/2025 Compression Machine Routine Maintenance John Doe No issues found
15/06/2025 Compression Machine Tooling Replacement Jane Smith Punch replaced due to wear

Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By
01/01/2024 1.0 Initial Version New SOP Creation QA Head
01/02/2025 2.0 Updated Tooling Inspection Guidelines Tooling Wear Monitoring QA Head
Tablet Manufacturing V2.0 Tags:GMP tablet manufacturing SOP, SOP for tablet production, SOP for tablet quality control, SOP tablet inspection process, SOP tablet packing and sealing, Tablet batch record review, Tablet blending SOP, Tablet cleaning and maintenance, Tablet coating procedure, Tablet compression SOP, Tablet disintegration test procedure, Tablet dissolution procedure, Tablet formulation SOP, Tablet friability testing SOP, Tablet labeling and packaging SOP, Tablet manufacturing equipment SOP, Tablet manufacturing SOP, Tablet manufacturing SOPs, Tablet packaging SOP, Tablet production procedure, Tablet quality assurance SOP, Tablet quality control SOP, Tablet sampling and in-process testing SOP, Tablet stability testing SOP, Tablet storage and handling procedure, Tablet uniformity testing procedure, Tablet weight variation SOP

Post navigation

Previous Post: SOP for Using Emergency Spill Kits
Next Post: SOP for Testing and Maintenance of Emergency Alarms

Standard Operating Procedures V 1.0

  • Aerosols
  • Analytical Method Development
  • Bioequivalence Bioavailability Study
  • Capsule Formulation
  • Clinical Studies
  • Creams
  • Data Integrity
  • Dental Dosage Forms
  • Drug Discovery
  • Environment, Health and Safety
  • Formulation Development
  • Gels
  • Good Distribution Practice
  • Good Warehousing Practices
  • In-Process Control
  • Injectables
  • Liquid Orals
  • Liposome and Emulsion Formulations
  • Lotions
  • Lyophilized Products
  • Maintenance Dept.
  • Medical Devices
  • Metered-Dose Inhaler
  • Microbiology Testing
  • Nanoparticle Formulation
  • Nasal Spray Formulations
  • Nebulizers
  • Ocular (Eye) Dosage Forms
  • Ointments
  • Otic (Ear) Dosage Forms
  • Pharmacovigilance
  • Powder & Granules
  • Purchase Departments
  • Quality Assurance
  • Quality Control
  • Raw Material Stores
  • Regulatory Affairs
  • Tablet Manufacturing
  • Rectal Dosage Forms
  • Transdermal Patches
  • Vaginal Dosage Forms
  • Validations and Qualifications

Read SOPs in your Language:

 - 
Bengali
 - 
bn
English
 - 
en
Gujarati
 - 
gu
Hindi
 - 
hi
Malayalam
 - 
ml
Marathi
 - 
mr
Punjabi
 - 
pa
Tamil
 - 
ta
Telugu
 - 
te

NEW! Revised SOPs – V 2.0

  • Aerosols V 2.0
  • Analytical Method Development V 2.0
  • API Manufacturing V 2.0
  • BA-BE Studies V 2.0
  • Biosimilars V 2.0
  • Capsules V 2.0
  • Creams V 2.0
  • Elixers V 2.0
  • Ointments V 2.0
  • Raw Material Warehouse V 2.0
  • Tablet Manufacturing V2.0

New Publication: A must for All.

Copyright © 2025 SOP Guide for Pharma.

Powered by PressBook WordPress theme

Go to mobile version