SOP applies to all portable water systems, including storage tanks, pipelines, distribution loops, and points-of-use outlets used within the facility for sterile injectable production.
3. Responsibilities
- Utility Operator: Execute the sanitization process as per schedule.
- Engineering Department: Maintain sanitization records and ensure availability of sanitization chemicals.
- QA Department: Verify post-sanitization results and release the system for use.
- Microbiology Team: Conduct and evaluate microbial sampling post-sanitization.
4. Accountability
The Head of Engineering is accountable for ensuring compliance with this SOP and that sanitization activities are conducted as per the approved schedule.
5. Procedure
5.1 Preparation
- Review the preventive maintenance and sanitization schedule.
- Ensure availability of sanitizing agent (e.g., hot water or 1% peracetic acid solution).
- Check all instrumentation—temperature gauges, valves, and pressure sensors—for correct function.
- Inform QA department before starting the sanitization process.
5.2 Sanitization Process – Thermal
- Set the system to thermal sanitization mode if equipped.
- Heat the water in the storage tank to 80–85°C.
- Recirculate hot water through the complete loop for 60 minutes minimum.
- Ensure the outlet points reach at least 80°C using calibrated thermometers.
- Maintain circulation for the required duration and monitor temperature trends continuously.
- After completion, flush the system with pre-filtered cold water until temperature stabilizes below 30°C.
5.3 Sanitization Process – Chemical
- If thermal sanitization is not possible, proceed with chemical sanitization.
- Prepare a 1% peracetic acid solution or other validated disinfectant in the sanitization tank.
- Recirculate the solution through the system loop for a minimum of 45 minutes.
- Monitor conductivity and pH throughout the process.
- Post-sanitization, flush the system with purified water until no traces of disinfectant are detected (check pH ~6–7).
5.4 Post-Sanitization Activities
- Collect water samples from at least five representative points including the return loop.
- Send samples to microbiology for analysis of:
- Total microbial count
- Endotoxins (if applicable)
- Conductivity and TOC (if required)
- QA shall review analytical reports and provide clearance before restarting water usage.
5.5 Documentation
- Record all parameters including sanitization start and end times, temperatures, flow rates, and chemical concentrations.
- Fill the Sanitization Log Sheet (Annexure-1) and attach microbiological test reports.
- Update Preventive Maintenance Calendar with sanitization date and initials of responsible technician.
5.6 Frequency
- Thermal sanitization: Weekly
- Chemical sanitization: Monthly or as backup if thermal fails
- Immediate sanitization: After planned or unplanned shutdown exceeding 48 hours
5.7 Deviation Handling
- If sanitization fails or microbial load is above limit:
- Repeat the sanitization process immediately.
- Document deviation and inform QA.
- Investigate root cause and implement CAPA.
6. Abbreviations
- SOP: Standard Operating Procedure
- QA: Quality Assurance
- TOC: Total Organic Carbon
- CAPA: Corrective and Preventive Action
7. Documents
- Sanitization Log Sheet – Annexure-1
- Microbial Analysis Report – Annexure-2
- Preventive Maintenance Calendar – Annexure-3
8. References
- WHO Technical Report Series 970
- EU GMP Annex 1 – Clean Water Systems
- ICH Q9 – Quality Risk Management
9. SOP Version
Version: 2.0
10. Approval Section
|
Prepared By |
Checked By |
Approved By |
| Signature |
|
|
|
| Date |
|
|
|
| Name |
|
|
|
| Designation |
Manufacturing Executive |
QA Executive |
Head QA |
| Department |
Production |
Quality Assurance |
Quality Assurance |
11. Annexures
Annexure-1: Sanitization Log Sheet
| Date |
System ID |
Method |
Start Time |
End Time |
Performed By |
| 23/06/2025 |
PWS-01 |
Thermal |
06:00 AM |
07:15 AM |
Ravi Sharma |
Annexure-2: Microbial Analysis Report
| Date |
Sample Point |
Total Count (cfu/mL) |
Result |
Analyst |
| 23/06/2025 |
Return Loop |
<10 |
Pass |
Sunita Reddy |
Annexure-3: Preventive Maintenance Calendar
| Month |
Planned Date |
Activity |
Status |
Technician |
| June 2025 |
23/06/2025 |
Thermal Sanitization |
Completed |
Ravi Sharma |
Revision History:
| Revision Date |
Revision No. |
Details |
Reason |
Approved By |
| 01/04/2022 |
1.0 |
Initial version |
New SOP |
QA Head |
| 24/06/2025 |
2.0 |
Added chemical sanitization protocol and updated annexures |
Annual Review |
QA Head |