Skip to content
  • Clinical Studies
  • Schedule M
  • Stability Studies
  • Pharma GMP
  • Pharma Tips
  • Pharma Books
  • Pharma Validation
  • Pharma Regulatory

SOP Guide for Pharma

The Ultimate Resource for Pharmaceutical SOPs and Best Practices

  • Home
  • SOP Guidelines
    • SOP Development
    • SOP Training
    • SOP Compliance Monitoring
    • SOP Revision Processes
    • Pharmaceutical SOP templates
    • GMP documentation SOP
    • Data integrity SOP pharma
    • Manufacturing SOP pharmaceutical
    • FDA SOP guidance
    • eQMS SOP workflows
  • Job Safety Analysis (JSA)
    • Oral Dosage Forms (Tablets & Capsules)
    • Oral Liquid Dosage Forms (Syrups, Elixirs, Suspensions, Emulsions)
    • Powder and Granule Dosage Forms
    • Topical Dosage Forms (Creams, Ointments, Gels, Lotions, Pastes)
    • Transdermal Dosage Forms (Patches)
  • Standard Test Procedures (STP)
  • GMP Audit Findings
    • Non-Compliance
      • SOP Absence
      • Revision Control
      • Non-Adherence
      • Poor Writing
      • Training Failure
      • Data Integrity Gaps
      • Mismatch Between SOPs and Practice
      • Critical Operations
      • Regulatory Change
      • Emergency Changes
      • Third-Party SOPs
      • Inspection Readiness
      • Deviation Handling
      • CAPA Integration
      • Validation Alignment
      • System Integration
      • Uncontrolled Distribution
      • SOP Implementation Gaps
      • SOP Alignment with Validation
      • Change Control Linkage
  • Toggle search form

Sterile Injectable Manufacturing: SOP for Preventive Maintenance of Injectable Filling Machines – V 2.0

Posted on By

Sterile Injectable Manufacturing: SOP for Preventive Maintenance of Injectable Filling Machines – V 2.0

Standard Operating Procedure for Preventive Maintenance of Injectable Filling Machines


Department Sterile Injectable Manufacturing
SOP No. SOP/SIM/141/2025
Supersedes SOP/SIM/141/2022
Page No. Page 1 of 16
Issue Date 24/06/2025
Effective Date 26/06/2025
Review Date 24/06/2026

1. Purpose

To establish a standardized procedure for performing preventive maintenance of injectable filling machines to ensure optimal performance, reduce unplanned breakdowns, and comply with cGMP and regulatory expectations in sterile manufacturing.

2. Scope

This SOP applies to all

injectable filling machines used in sterile manufacturing lines across the facility. It covers planning, execution, inspection, documentation, and verification of preventive maintenance activities.

3. Responsibilities

  • Maintenance Technician: Carry out maintenance as per the defined schedule and checklist.
  • Engineering Supervisor: Review and approve completed maintenance records. Ensure availability of spares.
  • Production Supervisor: Coordinate equipment shutdown and startup activities.
  • QA Personnel: Verify cleanliness and qualification status before releasing machine for production use.
See also  Sterile Injectable Manufacturing: SOP for Use of CIP (Clean-In-Place) Systems in Injectable Manufacturing - V 2.0

4. Accountability

The Head of Engineering is accountable for ensuring that all injectable filling machines undergo timely preventive maintenance as per the maintenance calendar and are compliant with equipment qualification and GMP requirements.

5. Procedure

5.1 Preventive Maintenance Planning

  1. Prepare an annual preventive maintenance calendar for each filling machine based on manufacturer recommendations, past breakdown trends, and regulatory guidelines.
  2. Display the approved calendar in the maintenance department and send a copy to Production and QA.

5.2 Preparation before Maintenance

  1. Ensure current batch is completed or transferred before initiating maintenance.
  2. Verify the machine is decontaminated and cleaned.
  3. Switch off the power supply and lock-out/tag-out the energy sources (LOTO).

5.3 Execution of Maintenance

  1. Perform maintenance using the approved Preventive Maintenance Checklist (Annexure-1).
  2. Activities may include:
    • Lubrication of moving parts
    • Inspection and cleaning of nozzles
    • Replacement of worn-out gaskets, O-rings
    • Calibration of sensors and weighing systems
    • Checking alignment and speed settings
  3. Use only approved tools and calibrated instruments.
See also  Sterile Injectable Manufacturing: SOP for Risk Assessment in Injectable Manufacturing - V 2.0

5.4 Post-Maintenance Verification

  1. Conduct trial run using sterile water or dummy vials.
  2. Check fill accuracy, line speed, and absence of abnormal vibrations.
  3. QA to review trial run results and sign off machine release in the Maintenance Logbook (Annexure-2).

5.5 Documentation

  1. Complete and sign the Preventive Maintenance Checklist.
  2. Record maintenance activity in the Equipment History Sheet.
  3. Scan and archive documents in the Maintenance Document Control System.

5.6 Deviation Handling

  1. If any component replacement or extended downtime occurs, document the deviation and perform impact assessment.
  2. QA must approve equipment requalification if critical components were replaced.

5.7 Training and Review

  1. Maintenance personnel shall undergo training on machine models and revised procedures annually.
  2. Engineering department will review PM compliance quarterly and report trends to QA and management.

6. Abbreviations

  • SOP: Standard Operating Procedure
  • PM: Preventive Maintenance
  • LOTO: Lock Out Tag Out
  • QA: Quality Assurance
  • cGMP: current Good Manufacturing Practices
See also  Manufacturing: SOP for Temperature and Humidity Monitoring during Production - V 2.0

7. Documents

  1. Preventive Maintenance Checklist – Annexure-1
  2. Maintenance Logbook – Annexure-2
  3. Equipment History Sheet – Annexure-3

8. References

  • GMP Guidelines – WHO TRS 986 Annex 2
  • 21 CFR Part 211 – Maintenance of Equipment
  • ISO 9001:2015 – Clause 8.5.1 and 8.5.3

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation Manufacturing Executive QA Executive Head QA
Department Production Quality Assurance Quality Assurance

11. Annexures

Annexure-1: Preventive Maintenance Checklist

Item Check Status Remarks
Lubrication of gears Yes Done OK
Nozzle inspection Yes Done Replaced one

Annexure-2: Maintenance Logbook

Date Machine ID Work Performed Performed By Reviewed By
20/06/2025 FLM-04 Quarterly PM Ravi Menon Sunita Reddy

Annexure-3: Equipment History Sheet

Date Event Details Remarks
01/04/2025 Annual PM All critical parts checked Compliant

Revision History

Revision Date Revision No. Details Reason Approved By
01/05/2022 1.0 Initial SOP release New system QA Head
24/06/2025 2.0 Updated checklist and annexures Periodic review QA Head
Injectables V 2.0 Tags:Aseptic processing SOP, Aseptic technique in sterile manufacturing, Cleanroom SOP for injectables, SOP for ampoule sealing, SOP for autoclave sterilization, SOP for container closure integrity testing, SOP for environmental monitoring in aseptic area, SOP for gowning in cleanroom, SOP for in-process checks in sterile manufacturing, SOP for injectable formulation, SOP for lyophilizer operation, SOP for sterile filtration, SOP for sterilization validation, SOP for vial filling, SOP for visual inspection of injectables, Sterile area cleaning SOP, Sterile filling line SOP, Sterile injectable quality control SOP, Sterile injection SOP, Sterile manufacturing procedure

Post navigation

Previous Post: Biosimilars: SOP for Column Packing and Unpacking – V 2.0
Next Post: Staff Unaware of Recent SOP Changes: A Compliance and Training Risk

Standard Operating Procedures V 1.0

  • Aerosols
  • Analytical Method Development
  • Bioequivalence Bioavailability Study
  • Capsule Formulation
  • Clinical Studies
  • Creams
  • Data Integrity
  • Dental Dosage Forms
  • Drug Discovery
  • Environment, Health and Safety
  • Formulation Development
  • Gels
  • Good Distribution Practice
  • Good Warehousing Practices
  • In-Process Control
  • Injectables
  • Liquid Orals
  • Liposome and Emulsion Formulations
  • Lotions
  • Lyophilized Products
  • Maintenance Dept.
  • Medical Devices
  • Metered-Dose Inhaler
  • Microbiology Testing
  • Nanoparticle Formulation
  • Nasal Spray Formulations
  • Nebulizers
  • Ocular (Eye) Dosage Forms
  • Ointments
  • Otic (Ear) Dosage Forms
  • Pharmacovigilance
  • Powder & Granules
  • Purchase Departments
  • Quality Assurance
  • Quality Control
  • Raw Material Stores
  • Regulatory Affairs
  • Tablet Manufacturing
  • Rectal Dosage Forms
  • Transdermal Patches
  • Vaginal Dosage Forms
  • Validations and Qualifications

Read SOPs in your Language:

 - 
Bengali
 - 
bn
English
 - 
en
Gujarati
 - 
gu
Hindi
 - 
hi
Malayalam
 - 
ml
Marathi
 - 
mr
Punjabi
 - 
pa
Tamil
 - 
ta
Telugu
 - 
te

NEW! Revised SOPs – V 2.0

  • Aerosols V 2.0
  • Analytical Method Development V 2.0
  • API Manufacturing V 2.0
  • BA-BE Studies V 2.0
  • Biosimilars V 2.0
  • Capsules V 2.0
  • Creams V 2.0
  • Elixers V 2.0
  • Gels V 2.0
  • Injectables V 2.0
  • Ointments V 2.0
  • Raw Material Warehouse V 2.0
  • Tablet Manufacturing V2.0

New Publication: A must for All.

Copyright © 2025 SOP Guide for Pharma.

Powered by PressBook WordPress theme

Go to mobile version