1. Purpose
This SOP defines the systematic procedure for conducting visual and documented inspections of injectable filling lines post-cleaning, ensuring no visible residues, proper sanitization, and readiness for aseptic manufacturing as per cGMP standards.
2. Scope
This procedure applies to all filling lines,
components, and contact surfaces used in the sterile injectable production facility after cleaning and prior to use.
3. Responsibilities
- Filling Line Operator: Performs preliminary inspection and signs cleaning log.
- Production Supervisor: Performs secondary verification.
- Quality Assurance Officer: Conducts final inspection and documents release.
4. Accountability
The Head of Production and Head of QA are jointly accountable for ensuring that post-cleaning inspection is performed and documented for all sterile injectable filling lines.
5. Procedure
5.1 Pre-Inspection Requirements
- Ensure cleaning has been completed as per approved cleaning SOP and logged appropriately.
- All components must be dismantled and accessible for inspection where applicable.
- Cleaning records (Annexure-1) must be available before initiating inspection.
5.2 Visual Inspection
- Use white lint-free cloths, flashlight, and magnifiers where necessary.
- Inspect all equipment surfaces including:
- Filling needles
- Tubing
- Valves and joints
- Hopper and holding tanks
- Vial stoppers and tracks
- Look for:
- Residues or films
- Particulate matter
- Moisture or pooling
- Corrosion or rust spots
5.3 Documentation
- Complete Annexure-2: Post-Cleaning Inspection Checklist.
- Include:
- Inspector’s name and signature
- Date and time of inspection
- Observations made
- Status: Passed/Needs Re-cleaning
5.4 QA Verification
- QA officer to verify checklist entries and perform random checks.
- Approve or reject filling line readiness using Annexure-3: Inspection Release Record.
5.5 Non-Compliance Handling
- If any surface fails visual inspection:
- Mark equipment “NOT READY FOR USE.”
- Initiate re-cleaning and document in Annexure-4: Cleaning Failure Log.
5.6 Final Release
- QA Officer signs Annexure-3 to approve the line for sterile operations.
- Attach all inspection records to batch manufacturing documentation.
6. Abbreviations
- SOP: Standard Operating Procedure
- QA: Quality Assurance
- GMP: Good Manufacturing Practices
- cGMP: Current Good Manufacturing Practices
7. Documents
- Annexure-1: Cleaning Activity Record
- Annexure-2: Post-Cleaning Inspection Checklist
- Annexure-3: Filling Line Inspection Release Record
- Annexure-4: Cleaning Failure Log
8. References
- ICH Q7 Guidelines
- 21 CFR Part 211
- EU GMP Annex 1
9. SOP Version
Version: 2.0
10. Approval Section
|
Prepared By |
Checked By |
Approved By |
| Signature |
|
|
|
| Date |
|
|
|
| Name |
|
|
|
| Designation |
Production Executive |
QA Executive |
Head QA |
| Department |
Production |
Quality Assurance |
Quality Assurance |
11. Annexures
Annexure-1: Cleaning Activity Record
| Date |
Equipment ID |
Cleaned By |
Checked By |
Remarks |
| 22/06/2025 |
FL-02 |
Ajay Mehra |
Anita Reddy |
NA |
Annexure-2: Post-Cleaning Inspection Checklist
| Area |
Condition |
Inspector |
Date |
Status |
| Needles |
Clean |
Sunita Reddy |
22/06/2025 |
Pass |
Annexure-3: Filling Line Inspection Release Record
| Filling Line ID |
Date |
Approved By (QA) |
Status |
| FL-02 |
22/06/2025 |
Vikram Rao |
Approved |
Annexure-4: Cleaning Failure Log
| Date |
Equipment ID |
Issue Noted |
Action Taken |
Verified By |
| 21/06/2025 |
FL-01 |
Visible Residue |
Re-cleaned |
QA |
Revision History:
| Revision Date |
Revision No. |
Details |
Reason |
Approved By |
| 01/01/2022 |
1.0 |
Initial release |
New SOP |
QA Head |
| 24/06/2025 |
2.0 |
Added visual inspection points and QA release documentation |
Annual Review |
QA Head |