SOP Guide for Pharma

Sterile Injectable Manufacturing: SOP for Operation of Autoclaves for Sterilization – V 2.0

Sterile Injectable Manufacturing: SOP for Operation of Autoclaves for Sterilization – V 2.0

Standard Operating Procedure for Operation of Autoclaves for Sterilization


Department Sterile Injectable Manufacturing
SOP No. SOP/SIM/043/2025
Supersedes SOP/SIM/043/2022
Page No. Page 1 of 15
Issue Date 18/06/2025
Effective Date 20/06/2025
Review Date 18/06/2026

1. Purpose

To define the procedure for the operation of autoclaves used for sterilizing materials and equipment in the sterile injectable manufacturing facility. This ensures the maintenance of sterility, product quality, and compliance with GMP standards.

2.

Scope

This SOP applies to all autoclave operations conducted for sterilizing glassware, garments, equipment, and components used in the production of sterile injectable products.

3. Responsibilities

  • Autoclave Operator: Performs pre-checks, loading, cycle execution, unloading, and documentation.
  • Production Supervisor: Ensures readiness of materials and verifies the cycle parameters.
  • QA Officer: Monitors sterilization records and ensures compliance with validated cycles.

4. Accountability

The Head of Production is accountable for ensuring that autoclaves are operated by trained personnel using approved and validated cycles.

5. Procedure

5.1 Pre-Operation Checklist

  1. Ensure autoclave is labeled as “CLEANED” and free from previous load remnants.
  2. Check integrity of door gaskets, chamber walls, and safety valves.
  3. Verify availability of utilities like steam, water, and compressed air.
  4. Record pre-use inspection in Autoclave Pre-Use Checklist (Annexure-1).

5.2 Loading the Autoclave

  1. Wear sterile garments before loading.
  2. Place items to be sterilized (e.g., vials, rubber stoppers, glassware) on perforated trays with proper spacing.
  3. Do not overload or block steam circulation pathways.
  4. Use sterilization indicators (Bowie-Dick or chemical) in each load.

5.3 Cycle Selection and Operation

  1. Select validated sterilization cycle on PLC/HMI panel based on material type.
  2. Typical parameters for porous load: 121°C for 30 minutes at 15 psi.
  3. Start the cycle and monitor the chamber pressure, temperature, and time.
  4. Record cycle start time, load details, and operator ID in the Sterilization Log (Annexure-2).

5.4 Monitoring During Sterilization

  1. Check real-time graph trends on the HMI screen for temperature and pressure consistency.
  2. Ensure no alarms or deviations occur. If triggered, abort and inform QA.

5.5 Unloading Post-Sterilization

  1. Allow chamber pressure to normalize before opening the door.
  2. Verify indicator color change or result to confirm sterilization efficacy.
  3. Unload items using sterile gloves and place them on sterile transfer trolleys.
  4. Complete unloading details in the record.

5.6 Post-Operation Cleaning

  1. Wipe the autoclave interior with 70% IPA.
  2. Drain condensate and log cleaning in Cleaning Record (Annexure-3).

6. Abbreviations

  • SOP: Standard Operating Procedure
  • HMI: Human Machine Interface
  • QA: Quality Assurance
  • IPA: Isopropyl Alcohol
  • PLC: Programmable Logic Controller

7. Documents

  1. Autoclave Pre-Use Checklist – Annexure-1
  2. Sterilization Cycle Log – Annexure-2
  3. Cleaning Record of Autoclave – Annexure-3

8. References

  • EU GMP Annex 1 – Manufacture of Sterile Medicinal Products
  • WHO TRS 961 – Technical Report on Sterile Manufacturing
  • ICH Q9 – Quality Risk Management

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation Manufacturing Executive QA Executive Head QA
Department Production Quality Assurance Quality Assurance

11. Annexures

Annexure-1: Autoclave Pre-Use Checklist

Date Autoclave ID Gasket OK Steam Available Checked By
18/06/2025 ACV-01 Yes Yes Rajesh Kumar

Annexure-2: Sterilization Cycle Log

Batch No. Cycle ID Start Time End Time Operator
STL/INJ/2025/034 ACV-121-30 09:00 10:00 Sunita Reddy

Annexure-3: Cleaning Record of Autoclave

Date Cleaned By Method Used Remarks
18/06/2025 Ajay Verma 70% IPA Wipe Completed

Revision History

Revision Date Revision No. Details Reason Approved By
01/03/2022 1.0 Initial SOP Issue New Process QA Head
18/06/2025 2.0 Updated with validation references and annexures Annual Review QA Head
Exit mobile version