SOP Guide for Pharma

SOP for Proper Use of Storage Bin Systems for Raw Materials – V 2.0

SOP for Proper Use of Storage Bin Systems for Raw Materials – V 2.0

Standard Operating Procedure for Proper Use of Storage Bin Systems for Raw Materials

Department Warehouse / Quality Assurance / Inventory Management
SOP No. SOP/RM/185/2025
Supersedes SOP/RM/185/2022
Page No. Page 1 of 15
Issue Date 20/04/2025
Effective Date 27/04/2025
Review Date 20/04/2026

1. Purpose

This Standard Operating Procedure (SOP) outlines the correct method for using storage bin systems for organizing, storing, and managing raw materials to ensure compliance with Good Manufacturing Practices (GMP) and efficient warehouse operations.

2. Scope

This SOP applies to all warehouse personnel involved in the storage, handling, and organization of raw materials using bin systems. It includes procedures for labeling, tracking, and maintaining bin systems.

3. Responsibilities

4. Accountability

The Warehouse Manager is accountable for the correct use of bin systems, the QA Manager ensures compliance with GMP requirements, and the Inventory Manager oversees the accuracy of bin assignments and stock levels.

5. Procedure

5.1 Bin System Setup and Maintenance

  1. Bin Identification:
    • Assign unique identification codes to each bin, ensuring clear labeling and easy identification.
    • Document bin identification details in the Bin Identification Log (Annexure-1).
  2. Bin Maintenance:
    • Conduct regular cleaning and inspection of bins to prevent contamination and ensure integrity.
    • Record maintenance activities in the Bin Maintenance Log (Annexure-2).

5.2 Material Placement and Tracking

  1. Material Placement:
    • Store raw materials in designated bins according to material classification, ensuring segregation of incompatible materials.
    • Record material placement in the Material Placement Log (Annexure-3).
  2. Material Movement Tracking:
    • Track all movements of materials in and out of bins, ensuring accurate inventory control.
    • Document movements in the Material Movement Log (Annexure-4).

5.3 Labeling and Documentation

  1. Labeling Requirements:
    • Ensure each bin is labeled with material name, batch number, expiry date, and storage conditions.
    • Document labeling details in the Bin Labeling Log (Annexure-5).
  2. Documentation Integrity:
    • Ensure that all entries into the bin management system are accurate and comply with data integrity requirements.
    • Record documentation checks in the Documentation Integrity Log (Annexure-6).

5.4 Safety and Compliance Measures

  1. Segregation of Hazardous Materials:
    • Ensure hazardous materials are stored in designated bins, separate from non-hazardous materials.
    • Document segregation compliance in the Hazardous Material Segregation Log (Annexure-7).
  2. Regular Audits:
    • Conduct periodic audits to verify compliance with bin storage procedures and GMP standards.
    • Record audit findings in the Bin Storage Audit Log (Annexure-8).

5.5 Training and Continuous Improvement

  1. Personnel Training:
    • Conduct regular training for warehouse staff on proper bin usage and material handling procedures.
    • Document training sessions in the Training Log (Annexure-9).

6. Abbreviations

7. Documents

  1. Bin Identification Log (Annexure-1)
  2. Bin Maintenance Log (Annexure-2)
  3. Material Placement Log (Annexure-3)
  4. Material Movement Log (Annexure-4)
  5. Bin Labeling Log (Annexure-5)
  6. Documentation Integrity Log (Annexure-6)
  7. Hazardous Material Segregation Log (Annexure-7)
  8. Bin Storage Audit Log (Annexure-8)
  9. Training Log (Annexure-9)

8. References

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

Annexure-1: Bin Identification Log

Date Bin ID Location Assigned By
20/04/2025 BIN-001 Zone A Ravi Kumar

Annexure-2: Bin Maintenance Log

Date Bin ID Maintenance Activity Performed By
20/04/2025 BIN-001 Cleaned and inspected Neha Verma

Annexure-3: Material Placement Log

Date Material Name Bin ID Placed By
20/04/2025 API X BIN-001 Amit Joshi

Annexure-4: Material Movement Log

Date Material Name From Bin To Bin Moved By
20/04/2025 API Y BIN-002 BIN-003 Kiran Patel

Annexure-5: Bin Labeling Log

Date Bin ID Label Type Labeled By
20/04/2025 BIN-001 Red (Hazardous) QA Supervisor

Annexure-6: Documentation Integrity Log

Date Document Name Checked By Status
20/04/2025 Material Movement Log Sanjay Mehta Verified

Annexure-7: Hazardous Material Segregation Log

Date Material Name Bin ID Verified By
20/04/2025 Solvent Z BIN-005 QA Manager

Annexure-8: Bin Storage Audit Log

Date Audit Area Findings Audited By
20/04/2025 Bin Storage System No discrepancies found QA Head

Annexure-9: Training Log

Date Employee Name Training Topic Trainer Remarks
20/04/2025 Ravi Kumar Proper Use of Bin Systems QA Manager Completed Successfully

Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By
01/01/2024 1.0 Initial Version New SOP Implementation QA Head
20/04/2025 2.0 Updated procedures for bin management and documentation. Regulatory Update QA Head
Exit mobile version