Skip to content
  • Clinical Studies
  • Schedule M
  • Stability Studies
  • Pharma GMP
  • Pharma Tips
  • Pharma Books
  • Pharma Validation
  • Pharma Regulatory

SOP Guide for Pharma

The Ultimate Resource for Pharmaceutical SOPs and Best Practices

  • Home
  • Job Safety Analysis (JSA)
    • Oral Dosage Forms (Tablets & Capsules)
    • Oral Liquid Dosage Forms (Syrups, Elixirs, Suspensions, Emulsions)
    • Powder and Granule Dosage Forms
    • Topical Dosage Forms (Creams, Ointments, Gels, Lotions, Pastes)
    • Transdermal Dosage Forms (Patches)
  • Standard Test Procedures (STP)
  • SOP – Blog Post
  • Toggle search form

SOP for Maintenance of Fume Hoods and Laminar Flow Hoods

Posted on By

SOP for Maintenance of Fume Hoods and Laminar Flow Hoods

Standard Operating Procedure for Maintenance of Fume Hoods and Laminar Flow Hoods

1) Purpose

The purpose of this SOP is to establish the procedures for the routine maintenance of fume hoods and laminar flow hoods to ensure safe and effective containment of hazardous substances in laboratory environments.

2) Scope

This SOP applies to all fume hoods and laminar flow hoods used in pharmaceutical laboratories and research facilities.

3) Responsibilities

The Laboratory Management or Safety Department is responsible for implementing and adhering to this SOP. The Maintenance Team is responsible for executing maintenance activities.

See also  SOP for Maintenance of Chillers

4) Procedure

  1. Maintenance Schedule Planning
    1. Develop a maintenance schedule based on equipment criticality, containment requirements, manufacturer recommendations, and operational history.
    2. Assign specific maintenance tasks to qualified personnel.
    3. Document the schedule and ensure it is communicated to relevant departments.
  2. Preventive Maintenance Tasks
    1. Perform routine inspections of fume hoods and laminar flow hoods according to the schedule.
    2. Check airflow velocity, monitor sash movement, and inspect filters for contamination.
    3. Clean surfaces, including baffles and ductwork, to prevent buildup of hazardous substances.
    4. Test and certify containment performance using appropriate testing equipment.
  3. Corrective Maintenance Procedures
    1. Address any airflow or containment issues promptly.
    2. Diagnose the root cause of issues and determine necessary repairs.
    3. Replace faulty components using approved spare parts and procedures.
    4. Conduct containment performance tests post-repair to verify effectiveness.
  4. Record Keeping
    1. Maintain detailed records of all maintenance activities, including preventive and corrective maintenance tasks.
    2. Document airflow velocity tests, containment performance logs, maintenance logs, and any deviations from standard operating conditions.
    3. Archive records for future reference and regulatory inspections.
See also  SOP for Spare Parts Inventory Management

5) Abbreviations, if any

None

6) Documents, if any

Maintenance Schedules, Containment Performance Logs, Maintenance Records, Equipment Manuals

7) Reference, if any

Relevant regulatory guidelines such as FDA, EMA, and WHO GMP requirements for maintenance of containment systems.

8) SOP Version

Version 1.0

Maintenance Dept. Tags:Balance scale calibration, Cleanroom maintenance SOP, Compressed air system maintenance, Conductivity meter calibration, Corrective maintenance procedures, Electrical system maintenance SOP, Emergency maintenance procedures, Equipment calibration SOP, Fire alarm system maintenance, Flow meter calibration SOP, HPLC GC instrument maintenance, HVAC system maintenance SOP, IQ OQ PQ validation SOP, Laboratory equipment maintenance, Maintenance schedule planning, Measuring instruments calibration, Packaging equipment maintenance, pH meter calibration SOP, Pressure gauge calibration SOP, Preventive maintenance SOP, Production equipment maintenance, Security system maintenance SOP, SOP pharmaceutical industry, SOP template HTML, Spare parts inventory management SOP, Spectrophotometer calibration, Temperature sensor calibration, UPS power backup maintenance, Water system maintenance SOP, Work order management SOP

Post navigation

Previous Post: SOP for Recall Procedure for Gels
Next Post: SOP for Inventory Management

Standard Operating Procedures V 1.0

  • Aerosols
  • Analytical Method Development
  • Bioequivalence Bioavailability Study
  • Capsule Formulation
  • Clinical Studies
  • Creams
  • Data Integrity
  • Dental Dosage Forms
  • Drug Discovery
  • Environment, Health and Safety
  • Formulation Development
  • Gels
  • Good Distribution Practice
  • Good Warehousing Practices
  • In-Process Control
  • Injectables
  • Liquid Orals
  • Liposome and Emulsion Formulations
  • Lotions
  • Lyophilized Products
  • Maintenance Dept.
  • Medical Devices
  • Metered-Dose Inhaler
  • Microbiology Testing
  • Nanoparticle Formulation
  • Nasal Spray Formulations
  • Nebulizers
  • Ocular (Eye) Dosage Forms
  • Ointments
  • Otic (Ear) Dosage Forms
  • Pharmacovigilance
  • Powder & Granules
  • Purchase Departments
  • Quality Assurance
  • Quality Control
  • Raw Material Stores
  • Regulatory Affairs
  • Tablet Manufacturing
  • Rectal Dosage Forms
  • Transdermal Patches
  • Vaginal Dosage Forms
  • Validations and Qualifications

Read SOPs in your Language:

 - 
Bengali
 - 
bn
English
 - 
en
Gujarati
 - 
gu
Hindi
 - 
hi
Malayalam
 - 
ml
Marathi
 - 
mr
Punjabi
 - 
pa
Tamil
 - 
ta
Telugu
 - 
te

NEW! Revised SOPs – V 2.0

  • Aerosols V 2.0
  • Analytical Method Development V 2.0
  • API Manufacturing V 2.0
  • BA-BE Studies V 2.0
  • Biosimilars V 2.0
  • Capsules V 2.0
  • Creams V 2.0
  • Elixers V 2.0
  • Ointments V 2.0
  • Raw Material Warehouse V 2.0
  • Tablet Manufacturing V2.0

New Publication: A must for All.

Copyright © 2025 SOP Guide for Pharma.

Powered by PressBook WordPress theme

Go to mobile version