Procedure for Validation of Electrical Utilities

Department Quality Assurance (QA)/Validation/Engineering/Production
SOP No. SOP/Ointment/145
Supersedes V 1.0
Page No. Page X of Y
Issue Date [Insert Issue Date]
Effective Date [Insert Effective Date]
Review Date [Insert Review Date]

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to define the systematic approach for validating electrical utilities used in pharmaceutical manufacturing. Validation of electrical utilities ensures uninterrupted power supply, stable voltage, and reliable backup systems to support critical production and laboratory operations.

2. Scope

This SOP applies to all personnel in the Quality Assurance (QA), Validation, Engineering, and Production departments responsible for the qualification, validation, and monitoring of electrical utilities.

3. Responsibilities

4. Accountability

The QA and Engineering Managers are accountable for ensuring that electrical utility validation is conducted as per GMP, FDA, ICH, and WHO guidelines.

5. Procedure

5.1 Phases of Electrical Utilities Validation

Validation of electrical utilities consists of three key phases:

5.2 Installation Qualification (IQ)

5.3 Operational Qualification (OQ)

5.4 Performance Qualification (PQ)

5.5 Routine Monitoring and Revalidation

5.6 Handling Deviations

5.7 Documentation and Review

6. Abbreviations

7. Documents

8. References

9. SOP Version

Version 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Electrical Utilities Validation Protocol

Electrical Parameter Validation Phase Test Method Acceptance Criteria
Voltage Stability OQ Voltage Meter ±5% of nominal voltage
Backup Power Response PQ Power Interruption Test Backup activated within 10 sec

Annexure-2: Electrical Utilities Validation Log

Date System ID Validation Phase Test Performed Result Reviewed By
01/02/2025 ELEC-1001 IQ Installation Verification Pass QA Manager
02/02/2025 GEN-2002 PQ Backup Power Test Pass QA Manager