Ointments: SOP for Handling Interruptions During Ointment Manufacturing – V 2.0

SOP for Handling Interruptions During Ointment Manufacturing – V 2.0

Procedure for Handling Interruptions During Ointment Manufacturing

Department Manufacturing/Production/Quality Assurance (QA)/Quality Control (QC)/Engineering
SOP No. SOP/Ointment/199
Supersedes V 1.0
Page No. Page X of Y
Issue Date [Insert Issue Date]
Effective Date [Insert Effective Date]
Review Date [Insert Review Date]

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to define a structured approach for handling interruptions during ointment manufacturing to minimize product loss, maintain compliance with GMP standards, and ensure process integrity.

2. Scope

This SOP applies to manufacturing, production, quality assurance, and engineering personnel responsible for managing and documenting interruptions in ointment manufacturing.

3. Responsibilities

  • Production Supervisor: Identifies and documents manufacturing interruptions.
  • Process Operator: Ensures proper corrective actions are taken as per SOP.
  • QA Officer: Assesses potential impact of interruptions on product quality.
  • QC Analyst: Conducts necessary testing post-interruption.
  • Engineering Team: Troubleshoots and resolves equipment or utility failures.

4. Accountability

The Head of Manufacturing is accountable for ensuring that all manufacturing interruptions are managed and documented as per GMP regulations.

5. Procedure

5.1 Identifying Types of Interruptions

  • Classify interruptions into:
    • Equipment Failures
    • Power Failures
    • Raw Material Shortages
    • Environmental Conditions (e.g., temperature fluctuations)
  • Document details in the **Interruption Report Log (Annexure-1).**

5.2 Immediate Actions for Handling Interruptions

  • Pause the manufacturing process to prevent batch contamination.
  • Notify the production supervisor and engineering team.
  • Record immediate corrective measures in the **Corrective Action Log (Annexure-2).**

5.3 Investigating Root Causes

  • Conduct root
cause analysis using tools such as **5 Whys** or **Fishbone Diagram**.
  • Identify if the issue is recurring or isolated.
  • Document findings in the **Root Cause Investigation Report (Annexure-3).**
  • 5.4 Restarting the Manufacturing Process

    • Perform **line clearance checks** before restarting.
    • Ensure all equipment is recalibrated and functional.
    • Verify batch integrity with QA before resumption.
    • Record batch restart approval in the **Batch Restart Authorization Log (Annexure-4).**

    6. Abbreviations

    • GMP – Good Manufacturing Practices
    • QA – Quality Assurance
    • QC – Quality Control
    • SOP – Standard Operating Procedure
    • OOS – Out of Specification

    7. Documents

    • Interruption Report Log (Annexure-1)
    • Corrective Action Log (Annexure-2)
    • Root Cause Investigation Report (Annexure-3)
    • Batch Restart Authorization Log (Annexure-4)

    8. References

    • FDA Guidelines on Manufacturing Process Controls
    • ICH Q9 – Quality Risk Management
    • WHO GMP Guidelines for Process Deviations

    9. SOP Version

    Version 2.0

    10. Approval Section

    Prepared By Checked By Approved By
    Signature
    Date
    Name
    Designation
    Department

    11. Annexures

    Annexure-1: Interruption Report Log

    Date Batch No. Type of Interruption Duration QA Approval
    07/02/2025 OINT-9001 Equipment Failure 30 mins Approved

    Annexure-2: Corrective Action Log

    Date Batch No. Issue Identified Corrective Action Taken QA Approval
    07/02/2025 OINT-9001 Power Failure Switched to backup power Approved

    Annexure-3: Root Cause Investigation Report

    Date Batch No. Root Cause Identified Analysis Performed QA Approval
    07/02/2025 OINT-9001 Motor Overheating 5 Whys Analysis Approved

    Annexure-4: Batch Restart Authorization Log

    Date Batch No. Restart Approved By Remarks QA Approval
    07/02/2025 OINT-9001 QA Head Batch integrity maintained Approved

    12. Revision History

    Revision Date Revision No. Details Reason Approved By
    07/02/2025 2.0 Updated handling procedures for major interruptions Process Improvement QA Head
    01/01/2024 1.0 Initial SOP New SOP Implementation QA Head