SOP Guide for Pharma

Ointments: SOP for Handling Emergency Stops in Machines – V 2.0

SOP for Handling Emergency Stops in Machines – V 2.0

Procedure for Handling Emergency Stops in Machines

Department Production/Engineering/Quality Assurance (QA)/Safety
SOP No. SOP/Ointment/049
Supersedes V 1.0
Page No. Page X of Y
Issue Date [Insert Issue Date]
Effective Date [Insert Effective Date]
Review Date [Insert Review Date]

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to establish a structured approach for handling emergency stops in machines used in ointment manufacturing. Proper emergency stop procedures ensure personnel safety, prevent equipment damage, and maintain compliance with Good Manufacturing Practices (GMP).

2. Scope

This SOP applies to all personnel involved in operating, maintaining, and monitoring manufacturing machines in the ointment production facility.

3. Responsibilities

4. Accountability

The Production, Engineering, and QA Managers are accountable for ensuring that emergency stop procedures are followed, recorded, and reviewed regularly.

5. Procedure

5.1 Identifying Emergency Situations

5.2 Activating Emergency Stops

5.3 Post-Emergency Stop Actions

5.4 Troubleshooting and Restarting the Machine

5.4.1 Engineering Assessment

5.4.2 QA Verification

5.4.3 Machine Restart

5.5 Reporting and Documentation

6. Abbreviations

7. Documents

8. References

9. SOP Version

Version 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Emergency Stop Log

Date Machine ID Reason for Stop Action Taken Restart Approved By
01/02/2025 EM-101 Overheating Cooling system repaired QA Officer
02/02/2025 EM-102 Product leakage Seal replaced QA Officer

Annexure-2: Incident Investigation Report

Date Machine ID Incident Description Root Cause Corrective Action Verified By
01/02/2025 EM-101 Emergency stop due to overheating Blocked air vents Air vents cleaned QA Head
02/02/2025 EM-102 Leak detected at filling station Defective gasket Gasket replaced QA Head

12. Revision History:

Revision Date Revision No. Details of Revision Reason for Revision Approved By
01/01/2024 1.0 Initial Version New SOP QA Head
01/02/2025 2.0 Updated SOP Format Standardization of Document QA Head