Ointments: SOP for Cleaning and Re-Starting Manufacturing Lines – V 2.0

SOP for Cleaning and Re-Starting Manufacturing Lines – V 2.0

Procedure for Cleaning and Re-Starting Manufacturing Lines

Department Manufacturing/Production/Quality Assurance (QA)/Quality Control (QC)/Engineering
SOP No. SOP/Ointment/200
Supersedes V 1.0
Page No. Page X of Y
Issue Date [Insert Issue Date]
Effective Date [Insert Effective Date]
Review Date [Insert Review Date]

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to define a structured method for cleaning and re-starting manufacturing lines after batch completion or process interruptions, ensuring compliance with GMP standards.

2. Scope

This SOP applies to all personnel involved in cleaning, sanitization, and restarting manufacturing lines in the production facility.

3. Responsibilities

  • Production Supervisor: Ensures proper cleaning and restart procedures are followed.
  • Cleaning Personnel: Performs cleaning as per SOP.
  • QA Officer: Verifies cleaning effectiveness.
  • QC Analyst: Conducts swab tests to ensure no contamination.
  • Engineering Team: Checks and certifies equipment readiness before restart.

4. Accountability

The Head of Manufacturing is accountable for ensuring all cleaning and restart processes adhere to GMP and regulatory guidelines.

5. Procedure

5.1 Cleaning Preparation

  • Ensure production is halted before initiating cleaning.
  • Gather approved cleaning agents and PPE (Personal Protective Equipment).
  • Record preparation details in the **Cleaning Preparation Log (Annexure-1).**

5.2 Cleaning and Sanitization Process

  • Remove any residual material and debris from surfaces.
  • Use validated cleaning agents and follow contact time requirements.
  • Wipe down all contact surfaces and ensure complete rinsing.
  • Document cleaning details in the **Cleaning Execution Log (Annexure-2).**

5.3 Verification

and QC Testing
  • Conduct swab sampling to verify no residual contamination.
  • Ensure microbial limits meet regulatory requirements.
  • Record results in the **QC Verification Report (Annexure-3).**

5.4 Re-Starting the Manufacturing Line

  • Ensure all equipment is dried and inspected for cleanliness.
  • Check calibration and readiness of machines before restart.
  • Obtain QA clearance before beginning production.
  • Document restart details in the **Manufacturing Line Restart Log (Annexure-4).**

6. Abbreviations

  • GMP – Good Manufacturing Practices
  • QA – Quality Assurance
  • QC – Quality Control
  • PPE – Personal Protective Equipment
  • SOP – Standard Operating Procedure

7. Documents

  • Cleaning Preparation Log (Annexure-1)
  • Cleaning Execution Log (Annexure-2)
  • QC Verification Report (Annexure-3)
  • Manufacturing Line Restart Log (Annexure-4)

8. References

  • FDA Guidelines on Cleaning Validation
  • ICH Q9 – Quality Risk Management
  • WHO GMP Guidelines on Equipment Cleaning

9. SOP Version

Version 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Cleaning Preparation Log

Date Batch No. Cleaning Agent Used Personnel Responsible QA Approval
08/02/2025 OINT-10001 Isopropyl Alcohol John Doe Approved

Annexure-2: Cleaning Execution Log

Date Batch No. Cleaning Completed (Yes/No) Verified By QA Approval
08/02/2025 OINT-10001 Yes QA Officer Approved

Annexure-3: QC Verification Report

Date Batch No. Swab Test Result Microbial Count QA Approval
08/02/2025 OINT-10001 Pass Within Limits Approved

Annexure-4: Manufacturing Line Restart Log

Date Batch No. Restart Approved By Remarks QA Approval
08/02/2025 OINT-10001 Production Head All checks cleared Approved

12. Revision History

Revision Date Revision No. Details Reason Approved By
08/02/2025 2.0 Updated verification steps Process Improvement QA Head
01/01/2024 1.0 Initial SOP New SOP Implementation QA Head