Manufacturing: SOP for Temperature and Humidity Monitoring during Production – V 2.0
Standard Operating Procedure for Temperature and Humidity Monitoring during Production
| Department |
Manufacturing |
| SOP No. |
SOP/MFG/177/2025 |
| Supersedes |
SOP/MFG/177/2022 |
| Page No. |
Page 1 of 13 |
| Issue Date |
24/06/2025 |
| Effective Date |
25/06/2025 |
| Review Date |
24/06/2026 |
1. Purpose
To lay down a procedure for monitoring and controlling temperature and humidity in sterile and non-sterile manufacturing areas to ensure compliance with cGMP, product stability, and personnel comfort.
2. Scope
This SOP applies to all production and packaging areas, including Grade A/B/C/D zones, solution preparation rooms, filling
areas, quarantine zones, and warehouses involved in sterile injectable manufacturing.
3. Responsibilities
- Production Operator: Monitors readings and reports deviations.
- QA Personnel: Verifies environmental log data and evaluates trends.
- Engineering Team: Ensures calibration and maintenance of HVAC and monitoring devices.
4. Accountability
The Head of Manufacturing is accountable for ensuring consistent environmental monitoring and timely resolution of excursions beyond defined limits.
5. Procedure
5.1 Monitoring Devices
- Use calibrated digital temperature and humidity monitors or validated data loggers.
- Ensure sensors are installed at representative locations (workstations, equipment areas, corners).
- Calibration must be performed every 6 months or as per the calibration schedule.
5.2 Monitoring Frequency
- Record temperature and humidity readings at:
- Beginning of shift
- Every 4 hours during operation
- End of shift
- For automated systems, data should be stored electronically with periodic printouts for record-keeping.
- Manual entries shall be made in the Environmental Monitoring Log (Annexure-1).
5.3 Acceptable Ranges
- Grade A/B: Temperature 18–22°C, Relative Humidity (RH) 40–60%
- Grade C/D: Temperature 20–25°C, RH 40–65%
- Warehouse/Storage: 25°C ± 2°C, RH NMT 60%
5.4 Action on Deviations
- If temperature or humidity exceeds action limits:
- Immediately inform the engineering department.
- Initiate deviation report and document in Annexure-2.
- Stop critical operations if environment affects product quality.
- Resume operation only after conditions return within acceptable limits and QA authorization is obtained.
5.5 Trend Review and Reporting
- QA shall compile environmental trends monthly for each area.
- Unusual spikes or drift patterns must be investigated.
- Summarized reports shall be included in monthly GMP review meetings.
5.6 Preventive Maintenance
- Engineering shall service air handling units (AHUs), dehumidifiers, and chillers quarterly.
- Logs of HVAC equipment maintenance shall be reviewed monthly.
5.7 Data Integrity and Record Retention
- Ensure that data (manual or electronic) is legible, contemporaneous, attributable, and permanent.
- Records must be retained for not less than five years from date of batch release.
6. Abbreviations
- SOP: Standard Operating Procedure
- RH: Relative Humidity
- QA: Quality Assurance
- HVAC: Heating, Ventilation and Air Conditioning
- AHU: Air Handling Unit
- GMP: Good Manufacturing Practices
7. Documents
- Environmental Monitoring Log – Annexure-1
- Temperature/Humidity Deviation Log – Annexure-2
- Preventive Maintenance Checklist – Annexure-3
8. References
- WHO TRS 961 Annex 6 – GMP for sterile pharmaceutical products
- EU GMP Annex 1 – Manufacture of Sterile Medicinal Products
- 21 CFR Part 211 – cGMP for Finished Pharmaceuticals
9. SOP Version
Version: 2.0
10. Approval Section
|
Prepared By |
Checked By |
Approved By |
| Signature |
|
|
|
| Date |
|
|
|
| Name |
|
|
|
| Designation |
Manufacturing Executive |
QA Executive |
Head QA |
| Department |
Production |
Quality Assurance |
Quality Assurance |
11. Annexures
Annexure-1: Environmental Monitoring Log
| Date |
Area |
Time |
Temperature (°C) |
Humidity (%) |
Operator |
| 24/06/2025 |
Filling Room |
08:00 AM |
20.5 |
50 |
Rajesh Kumar |
Annexure-2: Temperature/Humidity Deviation Log
| Date |
Area |
Observed Value |
Limit |
Action Taken |
QA Sign |
| 22/06/2025 |
Solution Room |
26°C |
25°C |
Notified Engineering; Temperature restored |
Sunita Reddy |
Annexure-3: Preventive Maintenance Checklist
| Date |
Equipment |
Maintenance Activity |
Status |
Engineer |
| 15/06/2025 |
AHU-1 |
Filter Change, Coil Cleaning |
Completed |
Vinay Pawar |
Revision History:
| Revision Date |
Revision No. |
Details |
Reason |
Approved By |
| 01/01/2022 |
1.0 |
Initial Release |
New SOP |
QA Head |
| 24/06/2025 |
2.0 |
Updated HVAC reference and annexures |
Annual Review |
QA Head |