SOP Guide for Pharma

Manufacturing Operations: SOP for Prefilled Syringe Assembly Line Operations – V 2.0

Manufacturing Operations: SOP for Prefilled Syringe Assembly Line Operations – V 2.0

Standard Operating Procedure for Prefilled Syringe Assembly Line Operations


Department Manufacturing Operations
SOP No. SOP/MO/125/2025
Supersedes SOP/MO/125/2022
Page No. Page 1 of 15
Issue Date 24/06/2025
Effective Date 26/06/2025
Review Date 24/06/2026

1. Purpose

This SOP describes the standard procedures for operating the prefilled syringe (PFS) assembly line, ensuring all operations are performed under aseptic conditions with full compliance to GMP guidelines for sterile injectable products.

2. Scope

This procedure applies to all personnel operating and monitoring the prefilled syringe assembly

line in the manufacturing department at [Company Name]. It includes setup, operation, visual inspection, labeling, and documentation.

3. Responsibilities

  • Machine Operators: Operate, monitor, and record machine parameters and product status.
  • Maintenance Team: Ensure maintenance, calibration, and troubleshooting of equipment.
  • QA Officers: Ensure compliance with in-process controls and validate process conditions.

4. Accountability

The Manufacturing Head is accountable for execution of the SOP. QA Head is accountable for compliance with GMP and documentation integrity.

5. Procedure

5.1 Preparation

  1. Ensure cleanroom gowning is complete and compliant with aseptic entry protocol.
  2. Verify line clearance is performed and approved by QA before starting operations.
  3. Review the batch manufacturing record (BMR) for accuracy and readiness.

5.2 Line Setup

  1. Assemble machine components like plunger rods, finger flanges, barrels, and needle guards as per validated layout.
  2. Verify prefilled syringes have passed through appropriate visual and leak integrity checks.
  3. Load prefilled barrels, plungers, and accessories in designated hoppers.
  4. Set parameters on the HMI panel, such as torque for plunger insertion, speed of belt drive, and rejection logic.

5.3 Operation

  1. Initiate the process with machine interlock validation and start the main assembly sequence.
  2. Monitor the following:
    • Insertion of plungers to correct depth
    • Fixing of finger flange components
    • Application of needle safety guard
  3. Reject defective units via auto-rejection system and document rejections in Annexure-1.

5.4 In-Process Checks

  1. Perform in-process checks every 30 minutes:
    • Plunger depth using go/no-go gauge
    • Plunger torque test
    • Component orientation verification
  2. Document findings in In-Process Inspection Log (Annexure-2).

5.5 Environmental Monitoring

  1. Verify differential pressure, temperature, and RH at start and every 2 hours.
  2. Ensure Grade A/B compliance in the machine operation area.

5.6 Documentation

  1. Ensure all machine logs, process observations, and incident logs are updated in real time.
  2. QA reviews documentation and signs off after batch completion.

5.7 Line Clearance Post-Batch

  1. After batch completion, perform visual clearance.
  2. Document clearance in Line Clearance Form (Annexure-3).

6. Abbreviations

  • SOP: Standard Operating Procedure
  • PFS: Prefilled Syringe
  • QA: Quality Assurance
  • RH: Relative Humidity
  • HMI: Human-Machine Interface
  • BMR: Batch Manufacturing Record

7. Documents

  1. Defect Rejection Log – Annexure-1
  2. In-Process Inspection Log – Annexure-2
  3. Line Clearance Form – Annexure-3

8. References

  • EU-GMP Annex 1 – Manufacture of Sterile Medicinal Products
  • WHO TRS 961 Annex 6
  • ISO 11040 – Prefilled Syringes Standard

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation Manufacturing Executive QA Executive Head QA
Department Production Quality Assurance Quality Assurance

11. Annexures

Annexure-1: Defect Rejection Log

Date Batch No. Defect Type Quantity Operator
24/06/2025 PFS125A Plunger Misalignment 15 Ravi Joshi

Annexure-2: In-Process Inspection Log

Date Time Check Parameter Result Checked By
24/06/2025 10:30 AM Plunger Depth Within Limit Meena Iyer

Annexure-3: Line Clearance Form

Date Batch No. Cleared By Remarks
24/06/2025 PFS125A Sunita Reddy Area Clean & Clear

Revision History

Revision Date Revision No. Details Reason Approved By
10/01/2022 1.0 Initial Release New Equipment QA Head
24/06/2025 2.0 Format and Parameter Updates Periodic Review QA Head
Exit mobile version