2. Scope
This SOP applies to all manufacturing processes involving filling, sealing, and labeling of injectable products in vials, ampoules, and prefilled syringes where weight verification is part of in-process control (IPC) at the sterile manufacturing facility.
3. Responsibilities
- Manufacturing Operator: To perform weight checks as per the batch record and SOP.
- IPQA Officer: To verify, record, and ensure compliance of weight check limits and frequency.
- QA Executive: To review the weight check documentation and initiate necessary deviation reports for any non-conformity.
4. Accountability
The Head of Quality Assurance is accountable for implementation and compliance with this SOP across sterile manufacturing areas.
5. Procedure
5.1 Preparation for Weight Checks
- Ensure the balance or check weigher is calibrated and verified before use. Refer to the Balance Calibration Log (Annexure-1).
- Use only identified and labeled balances for IPC weight checks.
- Verify the equipment ID and location before initiating weight checks.
5.2 Execution of Weight Checks
- Collect a predefined number of units (e.g., 10 vials) from the filling line every 30 minutes or as per the BMR.
- Place each unit individually on the balance and record the gross weight.
- Refer to the Tare weight of the container (vial, ampoule, or syringe) as per specification.
- Calculate the net fill weight: Gross weight – Tare weight = Net weight.
- Compare the net weight against the approved specification/range stated in the product specification sheet.
- Record all weights in the Weight Verification Log (Annexure-2).
5.3 Acceptance Criteria
- Net weight must fall within ±5% of labeled fill weight unless otherwise specified.
- If any unit is found out of specification, perform a second check with another set of 10 units.
- If failure is confirmed, immediately inform Production and QA. Initiate deviation and investigate root cause.
5.4 Frequency of Checks
- Initial check: Before batch filling starts (trial run verification).
- Routine checks: At predefined intervals during filling.
- Post-run check: After filling operation is completed.
- Additional checks: If any abnormality or deviation is observed in the line or weight trends.
5.5 Handling Out-of-Limit Results
- Segregate the affected batch quantity filled since the last satisfactory check.
- Review line parameters (nozzle clogging, vacuum sealing, equipment speed, air pressure, etc.).
- Document all observations and findings in Deviation Report Form (Annexure-3).
- Rectify the root cause before restarting filling operation.
5.6 Documentation Requirements
- Fill all records with blue ink. Do not leave blanks. Use ‘NA’ if not applicable.
- Ensure all entries are reviewed and signed by IPQA before continuation of filling.
- Attach the weight check data with the respective batch manufacturing records.
- Maintain trend data for weight checks for all products for ongoing process monitoring.
5.7 Training
- All personnel involved in IPC weight checks must be trained in the use of balances and GMP practices.
- Training must be documented in the Training Record Log (Annexure-4).
6. Abbreviations
- SOP: Standard Operating Procedure
- IPC: In-Process Control
- BMR: Batch Manufacturing Record
- QA: Quality Assurance
- IPQA: In-Process Quality Assurance
7. Documents
- Balance Calibration Log – Annexure-1
- Weight Verification Log – Annexure-2
- Deviation Report Form – Annexure-3
- Training Record Log – Annexure-4
8. References
- WHO GMP Guidelines for Sterile Products
- 21 CFR Part 211 – Current Good Manufacturing Practice
- ICH Q8(R2) – Pharmaceutical Development
9. SOP Version
Version: 2.0
10. Approval Section
|
Prepared By |
Checked By |
Approved By |
| Signature |
|
|
|
| Date |
|
|
|
| Name |
|
|
|
| Designation |
Production Executive |
QA Executive |
Head QA |
| Department |
Production |
Quality Assurance |
Quality Assurance |
11. Annexures
Annexure-1: Balance Calibration Log
| Balance ID |
Location |
Last Calibration |
Next Due |
Status |
| BLN-01 |
Filling Room |
01/06/2025 |
01/12/2025 |
Calibrated |
Annexure-2: Weight Verification Log
| Date |
Batch No. |
Time |
Unit No. |
Gross Weight (mg) |
Net Weight (mg) |
Result |
Checked By |
| 24/06/2025 |
INJ/0625/01 |
10:00 |
1 |
515 |
500 |
Pass |
Rajesh Kumar |
Annexure-3: Deviation Report Form
| Deviation ID |
Date |
Description |
Immediate Action |
Corrective/Preventive Action |
Approved By |
| DEV/IPC/005 |
24/06/2025 |
Weight below limit in 2 units |
Line paused |
Nozzle cleaned, line retrained |
Sunita Reddy |
Annexure-4: Training Record Log
| Employee Name |
Department |
Training Date |
Trainer |
Remarks |
| Ajay Mehta |
Production |
15/06/2025 |
QA Executive |
Completed |
Revision History:
| Revision Date |
Revision No. |
Details |
Reason |
Approved By |
| 01/07/2022 |
1.0 |
Initial version |
New SOP |
Head QA |
| 25/06/2025 |
2.0 |
Updated procedure steps and annexures |
Annual Review |
Head QA |