SOP Guide for Pharma

Gel Manufacturing: SOP for Visual Inspection of Gel Batches – V 2.0

Gel Manufacturing: SOP for Visual Inspection of Gel Batches – V 2.0

Standard Operating Procedure for Visual Evaluation of Gel Batch Quality


Department Gel Manufacturing
SOP No. SOP/GM/068/2025
Supersedes SOP/GM/068/2022
Page No. Page 1 of 10
Issue Date 02/06/2025
Effective Date 04/06/2025
Review Date 02/06/2026

1. Purpose

To establish a uniform procedure for conducting visual inspection of gel batches during manufacturing and post-homogenization stages to ensure aesthetic quality and identify any non-conformities before release for packaging.

2. Scope

This SOP applies to all batches of gel formulations manufactured at the

Gel Manufacturing Department and subject to visual inspection prior to transfer or filling.

3. Responsibilities

  • Production Chemist: Conducts the initial visual inspection and records observations.
  • QA Inspector: Performs verification and signs off inspection reports.
  • Head – Manufacturing: Approves batch status based on inspection findings.

4. Accountability

The Head – Manufacturing shall be accountable for ensuring implementation and compliance with this SOP.

5. Procedure

5.1 Inspection Timing

  • After homogenization and deaeration.
  • Prior to filling or packaging.
  • During in-process sampling (as required).

5.2 Materials and Tools Required

  • White inspection tray or stainless steel tray
  • Adequate lighting (minimum 600 lux)
  • Magnifying glass (optional)
  • Visual Inspection Checklist (Annexure-1)
  • Clean glass rod for stirring

5.3 Sample Preparation

  1. Withdraw approximately 100g from each major portion of the batch (top, middle, bottom).
  2. Place on a clean inspection tray under white light.
  3. Stir gently to release entrapped air bubbles.

5.4 Inspection Parameters

Parameter Criteria
Color Uniform; no discoloration or dark spots
Clarity Transparent or as per product specification
Air Bubbles Minimal to none
Phase Separation None visible
Foreign Particles Absent
Consistency Homogeneous gel structure

5.5 Execution Steps

  1. Place the sample on the tray and view under light at different angles.
  2. Check for suspended particles, fibers, or air entrapment.
  3. Visually compare with retained samples or approved standard batch.
  4. Document all findings in Annexure-1.
  5. Attach photographic evidence for critical observations, if applicable.

5.6 Action on Observations

  • If visual anomalies are detected, quarantine the batch immediately.
  • Initiate deviation report and inform QA for further investigation.
  • Rework or rejection decisions to be taken per QA approval.

6. Abbreviations

  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • QC: Quality Control

7. Documents

  1. Visual Inspection Checklist – Annexure-1
  2. Deviation Form – Annexure-2

8. References

  • Internal Product Specifications
  • ICH Q6A Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation Jr. Production Chemist QA Executive Head – Manufacturing
Department Gel Manufacturing Quality Assurance Manufacturing

11. Annexures

Annexure-1: Visual Inspection Checklist

Batch No.
Product Name
Date
Inspected By
Color Uniformity [ ] Pass [ ] Fail
Air Bubble Presence [ ] None [ ] Minor [ ] Excessive
Foreign Particles [ ] Absent [ ] Present
Phase Separation [ ] None [ ] Observed
Consistency [ ] Homogeneous [ ] Non-Homogeneous
Remarks
Signature

Annexure-2: Deviation Form

Deviation No.
Reported Date
Observed By
Nature of Deviation
Immediate Action Taken
Root Cause (if known)
Disposition Decision
Approved By (QA)

Revision History

Revision Date Revision No. Details Reason Approved By
10/06/2022 1.0 Initial Issue New SOP QA Head
02/06/2025 2.0 Included photographic documentation requirement Periodic Review QA Head