Gel Manufacturing: SOP for Qualification of Gel Manufacturing Equipment – V 2.0
Standard Operating Procedure for Qualification of Equipment Used in Gel Manufacturing
| Department |
Gel Manufacturing |
| SOP No. |
SOP/GM/084/2025 |
| Supersedes |
SOP/GM/084/2022 |
| Page No. |
Page 1 of 12 |
| Issue Date |
02/06/2025 |
| Effective Date |
04/06/2025 |
| Review Date |
02/06/2026 |
1. Purpose
To define the systematic approach for qualification of gel manufacturing equipment to ensure that it performs as intended consistently and complies with cGMP and regulatory requirements.
2. Scope
This procedure applies to all new, modified, or relocated equipment used for gel
manufacturing processes, including but not limited to mixers, homogenizers, pH meters, and filling equipment.
3. Responsibilities
- Engineering Department: Preparation and execution of qualification protocols.
- Quality Assurance (QA): Approval of protocols, monitoring qualification activities, and review of final reports.
- Gel Manufacturing Personnel: Provide support and relevant operational data during qualification.
- Validation Team: Coordinates qualification activities and maintains documentation.
4. Accountability
QA Head is accountable for final review and approval of qualification documentation ensuring compliance with GMP guidelines.
5. Procedure
5.1 Qualification Types
- DQ (Design Qualification): Verifies design meets user requirements.
- IQ (Installation Qualification): Confirms installation per manufacturer specs.
- OQ (Operational Qualification): Ensures equipment functions under expected conditions.
- PQ (Performance Qualification): Verifies consistent performance during routine use.
5.2 Initiation and Approval
- User Requirement Specification (URS) is prepared by manufacturing in coordination with QA.
- Based on URS and equipment specification, Engineering drafts qualification protocols.
- QA reviews and approves the protocols before execution.
5.3 Execution of Qualification
- Engineering executes IQ and OQ in presence of QA.
- PQ is performed during trial batches or test runs simulating actual production conditions.
- Any deviations are documented and evaluated for impact.
5.4 Documentation and Final Report
- All test results are recorded in qualification documents.
- QA compiles and reviews data to prepare the final summary report.
- Qualified status is granted only after all stages are completed successfully.
5.5 Re-Qualification
- Re-qualification is required in the following cases:
- After major repairs or modifications
- Relocation of equipment
- At defined intervals as per validation master plan (VMP)
6. Abbreviations
- DQ: Design Qualification
- IQ: Installation Qualification
- OQ: Operational Qualification
- PQ: Performance Qualification
- URS: User Requirement Specification
- VMP: Validation Master Plan
7. Documents
- User Requirement Specification – Annexure-1
- IQ Protocol – Annexure-2
- OQ Protocol – Annexure-3
- PQ Protocol – Annexure-4
- Qualification Summary Report – Annexure-5
8. References
- ICH Q9: Quality Risk Management
- WHO TRS 937: Validation Guidelines
- 21 CFR Part 211
9. SOP Version
Version: 2.0
10. Approval Section
|
Prepared By |
Checked By |
Approved By |
| Signature |
|
|
|
| Date |
|
|
|
| Name |
|
|
|
| Designation |
Jr. Production Chemist |
QA Executive |
Head – Manufacturing |
| Department |
Gel Manufacturing |
Quality Assurance |
Manufacturing |
11. Annexures
Annexure-1: User Requirement Specification (URS)
| Equipment Name |
|
| Intended Use |
|
| Key Functional Requirements |
|
| Utilities Required |
|
| Environmental Requirements |
|
Annexure-2: Installation Qualification Protocol (IQ)
| Equipment Tag No. |
|
| Installation Checks |
Mounting, alignment, utility connections |
| Document Verification |
User Manual, Calibration Certificate |
| Compliance Remarks |
|
Annexure-3: Operational Qualification Protocol (OQ)
| Function |
Expected Outcome |
Actual Outcome |
Status (Pass/Fail) |
| Speed Control |
Variable speed from 100–500 rpm |
|
|
| Temperature Control |
Maintain 25–30°C ±2°C |
|
|
Annexure-4: Performance Qualification Protocol (PQ)
| Batch No. |
|
| Product Name |
|
| Yield (%) |
|
| Viscosity Range |
|
| Remarks |
|
Annexure-5: Qualification Summary Report
| Equipment |
|
| Qualification Type |
DQ / IQ / OQ / PQ |
| Findings |
|
| Conclusion |
|
| Final Approval By QA |
|
Revision History
| Revision Date |
Revision No. |
Change Description |
Reason |
Approved By |
| 01/06/2022 |
1.0 |
Initial release |
New SOP |
QA Head |
| 02/06/2025 |
2.0 |
Updated annexures and PQ details |
Annual review |
QA Head |