Standard Operating Procedure for Maintenance of Temperature Controllers in Gel Manufacturing
| Department | Gel Manufacturing |
|---|---|
| SOP No. | SOP/GM/049/2025 |
| Supersedes | SOP/GM/049/2022 |
| Page No. | Page 1 of 13 |
| Issue Date | 02/06/2025 |
| Effective Date | 04/06/2025 |
| Review Date | 02/06/2026 |
1. Purpose
This SOP defines the procedure for the maintenance and monitoring of temperature controllers used in gel manufacturing processes. Proper maintenance ensures accurate temperature control and process consistency, critical for the quality of gels.
2. Scope
This procedure applies to all temperature controllers installed in gel manufacturing equipment such
as mixing vessels, heating tanks, and storage units.
3. Responsibilities
- Engineering Team: Responsible for preventive maintenance and calibration.
- Production Staff: Responsible for daily usage monitoring and reporting anomalies.
- QA Personnel: Responsible for review and verification of maintenance records.
4. Accountability
The Head of Engineering and Head of Manufacturing shall be accountable for compliance with this SOP.
5. Procedure
5.1 Daily Monitoring
- Operators must inspect and record the temperature controller display before starting the batch.
- Verify that the set-point and current readings match the batch requirements.
- Note any alarms or unusual behavior and escalate to Engineering if needed.
5.2 Weekly Inspection
- Engineering personnel shall perform visual checks of connectors, sensors, and wires.
- Ensure the digital display and alarm functionality are working properly.
- Clean the controller’s exterior with a dry lint-free cloth.
5.3 Preventive Maintenance (Monthly)
- Disconnect the power supply before maintenance work.
- Open the control panel, inspect internal components for dust, corrosion, or loose terminals.
- Check all input/output terminals and wiring integrity.
- Tighten any loose screws or connections.
- Update maintenance record in the Temperature Controller Maintenance Log (Annexure-1).
5.4 Calibration (Quarterly)
- Perform calibration using a certified temperature simulator or master thermometer.
- Compare set values with actual output and adjust if deviation exceeds ±1°C.
- Document calibration values in Calibration Report (Annexure-2).
5.5 Breakdown Handling
- Immediately tag and isolate faulty controllers.
- Raise maintenance request through SAP or internal portal.
- Use replacement unit if production is ongoing and require real-time control.
- Document the breakdown and corrective action in Breakdown Log (Annexure-3).
5.6 Labeling and Status Tag
- Ensure each temperature controller has a status tag indicating ‘Calibrated’, ‘Under Maintenance’ or ‘Do Not Use’ as applicable.
- Status tags to be maintained and replaced after each maintenance or calibration.
6. Abbreviations
- SOP: Standard Operating Procedure
- QA: Quality Assurance
- PM: Preventive Maintenance
- CM: Corrective Maintenance
7. Documents
- Temperature Controller Maintenance Log – Annexure-1
- Calibration Report – Annexure-2
- Breakdown Log – Annexure-3
- Preventive Maintenance Checklist – Annexure-4
8. References
- Equipment Manufacturer’s Maintenance Manual
- WHO GMP Guidelines
- Schedule M – Temperature Control Systems
9. SOP Version
Version: 2.0
10. Approval Section
| Prepared By | Checked By | Approved By | |
|---|---|---|---|
| Signature | |||
| Date | |||
| Name | |||
| Designation | Jr. Production Chemist | QA Executive | Head – Manufacturing |
| Department | Gel Manufacturing | Quality Assurance | Manufacturing |
11. Annexures
Annexure-1: Temperature Controller Maintenance Log
| Date | Equipment ID | Checked By | Remarks | Signature |
|---|---|---|---|---|
Annexure-2: Calibration Report
| Date | Controller ID | Set Temp (°C) | Actual Temp (°C) | Deviation | Adjusted | Calibrated By |
|---|---|---|---|---|---|---|
| Yes / No |
Annexure-3: Breakdown Log
| Date | Controller ID | Issue Observed | Corrective Action | Action By | Signature |
|---|---|---|---|---|---|
Annexure-4: Preventive Maintenance Checklist
| Activity | Status (OK/Not OK) | Remarks | Date | Checked By |
|---|---|---|---|---|
| Visual Inspection | ||||
| Wiring & Connections | ||||
| Sensor Function | ||||
| Display Accuracy |
Revision History
| Revision Date | Revision No. | Details | Reason | Approved By |
|---|---|---|---|---|
| 05/06/2022 | 1.0 | Initial version | New SOP | QA Head |
| 02/06/2025 | 2.0 | Format updated, annexures added | Scheduled Review | QA Head |