Gel Manufacturing: SOP for In-process Sampling and Testing during Gel Manufacturing – V 2.0
Standard Operating Procedure for In-process Sampling and Testing in Gel Manufacturing
| Department |
Gel Manufacturing |
| SOP No. |
SOP/GM/164/2025 |
| Supersedes |
SOP/GM/164/2022 |
| Page No. |
Page 1 of 11 |
| Issue Date |
09/06/2025 |
| Effective Date |
11/06/2025 |
| Review Date |
09/06/2027 |
1. Purpose
To establish a standard procedure for in-process sampling and testing during gel manufacturing for monitoring product quality and ensuring compliance with specified in-process control parameters.
2. Scope
This SOP applies to all gel formulations manufactured at this facility. It covers procedures for collecting in-process samples, testing them for defined parameters, and documenting results for evaluation during batch release.
3. Responsibilities
- Production Operator: Responsible for informing QA and collecting samples as per defined intervals.
- Quality Assurance (QA): Monitors sampling activities, ensures compliance, and approves sample collection timing and methods.
- Quality
Control (QC): Conducts analytical testing on in-process samples and reports results to production and QA.
4. Accountability
Manager – Quality Assurance and Head – Manufacturing are accountable for the implementation and adherence to this SOP.
5. Procedure
5.1 Sampling Plan and Time Points
- Refer to the batch manufacturing record (BMR) for sampling intervals and quantity of each sample.
- Typical in-process samples include those taken after dispersion, after homogenization, and before final packing.
- Label each sample with the product name, batch number, stage, time of collection, and sampled by.
5.2 Sample Handling and Transfer
- Use clean, dry, and inert containers for sample collection.
- Avoid contamination by using sanitized spatulas or sampling devices.
- Transfer samples immediately to QC lab with appropriate documentation.
5.3 In-process Parameters for Gel
- Appearance: Uniformity, color, absence of lumps or air bubbles.
- pH: Measured at room temperature using calibrated pH meter.
- Viscosity: Tested using Brookfield viscometer as per standard method.
- Homogeneity: Visual and microscopic examination if needed.
- Weight per mL: Checked to ensure correct volume-fill.
5.4 Testing and Reporting
- QC to test each in-process sample within the defined time frame.
- Record results on In-process Quality Control (IPQC) form.
- Highlight any deviations or out-of-specification results and inform QA and production immediately.
5.5 Trending and Investigation
- QA to review in-process data for trends or variations across batches.
- Initiate investigation in case of recurring deviations or parameter drift.
- Corrective and preventive actions (CAPA) to be documented if applicable.
6. Abbreviations
- IPQC: In-Process Quality Control
- BMR: Batch Manufacturing Record
- QA: Quality Assurance
- QC: Quality Control
7. Documents
- In-process Sampling Log – Annexure-1
- IPQC Result Sheet – Annexure-2
- Sample Transfer Note – Annexure-3
8. References
- WHO TRS 986 Annex 2 – GMP Guidelines for Pharmaceuticals
- ICH Q8 – Pharmaceutical Development
- Internal Quality Manual
9. SOP Version
Version: 2.0
10. Approval Section
|
Prepared By |
Checked By |
Approved By |
| Signature |
|
|
|
| Date |
|
|
|
| Name |
|
|
|
| Designation |
Jr. Production Chemist |
QA Executive |
Head – Manufacturing |
| Department |
Gel Manufacturing |
Quality Assurance |
Manufacturing |
11. Annexures
Annexure-1: In-process Sampling Log
| Product |
|
| Batch No. |
|
| Stage |
|
| Sampling Time |
|
| Collected By |
|
| Container No. |
|
| Remarks |
|
Annexure-2: IPQC Result Sheet
| Parameter |
Specification |
Result |
Status (Pass/Fail) |
Analyst |
| Appearance |
|
|
|
|
| pH |
|
|
|
|
| Viscosity |
|
|
|
|
Annexure-3: Sample Transfer Note
| Date |
|
| Product |
|
| Batch No. |
|
| Sampling Stage |
|
| Sample Transferred To |
QC Department |
| Remarks |
|
| Signature (Production) |
|
Revision History
| Revision Date |
Revision No. |
Change Description |
Reason |
Approved By |
| 24/05/2022 |
1.0 |
Initial version |
New SOP |
QA Head |
| 09/06/2025 |
2.0 |
Revised to include annexures and trending procedure |
GMP compliance |
QA Head |