Gel Manufacturing: SOP for Cleaning Filling Machines Post Gel Filling – V 2.0
Standard Operating Procedure for Cleaning Filling Machines After Gel Filling Operations
| Department |
Gel Manufacturing |
| SOP No. |
SOP/GM/054/2025 |
| Supersedes |
SOP/GM/054/2022 |
| Page No. |
Page 1 of 12 |
| Issue Date |
02/06/2025 |
| Effective Date |
04/06/2025 |
| Review Date |
02/06/2026 |
1. Purpose
To define the procedure for cleaning and sanitizing the filling machines after completion of gel filling operations in order to maintain equipment integrity, avoid cross-contamination, and comply with GMP requirements.
2. Scope
This procedure applies to all filling machines used
for primary packaging of topical gel formulations in the Gel Manufacturing department.
3. Responsibilities
- Operators: To clean the machine as per procedure and record cleaning activity.
- Line Supervisor: To verify cleaning and ensure completeness of documentation.
- QA Personnel: To approve cleaning and perform random checks for compliance.
4. Accountability
The Head of Production and Head of Quality Assurance shall be accountable for the implementation and enforcement of this SOP.
5. Procedure
5.1 Preparation Before Cleaning
- Ensure that the filling operation has been completed and the machine is switched off.
- Affix a “To Be Cleaned” label on the equipment.
- Wear appropriate PPE such as gloves, face mask, goggles, and apron.
- Disconnect the machine from power and compressed air supply.
5.2 Dismantling of Parts
- Dismantle all contact parts like filling nozzles, hoses, pump assembly, gel feed tank, etc.
- Place all dismantled parts in labeled stainless steel trays for cleaning.
- Transport the parts to the designated equipment washing area.
5.3 Cleaning of Machine Parts
- Rinse all parts with purified water to remove residual gel.
- Wash parts using 2% v/v non-ionic detergent solution. Scrub gently with nylon brushes.
- Rinse thoroughly with purified water to remove detergent residues.
- Perform a final rinse with Water for Injection (WFI), if applicable.
- Visually inspect parts for cleanliness. No traces of gel should remain.
5.4 Cleaning of Machine Body and Non-Contact Surfaces
- Wipe the outer surfaces of the machine with a lint-free cloth dampened with 70% IPA.
- Clean the control panel and display screen carefully using a dry lint-free cloth.
- Pay special attention to corners, joints, and inaccessible areas using suitable tools.
5.5 Drying and Reassembly
- Allow the parts to dry in a controlled area or dry using clean compressed air.
- Reassemble the machine as per the equipment SOP once fully dry.
- Apply a “Cleaned” status label with date, time, and signature of operator and verifier.
5.6 Cleaning Verification
- Conduct a swab test (refer to Annexure-3) for critical parts before reuse.
- Ensure the cleaning checklist and logbook are properly filled and verified.
5.7 Cleaning Frequency
- After every batch change or product change.
- If the machine is idle for more than 72 hours.
- After preventive maintenance.
6. Abbreviations
- IPA: Isopropyl Alcohol
- PPE: Personal Protective Equipment
- WFI: Water for Injection
- QA: Quality Assurance
7. Documents
- Filling Machine Cleaning Log – Annexure-1
- Filling Machine Cleaning Checklist – Annexure-2
- Swab Test Report Format – Annexure-3
8. References
- Manufacturer’s Equipment Manual
- GMP Guidelines for Cleaning Validation
- Internal Quality Management Procedures
9. SOP Version
Version: 2.0
10. Approval Section
|
Prepared By |
Checked By |
Approved By |
| Signature |
|
|
|
| Date |
|
|
|
| Name |
|
|
|
| Designation |
Jr. Production Chemist |
QA Executive |
Head – Manufacturing |
| Department |
Gel Manufacturing |
Quality Assurance |
Manufacturing |
11. Annexures
Annexure-1: Filling Machine Cleaning Log
| Date |
Machine ID |
Product |
Batch No. |
Cleaned By |
Verified By |
Remarks |
|
|
|
|
|
|
|
Annexure-2: Filling Machine Cleaning Checklist
| Step |
Status (Yes/No) |
Comments |
Checked By |
| Gel residue removed |
|
|
|
| Detergent wash performed |
|
|
|
| Purified water rinse done |
|
|
|
| IPA wipe down completed |
|
|
|
| Cleaning log updated |
|
|
|
Annexure-3: Swab Test Report Format
| Swab Location |
Surface Area (cm²) |
Swab Taken By |
Test Performed |
Result |
Remarks |
| Filling Nozzle |
25 |
|
TOC |
|
|
| Pump Assembly |
25 |
|
Residue |
|
|
Revision History
| Revision Date |
Revision No. |
Details |
Reason |
Approved By |
| 01/06/2022 |
1.0 |
Initial issue |
New SOP |
QA Head |
| 02/06/2025 |
2.0 |
Checklist and swab report format added |
GMP alignment |
QA Head |