Standard Operating Procedure for Verification of Raw Materials Before Dispensing
Department | Elixir Department |
---|---|
SOP No. | SOP/ELX/011/2025 |
Supersedes | SOP/ELX/011/2022 |
Page No. | Page 1 of 8 |
Issue Date | 13/04/2025 |
Effective Date | 15/04/2025 |
Review Date | 13/04/2026 |
1. Purpose
To define the procedure for verifying raw materials prior to dispensing in order to ensure correct identity, quantity, status, and suitability for elixir manufacturing. This SOP ensures accuracy, traceability, and GMP compliance.
2. Scope
This procedure applies to all raw materials including APIs, excipients, and solvents stored in the Elixir Department’s approved material stores and intended for batch-wise dispensing.
3. Responsibilities
- Warehouse Operator:
- Perform physical checks on the selected materials.
- Ensure correct selection and condition of the material containers.
- Warehouse Supervisor:
- Verify material labels, status, and documentation.
- QA Officer:
- Cross-check material identity and approval status.
- Authorize the material for dispensing.
See also Elixir Department: SOP for Dispensing Active Pharmaceutical Ingredients for Elixirs - V 2.0
4. Accountability
The Head of Quality Assurance and the Head of Warehouse are accountable for ensuring that only approved and verified raw materials are used in the dispensing process.
5. Procedure
5.1 Receipt of Dispensing Requisition
- Review the Batch Manufacturing Record (BMR) and Material Requisition Slip (Annexure-1).
- Ensure the details mentioned include:
- Product Name
- Batch Number
- Material Name & Code
- Required Quantity
5.2 Material Selection from Storage
- Locate the material in the approved storage zone based on FIFO (First In First Out) or FEFO (First Expiry First Out) as applicable.
- Ensure the container carries a label with the following:
- Material Name
- Material Code
- Batch Number
- Manufacturer / Supplier Name
- Quantity Available
- Retest/Expiry Date
- Status Label (Approved)
5.3 Verification Checks
- Match each material’s details with the corresponding COA and Approval Record.
- Ensure the container is not damaged, leaking, tampered, or illegible.
- Cross-check the following against the BMR:
- Material Name & Code
- Batch Number
- Status (Approved)
- Available Quantity
- Retest/Expiry Date is valid
- For controlled materials or restricted-use items, ensure QA authorization is obtained.
5.4 Documentation
- Fill in the Raw Material Verification Checklist (Annexure-2).
- Warehouse Supervisor and QA must sign the checklist before dispensing begins.
- Attach the completed checklist to the batch dispensing documents.
5.5 Handling of Discrepancies
- If any mismatch, labeling error, expired status, or damaged container is observed:
- Segregate the material immediately.
- Label it as “Under Investigation.”
- Inform QA and document the deviation.
5.6 Verification During Dispensing
- Before opening the container for dispensing:
- Verify label again.
- Ensure material is clean and free from foreign matter.
- Proceed with dispensing only after QA re-verification.
6. Abbreviations
- SOP: Standard Operating Procedure
- BMR: Batch Manufacturing Record
- COA: Certificate of Analysis
- QA: Quality Assurance
7. Documents
- Material Requisition Slip (Annexure-1)
- Raw Material Verification Checklist (Annexure-2)
8. References
- WHO GMP Guidelines – Materials Management
- 21 CFR Part 211 – Subpart E: Control of Components
9. SOP Version
Version: 2.0
10. Approval Section
Prepared By | Checked By | Approved By | |
---|---|---|---|
Signature | |||
Date | |||
Name | |||
Designation | |||
Department |
11. Annexures
Annexure-1: Material Requisition Slip
Date | Product Name | Batch No. | Material Name | Code | Qty Required | Requested By |
---|---|---|---|---|---|---|
13/04/2025 | Elixir A | EA0425-001 | Sorbitol | RM-SOR-001 | 25 kg | Rajesh Kumar |
Annexure-2: Raw Material Verification Checklist
Item | Status (Yes/No) | Remarks |
---|---|---|
Correct Material Selected | Yes | Label matched |
Batch No. & Expiry Validated | Yes | Retest due: 10/2026 |
Container Integrity Confirmed | Yes | No damage |
QA Approval Present | Yes | Approved label affixed |
Revision History:
Revision Date | Revision No. | Revision Details | Reason for Revision | Approved By |
---|---|---|---|---|
10/01/2022 | 1.0 | Initial Release | New SOP | QA Head |
13/04/2025 | 2.0 | Added discrepancy handling steps | Audit Requirement | QA Head |