Creams: SOP for Semi-Solid Product Storage in Bulk Containers – V 2.0
Standard Operating Procedure for Semi-Solid Product Storage in Bulk Containers
Department |
Creams |
SOP No. |
SOP/CRM/069/2025 |
Supersedes |
SOP/CRM/069/2022 |
Page No. |
Page 1 of 6 |
Issue Date |
21/01/2026 |
Effective Date |
26/01/2026 |
Review Date |
21/01/2027 |
1. Purpose
This Standard Operating Procedure (SOP) defines the procedure for storing semi-solid cream products in bulk containers. Proper storage ensures the quality, stability, and safety of semi-solid products before they are transferred to packaging or used in further production processes. This SOP ensures that all semi-solid products are stored according to regulatory standards and best practices to prevent contamination, degradation, or any quality deviations.
2. Scope
This SOP applies to all semi-solid cream products stored in bulk containers within the Creams Department. It covers the procedures for receiving, storing, monitoring, and managing bulk containers containing semi-solid products. The scope also includes monitoring environmental conditions such as temperature, humidity, and container integrity.
3. Responsibilities
- Warehouse Personnel: Responsible for receiving and transferring bulk containers of semi-solid products into the storage area, ensuring proper labeling, and monitoring container conditions.
- Quality Control (QC): Responsible for conducting periodic inspections of stored semi-solid products, ensuring they meet quality standards and verifying that storage conditions are compliant with specifications.
- Quality Assurance (QA): Ensures adherence to GMP guidelines for storage and handles the documentation and approval of any deviations.
- Maintenance Team: Responsible for ensuring that storage containers, temperature control systems, and other storage-related equipment are in good working order.
4. Accountability
The Head of Creams Manufacturing is accountable for ensuring the correct implementation of this SOP for all semi-solid product storage operations. The QA Manager is responsible for overseeing the overall compliance with GMP standards and reviewing storage conditions periodically.
5. Procedure
5.1 Pre-Storage Preparation
-
Verify that all semi-solid products have passed quality control checks and are cleared for storage.
-
Ensure that bulk containers are appropriately labeled with batch numbers, product names, manufacturing dates, and expiration dates.
-
Inspect the storage containers for cleanliness and integrity. Ensure that they are free from contamination and suitable for storing semi-solid products.
-
Verify that the storage area is clean, dry, and well-ventilated. Confirm that temperature and humidity levels are within the required range for the specific product.
5.2 Transfer to Storage
-
Upon clearance, transport bulk containers to the designated storage area using clean equipment, such as forklifts or pallet jacks.
-
Ensure that containers are stored in a manner that prevents any physical damage. Place containers in an organized manner to facilitate easy identification and retrieval.
-
Store semi-solid products at the appropriate temperature, as specified by the product’s storage requirements. For example, store heat-sensitive products in refrigerated or climate-controlled areas.
5.3 Environmental Monitoring
-
Regularly monitor the storage environment for temperature and humidity. Ensure that these are maintained within the specified range for the product’s stability.
-
Record the environmental data in the Environmental Monitoring Log (Annexure-1).
-
If the storage conditions deviate from the acceptable range, notify the QA team immediately and initiate corrective actions.
5.4 Storage Maintenance
-
Inspect storage containers for any signs of leakage, damage, or degradation. Any damaged or compromised containers should be segregated and reported to QA for further investigation.
-
Periodically check the integrity of the storage containers. Ensure that seals, lids, or closures are intact and that the products are protected from contamination.
5.5 Documentation and Record Keeping
-
Complete all relevant documentation related to the storage of semi-solid products, including batch numbers, storage conditions, and dates.
-
Use the Bulk Storage Log (Annexure-2) to document the transfer of semi-solid products to storage.
-
Maintain records of environmental monitoring data (temperature and humidity) in the Environmental Monitoring Log (Annexure-1).
-
Ensure that all records are reviewed by QA for compliance with SOPs and GMP standards.
5.6 Final Approval for Release
-
Once the product has been stored for the required period and no deviations are found, the QA team will review the records and approve the batch for release.
-
The release authorization must be documented in the Release Authorization Log (Annexure-3).
6. Abbreviations
- GMP: Good Manufacturing Practices
- QC: Quality Control
- QA: Quality Assurance
- PPE: Personal Protective Equipment
7. Documents
- Annexure-1: Environmental Monitoring Log
- Annexure-2: Bulk Storage Log
- Annexure-3: Release Authorization Log
8. References
- Good Manufacturing Practices (GMP) Guidelines – 21 CFR Part 211
- International Conference on Harmonisation (ICH) Q7 – Good Manufacturing Practice for Active Pharmaceutical Ingredients
- FDA Guidelines for Cosmetics Manufacturing
9. SOP Version
Version: 2.0
10. Approval Section
|
Prepared By |
Checked By |
Approved By |
Signature |
|
|
|
Date |
|
|
|
Name |
|
|
|
Designation |
|
|
|
Department |
|
|
|
11. Annexures
Annexure-1: Environmental Monitoring Log
Date |
Time |
Temperature (°C) |
Humidity (%) |
Operator |
Comments |
21/01/2026 |
09:00 AM |
22°C |
50% |
John Doe |
Conditions are within specifications |
Annexure-2: Bulk Storage Log
Batch Number |
Storage Location |
Transfer Date |
Operator |
Storage Conditions |
12345 |
Storage Room 1 |
21/01/2026 |
Jane Smith |
Temperature 22°C, Humidity 50% |
Annexure-3: Release Authorization Log
Batch Number |
Authorization Date |
Authorized By |
Comments |
12345 |
21/01/2026 |
John Doe |
Approved for release |
Revision History:
Revision Date |
Revision No. |
Revision Details |
Reason for Revision |
Approved By |
01/03/2024 |
1.0 |
Initial Version |
New SOP Creation |
QA Head |
01/03/2025 |
2.0 |
Format Revision and Updates |
Standardization of Document |
QA Head |