SOP Guide for Pharma

Creams: SOP for Avoiding Air Entrainment in Cream Manufacturing – V 2.0

Creams: SOP for Avoiding Air Entrainment in Cream Manufacturing – V 2.0

Standard Operating Procedure for Avoiding Air Entrainment in Cream Manufacturing

Department Creams
SOP No. SOP/CRM/076/2025
Supersedes SOP/CRM/076/2022
Page No. Page 1 of 6
Issue Date 21/01/2026
Effective Date 26/01/2026
Review Date 21/01/2027

1. Purpose

This SOP defines the measures to avoid air entrainment during cream manufacturing. The goal is to ensure the product’s smooth texture and consistency by preventing the incorporation of unwanted air into the cream mixture.

2. Scope

This SOP applies to all cream manufacturing processes in the Creams Department where mixing or blending operations occur. It covers methods for minimizing air entrainment during product preparation.

3. Responsibilities

4. Accountability

The Head of Production is accountable for ensuring that air entrainment is minimized during the manufacturing process. The QA Manager is responsible for verifying compliance with this SOP and ensuring product quality.

5. Procedure

5.1 Pre-Mixing and Blending Preparation

  1. Ensure that the mixing vessel is clean and free of contaminants.
  2. Verify that the ingredients are weighed and ready for mixing, ensuring that all solid and liquid components are at the correct temperatures for mixing.
  3. Ensure that the mixing equipment, such as mixers and paddles, is in good condition and calibrated to avoid excessive air incorporation.

5.2 Mixing Process

  1. Begin the mixing process at low speed to gently combine ingredients without causing air entrapment.
  2. Gradually increase the speed only as necessary to ensure even distribution of the ingredients while maintaining control over air incorporation.
  3. Use equipment such as high-shear mixers or mixers with controlled speed settings to limit the introduction of air into the mixture.
  4. Ensure that mixing is done in a sealed environment or with minimal exposure to open air to prevent air from being trapped in the cream.

5.3 Monitoring and Control

  1. Monitor the mixture regularly for signs of air entrainment, such as foaming or bubbling. If these signs appear, reduce the speed or stop mixing to allow the air to escape.
  2. Use a vacuum or deaeration process if necessary to remove any air that has been incorporated into the product.
  3. Ensure that the final product has the desired smoothness and uniformity with no visible air pockets or bubbles.

5.4 Post-Mixing Checks

  1. Once the mixing is complete, perform a sensory test to check for smoothness and texture consistency. The cream should be free from lumps and air pockets.
  2. If air is detected in the final product, adjust the mixing technique, reduce the mixing speed, or use a vacuum process to remove the excess air.
  3. Document all batch details, including the mixing time, speed, temperature, and any deviations in the Mixing Log (Annexure-1).

5.5 Documentation and Record Keeping

  1. Complete all necessary documentation, including the batch number, mixing parameters, and air entrapment control measures used during the mixing process.
  2. Ensure that all records are signed by the operator and reviewed by the QA team to confirm compliance with the SOP and GMP standards.

5.6 Final Approval

  1. The QA team must review all records, including batch number, mixing parameters, and air entrapment checks, to verify that the product is compliant with quality standards before it moves to the next stage of manufacturing.
  2. If any issues with air entrainment are detected, corrective actions must be taken, and the batch should be reprocessed if necessary.

6. Abbreviations

7. Documents

  1. Annexure-1: Mixing Log
  2. Annexure-2: Air Entrapment Control Log

8. References

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Mixing Log

Batch Number Mixing Time Mixing Speed Air Entrainment Check Operator Comments
12345 30 minutes 200 RPM None John Doe No issues

Annexure-2: Air Entrapment Control Log

Batch Number Air Detection (Yes/No) Method Used for Air Removal Time Operator Comments
12345 No Standard Mixing 10:00 AM Jane Smith No issues

Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By
01/03/2024 1.0 Initial Version New SOP Creation QA Head
01/03/2025 2.0 Format Revision and Updates Standardization of Document QA Head
Exit mobile version