BA-BE Studies: SOP for Preventive Maintenance of Analytical Instruments – V 2.0

BA-BE Studies: SOP for Preventive Maintenance of Analytical Instruments – V 2.0

Standard Operating Procedure for Preventive Maintenance of Analytical Instruments in BA/BE Studies

Department BA-BE Studies
SOP No. SOP/BA-BE/184/2025
Supersedes SOP/BA-BE/184/2022
Page No. Page 1 of 9
Issue Date 17/04/2025
Effective Date 20/04/2025
Review Date 17/04/2026

1. Purpose

To define the procedure for the planning, execution, documentation, and verification of preventive maintenance (PM) activities for analytical instruments used in BA/BE bioanalytical studies, ensuring optimal performance and regulatory compliance.

2. Scope

This SOP applies to all analytical instruments used in the bioanalytical laboratory, including LC-MS/MS systems, HPLC units, analytical balances, centrifuges, vortex mixers, and

nitrogen evaporators used in BA/BE study analysis.

3. Responsibilities

  • Instrument User: Ensures PM due dates are tracked, reports issues, and participates during service activities.
  • Engineering/Maintenance Staff: Performs or coordinates preventive maintenance as per schedule and logs activities.
  • QA Representative: Verifies that PM is completed within schedule and reviews documentation for completeness.

4. Accountability

The Bioanalytical Department Head is accountable for ensuring timely preventive maintenance of all analytical instruments to avoid breakdowns and ensure uninterrupted compliance-driven operations.

5. Procedure

5.1 Maintenance Schedule Preparation

  1. Prepare and maintain a Preventive Maintenance Calendar for all instruments in Annexure-1: PM Schedule Tracker.
  2. Schedule PM frequency based on:
    • Manufacturer recommendations
    • Instrument usage frequency
    • Criticality to study operations
  3. Ensure vendor service contracts are in place for third-party PM where applicable.

5.2 Execution of Preventive Maintenance

  1. Perform PM activities on the scheduled date or within ±3 working days.
  2. Use equipment-specific maintenance SOPs or vendor checklists for the activity.
  3. Ensure the system is in shutdown mode and tagged “Under Maintenance.”
  4. Document all tasks in Annexure-2: Preventive Maintenance Log:
    • Instrument ID
    • Date and Time
    • Activity performed (e.g., vacuum pump oil change, filter replacement, calibration)
    • Observations and completion status

5.3 Post-Maintenance Qualification

  1. After completion, run system suitability test (SST) or calibration check as applicable.
  2. Record SST results in instrument logbook and attach to maintenance record.
  3. If SST fails, do not release the instrument until repeat PM or troubleshooting is completed.

5.4 Delayed or Missed Maintenance

  1. If PM is delayed beyond scheduled window:
    • Immediately notify QA
    • Document reason in Annexure-3: Deviation Report for PM
    • Do not use the instrument until PM is completed and qualified

5.5 Labeling and Status Update

  1. Affix “PM Completed” sticker with:
    • Date of maintenance
    • Next due date
    • Performed by
  2. Update PM tracker accordingly.

5.6 Review and Verification

  1. QA shall review PM records monthly and ensure no due dates are missed.
  2. Audit trail, calibration verification, and checklist completeness will be verified.
  3. Corrective action shall be initiated for recurring delays.

6. Abbreviations

  • PM: Preventive Maintenance
  • LC-MS/MS: Liquid Chromatography–Mass Spectrometry
  • SST: System Suitability Test
  • QA: Quality Assurance

7. Documents

  1. PM Schedule Tracker – Annexure-1
  2. Preventive Maintenance Log – Annexure-2
  3. Deviation Report for PM – Annexure-3

8. References

  • ICH Q10: Pharmaceutical Quality System
  • 21 CFR Part 211 – Equipment Maintenance
  • Instrument-Specific Maintenance SOPs

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: PM Schedule Tracker

Instrument ID Instrument Name PM Due Date PM Done Date Status
LCMS-002 Triple Quad MS 10/04/2025 09/04/2025 Completed

Annexure-2: Preventive Maintenance Log

Date Instrument ID Activity Performed Performed By Remarks
09/04/2025 LCMS-002 Replaced vacuum oil, cleaned ESI source Sunita Reddy Stable baseline achieved

Annexure-3: Deviation Report for PM

Instrument ID Scheduled PM Date Actual Date Reason for Delay Impact on Study Corrective Action
HPLC-011 05/04/2025 12/04/2025 Service engineer unavailable Instrument not used during delay Alternate vendor assigned

Revision History:

Revision Date Revision No. Details Reason Approved By
01/01/2022 1.0 Initial Release New SOP QA Head
17/04/2025 2.0 Updated PM tracker, deviation handling, and annexures Audit Readiness QA Head