Standard Operating Procedure for Creating Clinical Site Close-Out Checklist in BA/BE Studies

Department BA-BE Studies
SOP No. SOP/BA-BE/128/2025
Supersedes SOP/BA-BE/128/2022
Page No. Page 1 of 9
Issue Date 17/04/2025
Effective Date 20/04/2025
Review Date 17/04/2026

1. Purpose

To define the procedure for preparing and executing a standardized Clinical Site Close-Out Checklist for bioavailability/bioequivalence (BA/BE) studies, ensuring all site activities are properly concluded and documented.

2. Scope

This SOP applies to study monitors, clinical research associates (CRAs), and project managers involved in the site close-out process for BA/BE clinical trials.

3. Responsibilities

  • CRA/Monitor: Prepares and executes
the site close-out checklist and coordinates documentation retrieval.
  • Principal Investigator: Ensures completeness of study documentation and archiving.
  • QA Personnel: Reviews checklist completion and ensures regulatory compliance.
  • Project Manager: Ensures sponsor requirements for site closure are met.
  • 4. Accountability

    The Clinical Trial Manager is accountable for ensuring all elements of the close-out checklist are addressed and appropriately documented prior to formal site closure.

    5. Procedure

    5.1 Initiating Close-Out

    1. Initiate close-out checklist once the last subject’s last visit (LSLV) and data collection are complete.
    2. Notify site via formal communication using Annexure-1: Site Close-Out Notification Template.

    5.2 Close-Out Checklist Preparation

    1. Download and customize Annexure-2: Site Close-Out Checklist.
    2. Checklist must include, at minimum:
      • Final subject log and accountability forms
      • Resolution of data queries and protocol deviations
      • Archiving of source documents and CRFs
      • Return or destruction of IP and unused materials
      • Verification of signed informed consent documents
      • Confirmation of SAE reports submission and closure

    5.3 On-Site Close-Out Visit

    1. Conduct the visit in the presence of the PI and study coordinator.
    2. Verify:
      • All essential documents are in the Investigator Site File (ISF)
      • All subject-related documents are completed and signed
      • Storage conditions of archived documents are compliant
    3. Document observations and pending actions in Annexure-3: Site Close-Out Visit Report.

    5.4 Final Sign-Off and Archival

    1. Review completed checklist and ensure no open action items remain.
    2. PI and CRA must sign off Annexure-4: Site Close-Out Certification Form.
    3. Archive all original documents at the site and send copies to sponsor/CRO.

    5.5 Communication to Sponsor and Ethics Committee

    1. Send formal notification of site closure to the sponsor and Institutional Ethics Committee (IEC) using Annexure-5.
    2. Include summary of:
      • Subjects enrolled and completed
      • Adverse events reported
      • Final ISF content verification

    6. Abbreviations

    • CRA: Clinical Research Associate
    • PI: Principal Investigator
    • ISF: Investigator Site File
    • CRF: Case Report Form
    • IP: Investigational Product
    • IEC: Institutional Ethics Committee

    7. Documents

    1. Site Close-Out Notification Template – Annexure-1
    2. Site Close-Out Checklist – Annexure-2
    3. Site Close-Out Visit Report – Annexure-3
    4. Site Close-Out Certification Form – Annexure-4
    5. Site Closure Communication to IEC/Sponsor – Annexure-5

    8. References

    • ICH E6(R2) – Good Clinical Practice
    • Schedule Y – Drugs and Cosmetics Rules, India
    • CDSCO Inspection Checklist

    9. SOP Version

    Version: 2.0

    10. Approval Section

    Prepared By Checked By Approved By
    Signature
    Date
    Name
    Designation
    Department

    11. Annexures

    Annexure-1: Site Close-Out Notification Template

    Date Site Name Study Code PI Notification By
    15/04/2025 ABC Clinical Unit BE-128 Dr. Meena Joshi Rajesh Kumar

    Annexure-2: Site Close-Out Checklist

    Task Status Remarks
    All CRFs completed and signed Yes Verified by CRA
    IP returned/destructed Yes Destruction Certificate filed

    Annexure-3: Site Close-Out Visit Report

    Date CRA PI Summary of Activities
    16/04/2025 Sunita Reddy Dr. Meena Joshi Documents verified, ISF archived

    Annexure-4: Site Close-Out Certification Form

    Site PI Name CRA Name Certification Date
    ABC Clinical Unit Dr. Meena Joshi Sunita Reddy 17/04/2025

    Annexure-5: Site Closure Communication to IEC/Sponsor

    Date Recipient Summary Contents Submitted By
    18/04/2025 IEC Chairperson Final subject data, AE summary, ISF status Rajesh Kumar

    Revision History:

    Revision Date Revision No. Details Reason Approved By
    10/01/2022 1.0 Initial Release Regulatory Compliance QA Head
    17/04/2025 2.0 Included templates for formal IEC closure communication Audit Observation QA Head