API Manufacturing: SOP for Line Clearance Before Start of Manufacturing – V 2.0

API Manufacturing: SOP for Line Clearance Before Start of Manufacturing – V 2.0

Standard Operating Procedure for Line Clearance Before Start of Manufacturing in API Manufacturing

Department API Manufacturing
SOP No. SOP/API/040/2025
Supersedes SOP/API/040/2022
Page No. Page 1 of 10
Issue Date 13/04/2025
Effective Date 15/04/2025
Review Date 13/04/2026

1. Purpose

To define the procedure for conducting line clearance before the initiation of any API manufacturing batch to ensure equipment, materials, documentation, and area are clean, ready, and free from remnants of previous processes or documents.

2. Scope

This SOP is applicable to all production areas and equipment in the API manufacturing facility where line clearance is a prerequisite to beginning batch production.

3. Responsibilities

4. Accountability

The Production Head is accountable for execution of the line clearance process. QA Head is responsible for verification and approval of line clearance records.

5. Procedure

5.1 Pre-Line Clearance Checks by Production

  1. Ensure all cleaning activities are completed and documented as per the respective cleaning SOP.
  2. Confirm that the area is free from:
    • Previous batch materials
    • Labels or tags
    • Documents or printouts not related to the new batch
  3. Verify equipment calibration is current and status tags are affixed.
  4. Ensure availability of raw materials, BMR, and utilities (air, vacuum, nitrogen, water).
  5. Intimate QA for clearance and fill out “Line Clearance Request Form” (Annexure-1).

5.2 Line Clearance by QA

  1. QA personnel shall physically inspect the area and equipment using the “Line Clearance Checklist” (Annexure-2).
  2. Verify cleanliness of:
    • Reactor interiors and exteriors
    • Sampling ports, transfer lines, filters
    • Platform, floors, walls, tables, trolleys
  3. Cross-check presence and correctness of:
    • BMR and product labels
    • Material status labels
    • Calibration status tags
  4. Sign and approve the checklist with date and time.
  5. Label the area and equipment as “Ready for Use.”

5.3 Documentation and Recordkeeping

  1. Ensure the completed checklist is attached to the BMR and retained for QA review.
  2. Any discrepancies must be resolved before production initiation.
  3. QA to maintain records of line clearance logs and trend analysis.

6. Abbreviations

7. Documents

  1. Line Clearance Request Form (Annexure-1)
  2. Line Clearance Checklist (Annexure-2)
  3. Line Clearance Log (Annexure-3)

8. References

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Line Clearance Request Form

Date Batch No. Area Requested By Remarks
13/04/2025 API-202505 Reactor Bay-1 Ready for QA check

Annexure-2: Line Clearance Checklist

Item Status (Y/N) Remarks
Previous batch labels removed Y Verified
Equipment cleaned and labeled Y Tag affixed
Area free of material remnants Y Complies

Annexure-3: Line Clearance Log

Date Batch No. Area QA Verified By Status
13/04/2025 API-202505 Reactor Bay-1 Cleared

Revision History:

Revision Date Revision No. Details Reason Approved By
01/01/2022 1.0 Initial Issue GMP Requirement QA Head
13/04/2025 2.0 Checklist and Form Revised Compliance Update QA Head