Standard Operating Procedure for Cleaning of Manufacturing Equipment in API Manufacturing
Department | API Manufacturing |
---|---|
SOP No. | SOP/API/037/2025 |
Supersedes | SOP/API/037/2022 |
Page No. | Page 1 of 11 |
Issue Date | 13/04/2025 |
Effective Date | 15/04/2025 |
Review Date | 13/04/2026 |
1. Purpose
To define the procedure for cleaning manufacturing equipment used in the production of Active Pharmaceutical Ingredients (APIs), ensuring removal of product residues, cleaning agents, and microbial contamination, thereby preventing cross-contamination.
2. Scope
This SOP applies to all major and auxiliary equipment used in API manufacturing processes, including reactors, centrifuges, filters, dryers, blenders, mills, and associated transfer lines.
3. Responsibilities
- Production Operator: Execute cleaning activities as per the approved cleaning procedure.
- QA Officer: Verify cleaning status, approve equipment for reuse, and maintain cleaning records.
- Engineering: Maintain cleaning utilities and ensure equipment is in proper working condition.
4. Accountability
The Production Head is accountable for ensuring cleaning procedures are followed. QA Head is responsible for verification and compliance with GMP cleaning standards.
5. Procedure
5.1 Cleaning Types
- Product-to-Product Cleaning: Between different product batches.
- Batch-to-Batch Cleaning: Between consecutive batches of same product (if required).
- Periodic Cleaning: At defined intervals even if not used.
5.2 Pre-Cleaning Checks
- Ensure equipment is shut down, disconnected from utilities, and cooled.
- Wear appropriate PPE (gloves, goggles, apron, mask).
- Verify that waste material has been removed from the equipment.
- Collect and dispose of cleaning residues in accordance with waste SOPs.
5.3 Cleaning Procedure
- Use approved cleaning agents as per respective cleaning SOP (alkaline, acidic, or neutral detergent).
- Wash equipment surfaces with potable water followed by detergent cleaning.
- Use brushes, lint-free cloths, or spray balls depending on equipment size and shape.
- Rinse with purified water until the rinse sample meets acceptable limits for:
- pH
- Conductivity
- Residue (visual and chemical)
- Dry the equipment with clean air or lint-free wipes.
- Label equipment as “Cleaned” with cleaning date, time, and operator initials.
5.4 Cleaning Verification
- Perform swab or rinse testing for:
- Active ingredient residue
- Cleaning agent residue
- Microbial bioburden (if applicable)
- Use validated analytical methods and refer to established acceptance limits.
- Document results in the “Cleaning Verification Log” (Annexure-1).
5.5 Equipment Release
- QA to review cleaning and test results.
- Label equipment as “Ready for Use” upon approval.
- Record equipment status in “Equipment Cleaning Status Log” (Annexure-2).
6. Abbreviations
- SOP: Standard Operating Procedure
- QA: Quality Assurance
- API: Active Pharmaceutical Ingredient
- PPE: Personal Protective Equipment
7. Documents
- Cleaning Verification Log (Annexure-1)
- Equipment Cleaning Status Log (Annexure-2)
- Swab Test Report (Annexure-3)
8. References
- ICH Q7 – Good Manufacturing Practice for APIs
- 21 CFR Part 211 – Subpart D (Equipment)
- WHO TRS 986, Annex 2 – Cleaning Validation Guidelines
9. SOP Version
Version: 2.0
10. Approval Section
Prepared By | Checked By | Approved By | |
---|---|---|---|
Signature | |||
Date | |||
Name | |||
Designation | |||
Department |
11. Annexures
Annexure-1: Cleaning Verification Log
Date | Equipment ID | Product Name | Swab/Rinse | Result | Reviewed By |
---|---|---|---|---|---|
13/04/2025 | R-105 | API-X | Swab | Complies |
Annexure-2: Equipment Cleaning Status Log
Equipment ID | Cleaning Date | Next Use | Status | QA Approval |
---|---|---|---|---|
R-105 | 13/04/2025 | 14/04/2025 | Ready |
Annexure-3: Swab Test Report
Location | Surface Area (cm²) | Analyte | Result (ppm) | Limit | Status |
---|---|---|---|---|---|
Inner Reactor Wall | 25 | API-X | 0.5 | ≤1.0 | Pass |
Revision History:
Revision Date | Revision No. | Details | Reason | Approved By |
---|---|---|---|---|
01/01/2022 | 1.0 | Initial Issue | New Equipment SOP | QA Head |
13/04/2025 | 2.0 | Expanded scope, added verification logs | Regulatory compliance | QA Head |