Skip to content
  • Clinical Studies
  • Pharma GMP
  • Pharma Tips
  • Stability Studies
  • Pharma Books
  • Schedule M

SOP Guide for Pharma

The Ultimate Resource for Pharmaceutical SOPs and Best Practices

  • Home
  • Job Safety Analysis (JSA)
    • Oral Dosage Forms (Tablets & Capsules)
    • Oral Liquid Dosage Forms (Syrups, Elixirs, Suspensions, Emulsions)
    • Powder and Granule Dosage Forms
    • Topical Dosage Forms (Creams, Ointments, Gels, Lotions, Pastes)
    • Transdermal Dosage Forms (Patches)
  • Standard Test Procedures (STP)
  • SOP – Blog Post
  • Toggle search form

Creams: SOP for Start-Up Checks on Manufacturing Equipment – V 2.0

Posted on By

Creams: SOP for Start-Up Checks on Manufacturing Equipment – V 2.0

Standard Operating Procedure for Start-Up Checks on Manufacturing Equipment

Department Creams
SOP No. SOP/CRM/061/2025
Supersedes SOP/CRM/061/2022
Page No. Page 1 of 6
Issue Date 22/12/2025
Effective Date 27/12/2025
Review Date 22/12/2026

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to define the steps required for performing start-up checks on manufacturing equipment used in the production of creams. These checks are essential to ensure that all equipment is functioning properly and safely before production begins, thereby reducing the risk of equipment failure, ensuring product quality, and maintaining compliance with Good Manufacturing Practices (GMP).

2. Scope

This SOP applies to all manufacturing equipment used in the Creams Department, including mixers, homogenizers, filling machines, and any other equipment involved in the cream manufacturing process. It covers the procedure for verifying equipment readiness and safety before the start of production.

3. Responsibilities

  • Production Team: Responsible for performing the start-up checks according to this SOP and ensuring that all equipment is fully operational and ready for use before initiating production.
  • Quality Control (QC): Responsible for verifying that the equipment checks are completed accurately and that the equipment is free from any defects or contamination.
  • Maintenance
Team: Responsible for ensuring that the equipment is well-maintained and that any necessary repairs or adjustments are completed before the start of production.
  • Quality Assurance (QA): Responsible for reviewing the completed start-up checklists and ensuring compliance with this SOP before approving the equipment for production use.
  • 4. Accountability

    The Head of Creams Manufacturing is responsible for ensuring that start-up checks are completed properly and in a timely manner. The QA Manager is accountable for reviewing and approving the results of the start-up checks before production begins.

    5. Procedure

    5.1 Pre-Start-Up Preparation

    1. Ensure that all necessary equipment and tools required for the start-up checks are available and in good working condition. This includes checklists, inspection tools, calibration equipment, and any personal protective equipment (PPE) required for the task.
    2. Review the equipment maintenance logs to ensure that all scheduled maintenance tasks have been completed, and that the equipment is in optimal condition.
    3. Ensure that the area around the equipment is clean, free of obstructions, and adequately prepared for start-up.

    5.2 Visual Inspection of Equipment

    1. Perform a visual inspection of all equipment to check for any visible signs of damage, wear, or contamination. This includes checking:

      • Hoses, pumps, and valves for leaks or cracks
      • Mixing and homogenizing equipment for proper alignment and no signs of damage
      • Filling machines for any blockages or malfunctions
      • All safety guards and emergency stops to ensure they are intact and functional
    2. If any equipment is found to be damaged or not functioning properly, report it to the Maintenance Team for immediate repairs. Do not proceed with production until the issue is resolved.

    5.3 Equipment Calibration and Settings

    1. Verify that all equipment is properly calibrated before use. This includes:

      • Checking temperature settings for mixers and homogenizers
      • Verifying filling volumes for filling machines
      • Ensuring that flow rates for pumps and mixing speeds are set according to the standard operating conditions for the batch being processed
    2. If the equipment requires calibration, ensure that the calibration is performed according to the equipment manual and that calibration records are documented.

    5.4 Functional Testing

    1. Perform a functional test on each piece of equipment to ensure it operates correctly. This includes:

      • Running the equipment without material to ensure proper functionality
      • Testing mixing, homogenizing, and pumping actions
      • Checking filling machines to ensure the correct fill levels are achieved
    2. During testing, observe for any irregular sounds, vibrations, or malfunctions. Any issues identified should be reported to the Maintenance Team for corrective actions.

    5.5 Safety Checks

    1. Conduct a safety check to ensure that all safety devices (e.g., emergency stops, safety interlocks) are functioning properly and have not been bypassed or tampered with.
    2. Verify that all personal protective equipment (PPE), such as gloves, safety goggles, and hearing protection, is available and in good condition.
    3. Ensure that all emergency exits and safety equipment, such as fire extinguishers, are accessible and operational.

    5.6 Documentation of Start-Up Checks

    1. Complete the Start-Up Checklist (Annexure-1) for each piece of equipment, documenting the results of the inspection, calibration, and functional tests.
    2. If any deviations or issues are found during the start-up checks, document them in the Deviation Report Form (Annexure-2) and report them to the appropriate team (e.g., Maintenance, QA).
    3. Ensure that all start-up checklists are signed and dated by the operator performing the checks and reviewed by the QA team.

    5.7 Final Approval

    1. The QA team must review the completed start-up checklists, ensuring that all required checks have been performed and that the equipment is safe and ready for use.
    2. Once the QA team approves the equipment, the production team can begin the manufacturing process.

    5.8 Ongoing Monitoring

    1. Monitor the performance of the equipment throughout the production process to ensure it continues to function as expected. If any issues arise during production, stop the process and perform troubleshooting and corrective actions as necessary.

    6. Abbreviations

    • QC: Quality Control
    • QA: Quality Assurance
    • GMP: Good Manufacturing Practices
    • PPE: Personal Protective Equipment

    7. Documents

    1. Start-Up Checklist (Annexure-1)
    2. Deviation Report Form (Annexure-2)

    8. References

    • Good Manufacturing Practices (GMP) Guidelines – 21 CFR Part 211
    • International Conference on Harmonisation (ICH) Q7 – Good Manufacturing Practice for Active Pharmaceutical Ingredients
    • FDA Guidelines for Cosmetics Manufacturing

    9. SOP Version

    Version: 2.0

    10. Approval Section

    Prepared By Checked By Approved By
    Signature
    Date
    Name
    Designation
    Department

    11. Annexures

    Annexure-1: Start-Up Checklist

    Equipment Inspection Item Result Initials Comments
    Mixing Tank Visual Inspection Pass J.D. No issues

    Annexure-2: Deviation Report Form

    Deviation Description Time Batch Number Operator Immediate Action
    Equipment malfunction 08:00 AM 12345 John Doe Notified maintenance

    Revision History:

    Revision Date Revision No. Revision Details Reason for Revision Approved By
    01/03/2024 1.0 Initial Version New SOP Creation QA Head
    01/03/2025 2.0 Format Revision and Updates Standardization of Document QA Head
    See also  Creams: SOP for Mixing Techniques for Cream Formulations - V 2.0
    Creams V 2.0 Tags:Batch record documentation for creams, Change control procedures for cream manufacturing, Cleaning and sanitization SOPs in creams production, Complaint handling SOPs in creams production, Continuous improvement SOPs for cream manufacturing, Cream manufacturing process guidelines, Creams production documentation practices, Deviation handling SOPs in creams production, Employee training SOPs in creams manufacturing, Environmental monitoring SOPs in creams manufacturing, Equipment calibration SOPs for cream manufacturing, GMP compliance in creams production, Internal audit procedures in creams production, Packaging and labeling SOPs for creams, Pharmaceutical SOPs, Product quality review procedures for creams, Product release criteria SOPs for creams, Quality control SOPs for creams, ream manufacturing SOP, Regulatory requirements for cream production SOPs, Risk management SOPs in creams manufacturing, Stability testing SOPs for cream products, Standard operating procedures for skincare products, Supplier qualification SOPs for cream ingredients, Validation protocols for cream production processes

    Post navigation

    Previous Post: Ointments: SOP for Preventing Mix-Ups During Dispensing – V 2.0
    Next Post: Capsule: SOP for Cleaning Vacuum Systems Used in Capsule Filling – V 2.0

    Standard Operating Procedures V 1.0

    • Aerosols
    • Analytical Method Development
    • Bioequivalence Bioavailability Study
    • Capsule Formulation
    • Clinical Studies
    • Creams
    • Data Integrity
    • Dental Dosage Forms
    • Drug Discovery
    • Environment, Health and Safety
    • Formulation Development
    • Gels
    • Good Distribution Practice
    • Good Warehousing Practices
    • In-Process Control
    • Injectables
    • Liquid Orals
    • Liposome and Emulsion Formulations
    • Lotions
    • Lyophilized Products
    • Maintenance Dept.
    • Medical Devices
    • Metered-Dose Inhaler
    • Microbiology Testing
    • Nanoparticle Formulation
    • Nasal Spray Formulations
    • Nebulizers
    • Ocular (Eye) Dosage Forms
    • Ointments
    • Otic (Ear) Dosage Forms
    • Pharmacovigilance
    • Powder & Granules
    • Purchase Departments
    • Quality Assurance
    • Quality Control
    • Raw Material Stores
    • Regulatory Affairs
    • Tablet Manufacturing
    • Rectal Dosage Forms
    • Transdermal Patches
    • Vaginal Dosage Forms
    • Validations and Qualifications

    Read SOPs in your Language:

     - 
    Bengali
     - 
    bn
    English
     - 
    en
    Gujarati
     - 
    gu
    Hindi
     - 
    hi
    Malayalam
     - 
    ml
    Marathi
     - 
    mr
    Punjabi
     - 
    pa
    Tamil
     - 
    ta
    Telugu
     - 
    te

    NEW! Revised SOPs – V 2.0

    • Aerosols V 2.0
    • Analytical Method Development V 2.0
    • API Manufacturing V 2.0
    • BA-BE Studies V 2.0
    • Biosimilars V 2.0
    • Capsules V 2.0
    • Creams V 2.0
    • Elixers V 2.0
    • Ointments V 2.0
    • Raw Material Warehouse V 2.0
    • Tablet Manufacturing V2.0

    New Publication: A must for All.

    Copyright © 2025 SOP Guide for Pharma.

    Powered by PressBook WordPress theme

    Go to mobile version