Skip to content
  • Clinical Studies
  • Pharma GMP
  • Pharma Tips
  • Stability Studies
  • Pharma Books
  • Schedule M

SOP Guide for Pharma

The Ultimate Resource for Pharmaceutical SOPs and Best Practices

  • Home
  • Job Safety Analysis (JSA)
    • Oral Dosage Forms (Tablets & Capsules)
    • Oral Liquid Dosage Forms (Syrups, Elixirs, Suspensions, Emulsions)
    • Powder and Granule Dosage Forms
    • Topical Dosage Forms (Creams, Ointments, Gels, Lotions, Pastes)
    • Transdermal Dosage Forms (Patches)
  • Standard Test Procedures (STP)
  • SOP – Blog Post
  • Toggle search form

Aerosol: SOP for Performance Qualification (PQ) of Aerosol Crimping Machines – V 2.0

Posted on By

Aerosol: SOP for Performance Qualification (PQ) of Aerosol Crimping Machines – V 2.0

SOP for Performance Qualification (PQ) of Aerosol Crimping Machines

Department Aerosol
SOP No. SOP/Aerosol/133/2025
Supersedes SOP/Aerosol/133/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to outline the process for performing Performance Qualification (PQ) of aerosol crimping machines. PQ verifies that the crimping machine consistently performs its intended function under normal operating conditions and meets all performance specifications. The goal is to ensure that the machine is capable of reliably and efficiently producing aerosol products that meet quality standards.

2. Scope

This SOP applies to the Performance Qualification of all aerosol crimping machines used in the manufacturing process. The PQ process covers the verification of machine performance, including crimping consistency, sealing quality, and operational reliability over extended production runs.

3. Responsibilities

  • Engineering Team: Responsible for overseeing the Performance Qualification process, performing required tests, and ensuring machine performance meets the specifications.
  • Production Team: Responsible for assisting with the setup and operation of the crimping machine during the PQ process and documenting the performance results.
  • Quality Assurance (QA) Team: Responsible for reviewing the PQ documentation, approving the PQ report, and ensuring that the machine is qualified for use in production.
  • Maintenance Team: Responsible for ensuring that
the crimping machine is in optimal condition prior to performing the PQ and addressing any maintenance issues that arise during the process.

4. Accountability

The Manufacturing Manager is accountable for ensuring that the Performance Qualification of the aerosol crimping machines is carried out in compliance with this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

5. Procedure

5.1. Preparing for Performance Qualification

  1. Before starting the PQ process, ensure that the aerosol crimping machine has successfully passed the Installation Qualification (IQ) and Operational Qualification (OQ) stages.
  2. Ensure that all necessary equipment and materials are available, including aerosol cans, valves, propellants, and sealing materials.
  3. Verify that the crimping machine is clean, calibrated, and in good working condition before conducting the PQ process.
  4. Ensure that the performance specifications for the crimping machine, as outlined by the manufacturer and internal quality standards, are available for reference during the PQ process.
  5. Establish the PQ team, which should include representatives from Engineering, Production, and QA teams.

5.2. Conducting the Performance Qualification

  1. Perform the following tests as part of the PQ process:
    • Crimping Consistency: Verify that the crimping machine produces consistent and reliable crimp seals across multiple batches. The test should involve crimping a set number of cans (at least 20) and measuring the consistency of the seal strength and appearance.
    • Sealing Quality: Test the quality of the crimp seal by performing a leak test, ensuring that the crimp is intact and airtight. This test should be performed on several cans, using appropriate methods such as submersion in water or pressure decay tests.
    • Cycle Time: Measure the time required for the crimping machine to complete one cycle, including the time taken to position the aerosol cans, apply the crimp, and remove the finished cans. The cycle time should be within the specified limits for production speed.
    • Machine Performance Under Normal Operating Conditions: Run the crimping machine under normal production conditions for a set period (e.g., 4 hours) to assess the machine’s ability to perform without issues or failures. Monitor for any mechanical failures, downtime, or irregularities in performance.
  2. During testing, ensure that all relevant machine settings (e.g., pressure, speed, temperature) are within the specified operating range and meet the manufacturer’s recommendations.
  3. Record all test results, including the number of successful crimping cycles, any deviations or failures, and the corrective actions taken. Document the performance data in the Performance Qualification Report (Annexure-1).

5.3. Documenting the Performance Qualification

  1. Document the following information in the Performance Qualification Report (Annexure-1):
    • Details of the crimping machine, including the equipment ID, model, serial number, and location
    • The performance specifications for the crimping machine, as well as the operational parameters tested (e.g., crimping consistency, sealing quality, cycle time)
    • The results of each test, including the number of successful tests, any deviations or failures, and the corrective actions taken
    • Signatures of the personnel performing the tests, along with the date and time of testing
  2. The Performance Qualification Report should be signed by the responsible team members and reviewed by the QA team.

5.4. Reviewing and Approving the Performance Qualification

  1. The QA team should review the Performance Qualification Report to ensure that the crimping machine meets the required performance specifications and is capable of reliably producing quality aerosol products.
  2. If any deviations are observed during the PQ process, they should be documented in the Deviation Log (Annexure-2). Corrective actions should be taken, and the tests should be repeated to verify the effectiveness of the corrective actions.
  3. The QA team should approve the report once all tests are complete and any deviations have been addressed.

5.5. Finalizing the PQ Process

  1. Once the Performance Qualification is completed and approved, the crimping machine can be used for regular production.
  2. All documentation, including the Performance Qualification Report and any supporting documents (e.g., deviation reports, corrective actions), should be archived and accessible for future audits and reviews.

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CAPA: Corrective and Preventive Action
  • PQ: Performance Qualification

7. Documents

  1. Performance Qualification Report (Annexure-1)
  2. Deviation Log (Annexure-2)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • International Council for Harmonisation (ICH) Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Performance Qualification Report

Equipment ID Model Number Serial Number Test Date Test Type Result
CRIMP-001 Model X SN123456 06/02/2025 Crimping Consistency Pass
CRIMP-001 Model X SN123456 06/02/2025 Sealing Quality Pass

Annexure-2: Deviation Log

Deviation ID Deviation Description Corrective Action Assigned To Status
DEV-12345 Crimping accuracy out of tolerance Adjusted crimp pressure Rajesh Patel Completed

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated performance testing procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
See also  Aerosol: SOP for Monitoring and Documenting Validation Batches - V 2.0
Aerosols V 2.0 Tags:Aerosol Batch Production, Aerosol Can Design, Aerosol Cold Filling, Aerosol Documentation Standards, Aerosol Emissions Control, Aerosol Environmental Regulations, Aerosol equipment calibration, Aerosol Filling Process, Aerosol Fire Safety Measures, Aerosol Formulation, Aerosol Good Manufacturing Practice (GMP), Aerosol Hazardous Materials Handling, Aerosol Incident Reporting, Aerosol Leak Testing, Aerosol Maintenance Schedules, Aerosol Personal Protective Equipment (PPE), Aerosol Pressure Filling, Aerosol Product Labeling, Aerosol Product Testing, Aerosol Propellant Selection, Aerosol quality control, Aerosol Regulatory Compliance, Aerosol Risk Assessment, Aerosol Safety Protocols, Aerosol Standard Operating Procedures (SOPs), Aerosol Storage Requirements, Aerosol Training Programs, Aerosol Valve Crimping, Aerosol Ventilation Systems, Aerosol Waste Disposal

Post navigation

Previous Post: Biosimilars: SOP for Regulatory Compliance for GMOs – V 2.0
Next Post: BA-BE Studies: SOP for Emergency Exit and Fire Drill Plan at Clinical Site – V 2.0

Standard Operating Procedures V 1.0

  • Aerosols
  • Analytical Method Development
  • Bioequivalence Bioavailability Study
  • Capsule Formulation
  • Clinical Studies
  • Creams
  • Data Integrity
  • Dental Dosage Forms
  • Drug Discovery
  • Environment, Health and Safety
  • Formulation Development
  • Gels
  • Good Distribution Practice
  • Good Warehousing Practices
  • In-Process Control
  • Injectables
  • Liquid Orals
  • Liposome and Emulsion Formulations
  • Lotions
  • Lyophilized Products
  • Maintenance Dept.
  • Medical Devices
  • Metered-Dose Inhaler
  • Microbiology Testing
  • Nanoparticle Formulation
  • Nasal Spray Formulations
  • Nebulizers
  • Ocular (Eye) Dosage Forms
  • Ointments
  • Otic (Ear) Dosage Forms
  • Pharmacovigilance
  • Powder & Granules
  • Purchase Departments
  • Quality Assurance
  • Quality Control
  • Raw Material Stores
  • Regulatory Affairs
  • Tablet Manufacturing
  • Rectal Dosage Forms
  • Transdermal Patches
  • Vaginal Dosage Forms
  • Validations and Qualifications

Read SOPs in your Language:

 - 
Bengali
 - 
bn
English
 - 
en
Gujarati
 - 
gu
Hindi
 - 
hi
Malayalam
 - 
ml
Marathi
 - 
mr
Punjabi
 - 
pa
Tamil
 - 
ta
Telugu
 - 
te

NEW! Revised SOPs – V 2.0

  • Aerosols V 2.0
  • Analytical Method Development V 2.0
  • API Manufacturing V 2.0
  • BA-BE Studies V 2.0
  • Biosimilars V 2.0
  • Capsules V 2.0
  • Creams V 2.0
  • Elixers V 2.0
  • Ointments V 2.0
  • Raw Material Warehouse V 2.0
  • Tablet Manufacturing V2.0

New Publication: A must for All.

Copyright © 2025 SOP Guide for Pharma.

Powered by PressBook WordPress theme

Go to mobile version