Skip to content
  • Clinical Studies
  • Pharma GMP
  • Pharma Tips
  • Stability Studies
  • Pharma Books
  • Schedule M

SOP Guide for Pharma

The Ultimate Resource for Pharmaceutical SOPs and Best Practices

  • Home
  • Job Safety Analysis (JSA)
    • Oral Dosage Forms (Tablets & Capsules)
    • Oral Liquid Dosage Forms (Syrups, Elixirs, Suspensions, Emulsions)
    • Powder and Granule Dosage Forms
    • Topical Dosage Forms (Creams, Ointments, Gels, Lotions, Pastes)
    • Transdermal Dosage Forms (Patches)
  • Standard Test Procedures (STP)
  • SOP – Blog Post
  • Toggle search form

Aerosol: SOP for Retrospective Validation of Aerosol Manufacturing Processes – V 2.0

Posted on By

Aerosol: SOP for Retrospective Validation of Aerosol Manufacturing Processes – V 2.0

SOP for Retrospective Validation of Aerosol Manufacturing Processes

Department Aerosol
SOP No. SOP/Aerosol/117/2025
Supersedes SOP/Aerosol/117/2022
Page No. Page 1 of Y
Issue Date 06/02/2025
Effective Date 16/02/2025
Review Date 06/02/2028

1. Purpose

This Standard Operating Procedure (SOP) defines the process for conducting retrospective validation of aerosol manufacturing processes. The objective is to ensure that manufacturing processes that were previously in operation but have not undergone formal validation are reviewed and validated retrospectively. This ensures that the processes comply with Good Manufacturing Practice (GMP) and regulatory standards, and are capable of producing products consistently that meet the required specifications.

2. Scope

This SOP applies to aerosol manufacturing processes that have been in operation but were not initially validated or require validation after a significant period of production. The process includes reviewing historical data, production records, and product quality results to confirm the robustness of the process and compliance with regulatory requirements.

3. Responsibilities

  • Validation Team: Responsible for conducting the retrospective validation, reviewing historical production data, and ensuring that all relevant process parameters are identified and validated.
  • Quality Assurance (QA) Team: Responsible for overseeing the retrospective validation process, ensuring that the validation complies with GMP standards and regulatory guidelines, and reviewing the final validation report.
  • Production Team: Responsible for providing historical production data, identifying any known issues or deviations, and supporting the validation process by providing relevant documentation.
  • Regulatory Affairs Team: Ensures that the retrospective validation complies with regulatory standards and guidelines specific to aerosol products.

4. Accountability

The Manufacturing Manager is accountable for ensuring that retrospective validation is conducted in accordance with this SOP. The overall compliance with this SOP is overseen by the Quality Assurance (QA) Manager.

See also  Aerosol: SOP for Charging Propellants in Aerosol Manufacturing - V 2.0

5. Procedure

5.1. Identifying the Need for Retrospective Validation

  1. Retrospective validation should be considered in the following circumstances:
    • When a manufacturing process was used for production but was never formally validated.
    • When significant changes or upgrades have been made to equipment, formulations, or process parameters that require validation.
    • If previous validation records are unavailable or insufficient.
  2. Retrospective validation should also be considered if deviations or non-conformities during routine production raise concerns about the process’s ability to meet product quality specifications.

5.2. Document Review and Data Collection

  1. The first step in the retrospective validation process is to review all historical production records, including:
    • Batch records for all previous production runs
    • Quality control data, including test results for physical and chemical parameters
    • Deviations or non-conformities observed during production
    • Equipment calibration records and maintenance logs
    • Operator training records
  2. The Validation Team should compile this information to assess whether the process has consistently met quality specifications over time.
  3. If historical data is incomplete or unavailable, the retrospective validation process may require additional studies or trials to ensure that the process is capable of meeting all product specifications.

5.3. Identifying Critical Process Parameters (CPPs)

  1. Using the historical production and quality data, the Validation Team should identify and define the critical process parameters (CPPs) that directly affect product quality. These may include:
    • Formulation characteristics (e.g., ingredient concentrations, viscosity)
    • Equipment settings (e.g., temperature, pressure, filling speed)
    • Environmental conditions (e.g., humidity, temperature in the manufacturing area)
    • Quality attributes of the final product (e.g., appearance, spray rate, stability)
  2. Once the CPPs are identified, the team should review historical data to verify whether these parameters have been controlled consistently and whether the product met the required specifications.
See also  Aerosol: SOP for Collecting In-Process Samples for Analysis - V 2.0

5.4. Data Analysis and Evaluation

  1. The data collected from historical production runs should be analyzed to verify whether the CPPs were consistently within the defined acceptable range. If the process has consistently met product specifications with minimal deviations, it may be considered validated.
  2. If deviations or non-conformities were observed, the root cause of these issues should be identified and corrective actions should be implemented. This may include re-validation activities or additional studies to address any gaps in process control.
  3. The following must be considered during data analysis:
    • Consistency of product quality across different batches
    • Control over critical parameters during production
    • Analysis of any trends in quality test results (e.g., stability testing, spray rate measurements)

5.5. Documenting the Retrospective Validation Process

  1. All findings from the retrospective validation process should be documented in a Retrospective Validation Report (Annexure-1). This report should include:
    • A summary of the historical data reviewed
    • The identified CPPs and whether they were consistently controlled
    • The analysis of any deviations or non-conformities
    • Corrective actions taken to address any identified issues
    • Conclusions regarding the process’s ability to consistently meet product specifications
  2. The final validation report should be reviewed and approved by the QA team and relevant department heads. The report must be signed and dated by the responsible personnel, and any corrective actions or revalidation activities should be documented in the Corrective Action Log (Annexure-2).

5.6. Re-validation or Additional Testing

  1. If the retrospective validation reveals inconsistencies or concerns about the process, re-validation or additional testing may be required. This may include:
    • Running additional batches under controlled conditions to verify process consistency
    • Testing product quality at different stages of production to confirm compliance with specifications
    • Conducting trials to evaluate the impact of any corrective actions taken
  2. After completing the re-validation, a final report should be submitted for review and approval. The re-validation report should follow the same documentation process as outlined in the initial retrospective validation procedure.
See also  Aerosol: SOP for Stability Testing of Actuators and Valves - V 2.0

6. Abbreviations

  • GMP: Good Manufacturing Practice
  • QA: Quality Assurance
  • SOP: Standard Operating Procedure
  • CPP: Critical Process Parameter
  • CFR: Code of Federal Regulations
  • CAPA: Corrective and Preventive Action

7. Documents

  1. Retrospective Validation Report (Annexure-1)
  2. Corrective Action Log (Annexure-2)

8. References

This SOP is based on the following regulatory guidelines and industry standards:

  • Good Manufacturing Practice (GMP) Guidelines
  • FDA Code of Federal Regulations (CFR) Title 21, Part 211
  • International Council for Harmonisation (ICH) Guidelines

9. SOP Version

Version: 2.0

10. Approval Section

Prepared By Checked By Approved By
Signature
Date
Name
Designation
Department

11. Annexures

Annexure-1: Retrospective Validation Report

Batch Number Validation Date Result Remarks
Batch-001 10/02/2025 Pass Process validated successfully with no deviations

Annexure-2: Corrective Action Log

Action ID Action Description Assigned To Completion Date Remarks
ACT-12345 Re-calibrated mixing equipment Rajesh Patel 18/02/2025 Resolved issue with inconsistent mixing

12. Revision History:

Revision Date Revision No. Revision Details Reason for Revision Approved By Page No. Ref. Point No. Details of Revision
01/01/2024 V 1.0 Initial Release First Issue Anjali Sharma Page 1 [Ref Point] First Release
01/01/2025 V 2.0 Updated retrospective validation procedures To comply with updated GMP regulations Anjali Sharma Page 1 [Ref Point] Updated procedures
Aerosols V 2.0 Tags:Aerosol Batch Production, Aerosol Can Design, Aerosol Cold Filling, Aerosol Documentation Standards, Aerosol Emissions Control, Aerosol Environmental Regulations, Aerosol equipment calibration, Aerosol Filling Process, Aerosol Fire Safety Measures, Aerosol Formulation, Aerosol Good Manufacturing Practice (GMP), Aerosol Hazardous Materials Handling, Aerosol Incident Reporting, Aerosol Leak Testing, Aerosol Maintenance Schedules, Aerosol Personal Protective Equipment (PPE), Aerosol Pressure Filling, Aerosol Product Labeling, Aerosol Product Testing, Aerosol Propellant Selection, Aerosol quality control, Aerosol Regulatory Compliance, Aerosol Risk Assessment, Aerosol Safety Protocols, Aerosol Standard Operating Procedures (SOPs), Aerosol Storage Requirements, Aerosol Training Programs, Aerosol Valve Crimping, Aerosol Ventilation Systems, Aerosol Waste Disposal

Post navigation

Previous Post: BA-BE Studies: SOP for Meal Composition and Timing for Fed Studies – V 2.0
Next Post: Creams: SOP for Operating Tube-Sealing Machines – V 2.0

Standard Operating Procedures V 1.0

  • Aerosols
  • Analytical Method Development
  • Bioequivalence Bioavailability Study
  • Capsule Formulation
  • Clinical Studies
  • Creams
  • Data Integrity
  • Dental Dosage Forms
  • Drug Discovery
  • Environment, Health and Safety
  • Formulation Development
  • Gels
  • Good Distribution Practice
  • Good Warehousing Practices
  • In-Process Control
  • Injectables
  • Liquid Orals
  • Liposome and Emulsion Formulations
  • Lotions
  • Lyophilized Products
  • Maintenance Dept.
  • Medical Devices
  • Metered-Dose Inhaler
  • Microbiology Testing
  • Nanoparticle Formulation
  • Nasal Spray Formulations
  • Nebulizers
  • Ocular (Eye) Dosage Forms
  • Ointments
  • Otic (Ear) Dosage Forms
  • Pharmacovigilance
  • Powder & Granules
  • Purchase Departments
  • Quality Assurance
  • Quality Control
  • Raw Material Stores
  • Regulatory Affairs
  • Tablet Manufacturing
  • Rectal Dosage Forms
  • Transdermal Patches
  • Vaginal Dosage Forms
  • Validations and Qualifications

Read SOPs in your Language:

 - 
Bengali
 - 
bn
English
 - 
en
Gujarati
 - 
gu
Hindi
 - 
hi
Malayalam
 - 
ml
Marathi
 - 
mr
Punjabi
 - 
pa
Tamil
 - 
ta
Telugu
 - 
te

NEW! Revised SOPs – V 2.0

  • Aerosols V 2.0
  • API Manufacturing V 2.0
  • BA-BE Studies V 2.0
  • Biosimilars V 2.0
  • Capsules V 2.0
  • Creams V 2.0
  • Ointments V 2.0
  • Raw Material Warehouse V 2.0
  • Tablet Manufacturing V2.0

New Publication: A must for All.

Copyright © 2025 SOP Guide for Pharma.

Powered by PressBook WordPress theme

Go to mobile version