Skip to content
  • Clinical Studies
  • Pharma GMP
  • Pharma Tips
  • Stability Studies
  • Pharma Books
  • Schedule M

SOP Guide for Pharma

The Ultimate Resource for Pharmaceutical SOPs and Best Practices

  • Home
  • Job Safety Analysis (JSA)
    • Oral Dosage Forms (Tablets & Capsules)
    • Oral Liquid Dosage Forms (Syrups, Elixirs, Suspensions, Emulsions)
    • Powder and Granule Dosage Forms
    • Topical Dosage Forms (Creams, Ointments, Gels, Lotions, Pastes)
    • Transdermal Dosage Forms (Patches)
  • Standard Test Procedures (STP)
  • SOP – Blog Post
  • Toggle search form

Ointments: SOP for Equipment Qualification in Ointment Manufacturing – V 2.0

Posted on By

SOP for Equipment Qualification in Ointment Manufacturing – V 2.0

Procedure for Equipment Qualification in Ointment Manufacturing

Department Quality Assurance (QA)/Validation/Engineering/Production
SOP No. SOP/Ointment/131
Supersedes V 1.0
Page No. Page X of Y
Issue Date [Insert Issue Date]
Effective Date [Insert Effective Date]
Review Date [Insert Review Date]

1. Purpose

The purpose of this Standard Operating Procedure (SOP) is to define the process for equipment qualification in ointment manufacturing. This ensures that all equipment used in production meets predefined operational, performance, and compliance requirements before use.

2. Scope

This SOP applies to all personnel in the Quality Assurance (QA), Validation, Engineering, and Production departments responsible for the qualification of new, modified, or relocated equipment in ointment manufacturing.

3. Responsibilities

  • QA Officer: Ensures compliance with equipment qualification protocols.
  • Validation Team: Develops qualification protocols and executes validation studies.
  • Engineering Team: Supports installation and calibration of equipment.
  • Production Supervisor: Ensures adherence to equipment qualification requirements.
  • QA Manager: Approves final qualification reports and maintains documentation.
See also  Ointments: SOP for Ensuring Calibration of Critical Instruments - V 2.0

4. Accountability

The QA and Validation Managers are accountable for ensuring that all equipment used in ointment manufacturing undergoes proper qualification as per GMP, FDA, ICH, and WHO guidelines.

5. Procedure

5.1 Phases of Equipment Qualification

Equipment qualification follows four key phases:

  • Design Qualification (DQ): Verification that the equipment design meets process requirements.
  • Installation Qualification (IQ): Ensures the equipment is installed according to manufacturer specifications.
  • Operational Qualification (OQ): Confirms the equipment functions
as intended under operating conditions.
  • Performance Qualification (PQ): Validates that the equipment consistently performs under real production conditions.
  • 5.2 Design Qualification (DQ)

    • Ensure equipment design meets GMP and process requirements.
    • Review manufacturer specifications and functional requirements.
    • Document risk assessments and compliance evaluations.
    • Approve DQ report before proceeding to installation.

    5.3 Installation Qualification (IQ)

    • Verify that the equipment is installed in accordance with manufacturer guidelines.
    • Ensure proper electrical, mechanical, and environmental setup.
    • Confirm calibration and alignment with other production systems.
    • Document all installation parameters in the IQ report.

    5.4 Operational Qualification (OQ)

    • Conduct test runs to confirm equipment operates within set parameters.
    • Verify process variables, including:
      • Temperature control
      • Mixing speeds
      • Homogenization efficiency
      • Heating and cooling rates
    • Document operational test results and corrective actions.
    • Obtain approval for the OQ report before proceeding to performance qualification.

    5.5 Performance Qualification (PQ)

    • Perform test production batches using qualified equipment.
    • Ensure consistency in:
      • Batch uniformity
      • Product viscosity and spreadability
      • Filling precision and sealing integrity
    • Document performance results and approve final qualification.

    5.6 Requalification and Maintenance

    • Conduct periodic requalification based on equipment usage and performance trends.
    • Initiate requalification after major repairs or modifications.
    • Ensure proper documentation of maintenance and calibration activities.

    5.7 Documentation and Review

    • Maintain all qualification reports in the Equipment Qualification Log.
    • QA must review and approve all qualification records.
    • Ensure data is available for regulatory audits.

    6. Abbreviations

    • GMP – Good Manufacturing Practices
    • QA – Quality Assurance
    • IQ – Installation Qualification
    • OQ – Operational Qualification
    • PQ – Performance Qualification
    • DQ – Design Qualification

    7. Documents

    • Equipment Qualification Protocol (Annexure-1)
    • Equipment Qualification Log (Annexure-2)

    8. References

    • ICH Q7 – Good Manufacturing Practice Guide
    • WHO Guidelines for Equipment Qualification
    • US FDA Guidance on Equipment Validation

    9. SOP Version

    Version 2.0

    10. Approval Section

    Prepared By Checked By Approved By
    Signature
    Date
    Name
    Designation
    Department

    11. Annexures

    Annexure-1: Equipment Qualification Protocol

    Equipment Type Qualification Phase Test Parameter Acceptance Criteria
    Mixing Tank OQ Agitation Speed ± 5% of set value
    Filling Machine PQ Fill Volume Accuracy ± 1% of target

    Annexure-2: Equipment Qualification Log

    Date Equipment ID Qualification Phase Test Performed Result Reviewed By
    01/02/2025 MIX-1001 IQ Installation Verification Pass QA Manager
    02/02/2025 FILL-2002 PQ Batch Performance Pass QA Manager

    12. Revision History:

    Revision Date Revision No. Details of Revision Reason for Revision Approved By
    01/01/2024 1.0 Initial Version New SOP QA Head
    01/02/2025 2.0 Updated SOP Format Standardization of Document QA Head
    See also  Ointments: SOP for Handling Emergency Stops in Machines - V 2.0
    Ointments V 2.0 Tags:Ointment application SOP, Ointment batch record SOP, Ointment compounding SOP, Ointment dispensing SOP, Ointment filling SOP, Ointment formulation SOP, Ointment manufacturing SOP, Ointment microbiological testing SOP, Ointment pH testing SOP, Ointment production SOP, Ointment quality control SOP, Ointment stability study SOP, Pharmaceutical ointment SOP, SOP for ointment homogenization, SOP for ointment labeling, SOP for ointment mixing, SOP for ointment packaging, SOP for ointment preparation, SOP for ointment raw material testing, SOP for ointment shelf-life determination, SOP for ointment stability testing, SOP for ointment sterilization, SOP for ointment storage, SOP for ointment testing, SOP for ointment viscosity testing

    Post navigation

    Previous Post: Capsule: SOP for Shelf-Life Prediction Studies for Capsules – V 2.0
    Next Post: Creams: SOP for Cleaning Dispensing Equipment – V 2.0

    Standard Operating Procedures V 1.0

    • Aerosols
    • Analytical Method Development
    • Bioequivalence Bioavailability Study
    • Capsule Formulation
    • Clinical Studies
    • Creams
    • Data Integrity
    • Dental Dosage Forms
    • Drug Discovery
    • Environment, Health and Safety
    • Formulation Development
    • Gels
    • Good Distribution Practice
    • Good Warehousing Practices
    • In-Process Control
    • Injectables
    • Liquid Orals
    • Liposome and Emulsion Formulations
    • Lotions
    • Lyophilized Products
    • Maintenance Dept.
    • Medical Devices
    • Metered-Dose Inhaler
    • Microbiology Testing
    • Nanoparticle Formulation
    • Nasal Spray Formulations
    • Nebulizers
    • Ocular (Eye) Dosage Forms
    • Ointments
    • Otic (Ear) Dosage Forms
    • Pharmacovigilance
    • Powder & Granules
    • Purchase Departments
    • Quality Assurance
    • Quality Control
    • Raw Material Stores
    • Regulatory Affairs
    • Tablet Manufacturing
    • Rectal Dosage Forms
    • Transdermal Patches
    • Vaginal Dosage Forms
    • Validations and Qualifications

    Read SOPs in your Language:

     - 
    Bengali
     - 
    bn
    English
     - 
    en
    Gujarati
     - 
    gu
    Hindi
     - 
    hi
    Malayalam
     - 
    ml
    Marathi
     - 
    mr
    Punjabi
     - 
    pa
    Tamil
     - 
    ta
    Telugu
     - 
    te

    NEW! Revised SOPs – V 2.0

    • Aerosols V 2.0
    • Analytical Method Development V 2.0
    • API Manufacturing V 2.0
    • BA-BE Studies V 2.0
    • Biosimilars V 2.0
    • Capsules V 2.0
    • Creams V 2.0
    • Elixers V 2.0
    • Ointments V 2.0
    • Raw Material Warehouse V 2.0
    • Tablet Manufacturing V2.0

    New Publication: A must for All.

    Copyright © 2025 SOP Guide for Pharma.

    Powered by PressBook WordPress theme

    Go to mobile version