Skip to content
  • Clinical Studies
  • Pharma GMP
  • Pharma Tips
  • Stability Studies
  • Pharma Books
  • Schedule M

SOP Guide for Pharma

The Ultimate Resource for Pharmaceutical SOPs and Best Practices

  • Home
  • Job Safety Analysis (JSA)
    • Oral Dosage Forms (Tablets & Capsules)
    • Oral Liquid Dosage Forms (Syrups, Elixirs, Suspensions, Emulsions)
    • Powder and Granule Dosage Forms
    • Topical Dosage Forms (Creams, Ointments, Gels, Lotions, Pastes)
    • Transdermal Dosage Forms (Patches)
  • Standard Test Procedures (STP)
  • SOP – Blog Post
  • Toggle search form

SOP for Installation Qualification (IQ) of Tablet Compression Machines

Posted on By

SOP for Installation Qualification (IQ) of Tablet Compression Machines

Standard Operating Procedure for Installation Qualification (IQ) of Tablet Compression Machines

1) Purpose

The purpose of this Standard Operating Procedure (SOP) is to define the process for performing Installation Qualification (IQ) for tablet compression machines in pharmaceutical manufacturing. This SOP ensures that the tablet compression machine is installed according to manufacturer specifications and meets regulatory requirements. The IQ process verifies that the equipment is correctly installed, and all components are functioning as expected before moving on to the next stages of equipment qualification (Operational Qualification and Performance Qualification).

2) Scope

This SOP applies to the installation qualification of all tablet compression machines used in the pharmaceutical manufacturing process. It covers the installation process, including the verification of equipment, utilities, environment, and documentation required for proper operation. This SOP is applicable to new machines, as well as existing machines that have undergone major repairs or modifications.

3) Responsibilities

Operators: Responsible for assisting with the IQ process, ensuring that the machine is operated according to the manufacturer’s instructions and all parameters are verified.
Quality Assurance (QA): Ensures that the installation of the tablet compression machine complies with this SOP and all applicable regulations. QA is also responsible

for reviewing and approving all IQ documentation and reports.
Production Supervisors: Oversee the installation process to ensure that all necessary steps are followed and documented. They also ensure that operators are trained and the process is performed according to the approved protocol.
Validation Team: Responsible for developing and executing the Installation Qualification protocol, ensuring that all system components are verified according to the specifications.
Maintenance Personnel: Responsible for ensuring that the tablet compression machine is installed and set up correctly and that all utilities, mechanical, and electrical components are functioning as required.

See also  SOP for Qualification of Batch Pasteurizers

4) Procedure

The following steps should be followed for the Installation Qualification (IQ) of tablet compression machines:

1. Pre-Installation Preparation:
1.1 Review equipment manuals and specifications provided by the manufacturer to ensure that the tablet compression machine meets all necessary requirements for installation.
1.2 Verify that all required utilities (electrical, compressed air, vacuum, etc.) are available and meet the necessary specifications for the equipment.
1.3 Ensure that the installation site meets the required environmental conditions (e.g., temperature, humidity, cleanliness) as specified by the equipment manufacturer and regulatory guidelines.
1.4 Prepare and ensure that all necessary tools and resources are available for the installation process.
1.5 Confirm that the machine has been delivered with all components intact, including manuals, spare parts, and accessories.

2. Equipment Installation:
2.1 Install the tablet compression machine according to the manufacturer’s instructions, ensuring all mechanical and electrical components are properly connected.
2.2 Verify the proper installation of all system components such as tablet die sets, feed frames, compression rollers, and control panels.
2.3 Ensure that all safety features, such as emergency stops, protective covers, and safety interlocks, are correctly installed and functional.
2.4 Set up the necessary electrical and mechanical connections, including grounding, to ensure proper operation.
2.5 Perform a visual inspection to confirm that the installation complies with both the manufacturer’s instructions and the specifications outlined in the installation qualification protocol.

3. Verification of Installation:
3.1 Verify that the tablet compression machine is properly calibrated by checking factory-set parameters and comparing them with the manufacturer’s specified settings.
3.2 Inspect the operation of critical machine components, including the tablet press motor, feeders, punches, dies, and ejection systems, to ensure that they are functioning as expected.
3.3 Check the alignment of tablet punches, dies, and compression rollers to confirm that they are positioned correctly and working properly.
3.4 Test the electrical system to ensure that the machine is properly wired, all circuits are connected, and control panels function correctly.
3.5 Ensure that all operator and safety controls are functioning and accessible. Verify that the machine stops when the emergency stop button is pressed and that all safety features are active.
3.6 Conduct a system check to verify that the machine communicates properly with other systems, such as the batch recording system or supervisory control systems, if applicable.

See also  SOP for Validation of Sterilization Processes in Injectables

4. Environmental and Utility Check:
4.1 Verify that all utilities (electrical, compressed air, and other relevant systems) are available and meet the specifications required for the tablet compression machine’s operation.
4.2 Perform checks to ensure that the air quality, temperature, and humidity are within the acceptable range for operation, as specified by the manufacturer.
4.3 Ensure that any water or fluid systems connected to the equipment are functioning properly and are free from leaks or contamination.
4.4 Confirm that the machine is installed in an appropriate environment, meeting cleanliness, safety, and regulatory standards.

5. Documentation and Reporting:
5.1 Complete the Installation Qualification Protocol, documenting all verification checks and results.
5.2 Ensure that all relevant forms and reports are signed and dated by responsible personnel, including operators, maintenance personnel, and QA staff.
5.3 Compile a report summarizing the results of the IQ, including any deviations or issues encountered during installation, corrective actions taken, and final approval status.
5.4 Retain all installation qualification documentation in accordance with internal documentation control procedures and regulatory requirements.
5.5 Prepare for the next stage of qualification, such as Operational Qualification (OQ), once the IQ process is successfully completed and approved.

See also  SOP for Validation of Freeze-Drying Process for Lyophilized Products

6. Requalification:
6.1 Perform requalification of the tablet compression machine if significant modifications are made to the equipment, or if the machine is moved or relocated.
6.2 Periodically review and verify the installation process, particularly if any major changes occur to the equipment or surrounding environment.

5) Abbreviations

  • QA: Quality Assurance
  • OQ: Operational Qualification
  • IQ: Installation Qualification
  • OEE: Overall Equipment Effectiveness
  • SOP: Standard Operating Procedure

6) Documents

  • Installation Qualification Protocol
  • Equipment Manufacturer Specifications
  • Electrical and Mechanical Setup Reports
  • Equipment Calibration Logs
  • Process Validation Reports
  • Sign-Off Sheets

7) Reference

  • FDA Guidance for Industry: Equipment Qualification
  • International Council for Harmonisation (ICH) Q7: Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients
  • ISO 9001: Quality Management Systems – Requirements
  • USP Chapter 1151: Pharmaceutical Dosage Forms

8) SOP Version

Version 1.0 – Effective Date: DD/MM/YYYY

Annexure

Template 1: Installation Qualification Checklist

Date Time Operator Initials Checklist Item Pass/Fail
DD/MM/YYYY HH:MM Operator Name Item to be verified Pass/Fail
         

Template 2: Equipment Installation Log

Batch No. Installation Date Component Installed Serial No. Operator Initials
Batch Number DD/MM/YYYY Component Name Serial Number Operator Name
         

Template 3: Final Equipment Inspection Record

Batch No. Inspection Date Inspection Method Result Operator Initials
Batch Number DD/MM/YYYY Inspection Method Pass/Fail Operator Name
         
Validations and Qualifications Tags:Cleaning Validation in Pharmaceutical Industry, Computer System Validation in Pharma, Computer System Validation in Pharmaceuticals, Define Validation in Pharma, Equipment Qualification in Pharma, Method Validation in Pharma, Performance Qualification in Pharma, Pharma Validation, Pharmaceutical Cleaning Validation, Pharmaceutical Method Validation, Pharmaceutical Process Validation, Pharmaceutical Process Validation SOP, Pharmaceutical Validation Definition, Pharmaceutical Validation Services, Process Validation Definition in Pharma, Process Validation in Pharma, Process Validation in Pharma Industry, Process Validation in Pharmaceutical Industry, Prospective Validation in Pharma, Qualification in Pharma, Software Validation in Pharmaceutical Industry, SOP for Analytical Method Validations, SOP for Cleaning Validations, SOP for Equipment Validations, SOP for Process Validation, SOP for Validations, Types of Validation in Pharma, Types of Validation in Pharmaceutical Industry, Validation in Pharmaceutical Industry, Validation Life Cycle in Pharma

Post navigation

Previous Post: SOP for Lead Optimization in Drug Discovery
Next Post: SOP for Selection of Molecular Scaffolds

Standard Operating Procedures V 1.0

  • Aerosols
  • Analytical Method Development
  • Bioequivalence Bioavailability Study
  • Capsule Formulation
  • Clinical Studies
  • Creams
  • Data Integrity
  • Dental Dosage Forms
  • Drug Discovery
  • Environment, Health and Safety
  • Formulation Development
  • Gels
  • Good Distribution Practice
  • Good Warehousing Practices
  • In-Process Control
  • Injectables
  • Liquid Orals
  • Liposome and Emulsion Formulations
  • Lotions
  • Lyophilized Products
  • Maintenance Dept.
  • Medical Devices
  • Metered-Dose Inhaler
  • Microbiology Testing
  • Nanoparticle Formulation
  • Nasal Spray Formulations
  • Nebulizers
  • Ocular (Eye) Dosage Forms
  • Ointments
  • Otic (Ear) Dosage Forms
  • Pharmacovigilance
  • Powder & Granules
  • Purchase Departments
  • Quality Assurance
  • Quality Control
  • Raw Material Stores
  • Regulatory Affairs
  • Tablet Manufacturing
  • Rectal Dosage Forms
  • Transdermal Patches
  • Vaginal Dosage Forms
  • Validations and Qualifications

Read SOPs in your Language:

 - 
Bengali
 - 
bn
English
 - 
en
Gujarati
 - 
gu
Hindi
 - 
hi
Malayalam
 - 
ml
Marathi
 - 
mr
Punjabi
 - 
pa
Tamil
 - 
ta
Telugu
 - 
te

NEW! Revised SOPs – V 2.0

  • Aerosols V 2.0
  • Analytical Method Development V 2.0
  • API Manufacturing V 2.0
  • BA-BE Studies V 2.0
  • Biosimilars V 2.0
  • Capsules V 2.0
  • Creams V 2.0
  • Elixers V 2.0
  • Ointments V 2.0
  • Raw Material Warehouse V 2.0
  • Tablet Manufacturing V2.0

New Publication: A must for All.

Copyright © 2025 SOP Guide for Pharma.

Powered by PressBook WordPress theme

Go to mobile version